Patent US4647305A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4647305A Expired / Lapsed US ⏱️ 0.0 years remaining

Process for manufacturing amorphous alloy powders

Assignee: Nippon Kinzoku Co Ltd
•
Filing: 1984-07-12
•
Granted: 1987-03-03
•
Expires: 2004-07-12
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A process for manufacturing amorphous alloy powders is provided, wherein, a high-speed fluid jet is blown against a flowing melt of an alloy which can be formed into amorphous powders, thereby powerizing the melt and rapidly cooling and solidifying the melt. Use is made of an action tube in which pressure is reduced and turbulent flow is caused so as to increase the cooling rate of the powderized alloy and to form particles of irregular shape. Further, the powderized alloy particles are forced to forcibly collide against a block to increase the cooling rate of the alloy and to form particles of irregular shape.

Inventors

  • 👤 Ko Kumai
  • 👤 Tatsuhiko Noda
  • 👤 Tadashi Ichiyama
  • 👤 Takashi Satoh

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 15:48
CPC Classifications
B; B22; B22F; B22F9/00; B22F9/02; B22F9/06; B22F9/08; B22F9/082; B22F9/002; B22F9/008; C; C22; C22C; C22C45/00

Claims Analysis

Total Claims: 24
Claim 1
Independent Claim 185 words
A process for manufacturing amorphous alloy powders, comprising the steps of: causing the melt of an alloy, which can be made amorphous, to flow down from a nozzle provided at the bottom of a crucible filled with the melt; blowing a high-speed liquid from a spraying nozzle against the melt flowing downwards from the nozzle, thereby powderizing the melt; introducing the powderized alloy and a high-speed liquid into an action tube extending along the stream of the melt of the alloy and surrounding the atomizing zone positioned under a spraying nozzle, said action tube having an upper and lower chamber formed above and below the action tube; and the pressure in said upper chamber is lower as much as 20 mm H 2 O to 200 mm H 2 O than that in said lower chamber; and colliding the powderized alloy against the high-speed liquid due to the pressure reduction and turbulent flow in the action tube, thereby achieving a rapid heat exchange between the powderized alloy and the high-speed liquid, and causing rapid cooling and solidifying of the powderized alloy to form amorphous powders.
Claim 2
Dependent Claim 185 words
A process for manufacturing amorphous alloy powders, comprising the steps of: causing the melt of an alloy, which can be made amorphous, to flow down from a nozzle provided at the bottom of a crucible filled with the melt; blowing a high-speed liquid from a spraying nozzle against the melt flowing downwards from the nozzle, thereby powderizing the melt; introducing the powderized alloy and a high-speed liquid into an action tube extending along the stream of the melt of the alloy and surrounding the atomizing zone positioned under a spraying nozzle, said action tube having an upper and lower chamber formed above and below the action tube; and the pressure in said upper chamber is lower as much as 20 mm H 2 O to 200 mm H 2 O than that in said lower chamber; and colliding the powderized alloy against the high-speed liquid due to the pressure reduction and turbulent flow in the action tube, thereby achieving a rapid heat exchange between the powderized alloy and the high-speed liquid, and causing rapid cooling and solidifying of the powderized alloy to form amorphous powders.
Claim 3
Dependent Claim 55 words
A process according to claim 1, wherein the alloy which can be made amorphous is of an alloy selected from the group consisting of a eutectic alloy and a quasi-eutectic alloy which have a composition consisting of 65 to 85 atomic percent of the transition metal and 15 to 35 atomic percent of a metalloid.
Claim 4
Dependent Claim 49 words
A process according to claim 2, wherein the transition metal is at least one metal element selected from the group consisting of iron, nickel, chromium, cobalt and vanadium, and the metalloid is at least one metalloid element selected from the group consisting of boron, carbon, silicon, phosphorus, and germanium.
Claim 5
Dependent Claim 41 words
A process according to claim 1, wherein the alloy which can be made amorphous comprises an alloy selected from the group consisting of an intermetallic compound alloy and a quasi-intermetallic compound alloy which comprise a combination of one or more metals.
Claim 6
Dependent Claim 49 words
A process according to claim 1, wherein the alloy which can be made amorphous comprises an alloy selected from the group consisting of an intermetallic compound alloy and a quasi-intermetallic compound alloy which comprise a combination of one or more metals with one or more rare earth metal elements.
Claim 7
Dependent Claim 32 words
A process according to claim 1, wherein said spraying nozzle emits a high-speed liquid jet in the form of an inverted cone, the merging angle of this jet being 30° to 100°.
Claim 8
Dependent Claim 13 words
A process according to claim 1, wherein the high-speed liquid jet is water.
Claim 9
Dependent Claim 25 words
A process according to claim 7, wherein water as the high-speed liquid jet is sprayed at pressure of not lower than 80 kgf/cm 2 .
Claim 10
Dependent Claim 46 words
A process according to claim 1, wherein the action tube has inner diameter which is 0.2 to 3.0 times as much as inner diameter of the opening of the said spraying nozzle, and the said action tube has a length of not less than 10 cm.
Claim 11
Dependent Claim 31 words
A process according to claim 1, wherein the pressure in the said upper chamber is lower as much as 40 to 200 mmH 2 O than that inside said lower chamber.
Claim 12
Dependent Claim 58 words
A process according to claim 1, wherein an overflowing exhaust pipe is connected to a lower side of a tank which has the said spraying nozzle and the said action tube therein, and a powder buffer plate is arranged at a position just under the said action tube at a distance therefrom and above the said exhaust pipe.
Claim 13
Dependent Claim 142 words
A process for manufacturing amorphous alloy powders comprising the steps of: causing the melt of an alloy, which can be made amorphous, to flow down from a nozzle provided at the bottom of a crucible filled with the melt and the step of blowing a high-speed liquid from a spraying nozzle against the melt flowing dowards from the nozzle, thereby powderizing the melt; colliding the powderized alloy against a block arranged immediately below a convergence point of the high speed liquid from the spraying nozzle and by a given distance, said block having cooling means for cooling the melt and having a conical top part opposing the lower end of said spraying nozzle; achieving a rapid heat exchange between the powderized alloy and the high-speed liquid due to the collision; and rapidly cooling and solidifying the powderized alloy, thus forming amorphous powders.
Claim 14
Dependent Claim 142 words
A process for manufacturing amorphous alloy powders comprising the steps of: causing the melt of an alloy, which can be made amorphous, to flow down from a nozzle provided at the bottom of a crucible filled with the melt and the step of blowing a high-speed liquid from a spraying nozzle against the melt flowing dowards from the nozzle, thereby powderizing the melt; colliding the powderized alloy against a block arranged immediately below a convergence point of the high speed liquid from the spraying nozzle and by a given distance