Patent US3901846A successfully refreshed from Google Patents.
Patent US4652433A successfully refreshed from Google Patents.
US4652433A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method for the recovery of minerals and production of by-products from coal ash
Assignee: Florida Progress Corp
•
Filing: 1986-01-29
•
Granted: 1987-03-24
•
Expires: 2006-01-29
Abstract
Abstract The method of the present invention is a novel comprehensive process for maximizing the recovery of valuable mineral values from coal ash. Options may also be included for the production of saleable inorganic chemical by-products. The process employs both physical and chemical extraction techniques that maximize the yield of products while reducing the quantity of waste produced. Valuable minerals and chemicals such as cenospheres (hollow microspheres), carbon, magnetite (Fe 3 O 4 ), alumina (Al 2 O 3 ), iron oxide (Fe 2 O 3 ) and iron chloride (FeCl 3 ) may be produced. Due to removal of carbon, magnetite, and iron oxide from the coal ash, the processed ash comprises a quality pozzolan.
Inventors
- 👤 Robert A. Ashworth
- 👤 Larry A. Rodriguez
- 👤 Antonio A. Padilla
- 👤 Ned B. Spake
- 👤 W. Wes Berry
- 👤 Rae A. Schmeda
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-03 22:26
CPC Classifications
C; C04; C04B; C04B20/00; C04B20/02; B; B03; B03B; B03B9/00; B03B9/04; C01; C01F; C01F7/00; C01F7/02; C01F7/20; C01F7/22; C01G; C01G49/00; C01G49/10; C04B18/00; C04B18/04; C04B18/06; C04B18/08; C09; C09C; C09C1/00; C09C1/40; C09C1/405; C09C1/44; C09C1/48; C22; C22B; C22B7/00; C22B7/02; C01P; C01P2004/00; C01P2004/30; C01P2004/32; C01P2004/60; C01P2004/61; C01P2006/00; C01P2006/42; C01P2006/80; Y; Y02; Y02P; Y02P10/00; Y02P10/20; Y02W; Y02W30/00; Y02W30/50; Y02W30/91
Claims Analysis
Total Claims: 20
Claim 1
Independent Claim
440 words
A method for the recovery of mineral values from ash derived from coal gasification and combustion which ash contains carbon, magnetite, cenospheres and mineral values including aluminum and iron, said method comprising the steps of: (a) screening said ash to provide a first carbon and cenosphere-containing ash fraction which contains the major portion of the cenospheres and carbon present in the ash as well as mineral values and a second ash fraction; (b) separating and recovering cenospheres from said first ash fraction to yield a mineral value and carbon-containing ash fraction; (c) removing and recovering said carbon from said carbon-containing ash fraction by froth flotation to separate said carbon from mineral values contained in said fraction; (d) subjecting the mineral value-containing ash fraction produced in step (c) to wet magnetic separation to yield a non-magnetic ash fraction and a magnetite-rich fraction; (e) subjecting said second ash fraction to dry magnetic separation to produce a non-magnetic ash fraction and a magnetite-rich fraction; (f) subjecting the magnetite-rich fraction resulting from step (e) to wet magnetic separation to yield a non-magnetic ash fraction; (g) combining the non-magnetic ash fractions resulting from steps (d), (e) and (f) to provide a combined non-magnetic ash fraction; (h) leaching mineral values from said combined non-magnetic ash fraction by countercurrent contact of said fraction with a hydrochloric acid solution, said leaching occurring at a temperature in the range of about 70° to 110° C. and at a pressure in the range of about 10 to 20 psia; (i) contacting the leach solution resulting from step (h) with an ion exchange resin for removal of iron salts from said solution to provide an iron-lean leach solution and recovering said iron from said ion exchange resin in the form of an iron oxide; (j) concentrating said iron-lean leach solution by removal of water contained therein; (k) sparging anhydrous hydrochloric acid gas at a temperature in the range of about 60° to 80° C. and a pressure in the range of about 10 to 20 psia through said concentrated iron-lean leach solution to precipitate aluminum chloride therefrom in the form of aluminum chloride hexahydrate and recovering said aluminum chloride hexahydrate; (l) washing, drying and calcining said recovered aluminum chloride hexahydrate to yield alumina; (m) washing leached ash produced in said countercurrent leaching step by countercurrent contact with water and recovering said washed ash; (n) drying said washed ash to provide an acid-leached pozzolan; (o) leaching mineral values from the cenospheres recovered in step (b) with an aqueous leach solution of hydrochloric acid; and (p) recovering said leached cenospheres from said leach solution, washing said recovered cenospheres and drying said recovered cenospheres.
Claim 2
Independent Claim
440 words
A method for the recovery of mineral values from ash derived from coal gasification and combustion which ash contains carbon, magnetite, cenospheres and mineral values including aluminum and iron, said method comprising the steps of: (a) screening said ash to provide a first carbon and cenosphere-containing ash fraction which contains the major portion of the cenospheres and carbon present in the ash as well as mineral values and a second ash fraction; (b) separating and recovering cenospheres from said first ash fraction to yield a mineral value and carbon-containing ash fraction; (c) removing and recovering said carbon from said carbon-containing ash fraction by froth flotation to separate said carbon from mineral values contained in said fraction; (d) subjecting the mineral value-containing ash fraction produced in step (c) to wet magnetic separation to yield a non-magnetic ash fraction and a magnetite-rich fraction; (e) subjecting said second ash fraction to dry magnetic separation to produce a non-magnetic ash fraction and a magnetite-rich fraction; (f) subjecting the magnetite-rich fraction resulting from step (e) to wet magnetic separation to yield a non-magnetic ash fraction; (g) combining the non-magnetic ash fractions resulting from steps (d), (e) and (f) to provide a combined non-magnetic ash fraction; (h) leaching mineral values from said combined non-magnetic ash fraction by countercurrent contact of said fraction with a hydrochloric acid solution, said leaching occurring at a temperature in the range of about 70° to 110° C. and at a pressure in the range of about 10 to 20 psia; (i) contacting the leach solution resulting from step (h) with an ion exchange resin for removal of iron salts from said solution to provide an iron-lean leach solution and recovering said iron from said ion exchange resin in the form of an iron oxide; (j) concentrating said iron-lean leach solution by removal of water contained therein; (k) sparging anhydrous hydrochloric acid gas at a temperature in the range of about 60° to 80° C. and a pressure in the range of about 10 to 20 psia through said concentrated iron-lean leach solution to precipitate aluminum chloride therefrom in the form of aluminum chloride hexahydrate and recovering said aluminum chloride hexahydrate; (l) washing, drying and calcining said recovered aluminum chloride hexahydrate to yield alumina; (m) washing leached ash produced in said countercurrent leaching step by countercurrent contact with water and recovering said washed ash; (n) drying said washed ash to provide an acid-leached pozzolan; (o) leaching mineral values from the cenospheres recovered in step (b) with an aqueous leach solution of hydrochloric acid; and (p) recovering said leached cenospheres from said leach solution, washing said recovered cenospheres and drying said recovered cenospheres.
Claim 3
Dependent Claim
23 words
The method of claim 1 wherein the mineral value-containing ash fraction produced in step (c) is wet ground prior to wet magnetic separation.
Claim 4
Dependent Claim
33 words
The method of claim 2 wherein the fractions produced in step (c) is wet ground to a size in the range of 100 percent -200 Tyler mesh to 100 percent -325 Tyler mesh.
Claim 5
Dependent Claim
26 words
The method of claim 1 wherein ferric chloride is removed from the leach solution by contact of same with an ion exchange resin in step (i).
Claim 6
Dependent Claim
31 words
The method of claim 4 wherein said ferric chloride is removed from said ion exchange resin by washing, with said ferric chloride being subjected to iron hydrolysis to yield iron oxide.
Claim 7
Dependent Claim
26 words
The method of claim 1 wherein said aluminum chloride hexahydrate from step (k) is washed with a hydrochloric acid solution to remove other soluble metal chlorides.
Claim 8
Dependent Claim
26 words
The method of claim 1 wherein the non-magnetic ash fraction resulting from step (g) is reduced in water content prior to being leached in step (h).
Claim 9
Dependent Claim
18 words
The method of claim 7 wherein the ash fraction is reduced in water content by thickening and centrifuging.
Claim 10
Dependent Claim
20 words
The method of claim 1 wherein the magnetite-rich fractions resulting from steps (d) and (f) are dried to yield magnetite.
Claim 11
Dependent Claim
17 words
The method of claim 1 wherein a series of countercurrent leach steps are employed in step (h).
Claim 12
Dependent Claim
31 words
The method of claim 10 wherein ash leachate from each leach step is clarified to increase the solids content of the leachate prior to passage to the next downstream leach step.
Claim 13
Dependent Claim
22 words
The method of claim 11 wherein the ash leachate is clarified to increase the solids content to approximately 60 percent by weight.
Claim 14
Dependent Claim
28 words
The method of claim 11 wherein the clarified solution resulting from the clarification step is passed to the next upstream leach step to serve as the leaching solution.
Claim 15
Dependent Claim
25 words
The method of claim 1 wherein the hydrochloric acid leach solution which is employed in the last leach step in the series is approximately 8N.
Claim 16
Dependent Claim
17 words
The method of claim 1 wherein a series of countercurrent wash steps are employed in step (m).
Claim 17
Dependent Claim
38 words
The method of claim 15 wherein said leached ash is washed in said series of countercurrent wash steps to an extent sufficient to yield a solution containing from about 0.5 to 3.0 percent by weight of metallic salts.
Claim 18
Dependent Claim
26 words
The method of claim 1 wherein said acid leaching in step (h) occurs at a temperature in the range of from about 90° to 99° C.
Claim 19
Dependent Claim
26 words
The method of claim 1 wherein the leach solution employed in step (h) has a free acid normality in the range of about 3 to 8N.
Claim 20
Dependent Claim
47 words
The method of claim 1 wherein said ash is screened to provide a first ash fraction which contains at least about 90 percent by weight of the cenospheres present in the ash and at least about 60 percent by weight of the carbon present in the ash.
References Cited (Backward Citations)
US2174825A
Cited
US4243640A
Cited
US4252777A
Cited
US4242313A
Cited
US4319988A
Cited
JPS5719343A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1990-03-23 | 1990-09-22 | 1991-03-24 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1994-03-23 | 1994-09-22 | 1995-03-24 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1998-03-23 | 1998-09-22 | 1999-03-24 | $7700.00 | Window Closed / Lapsed |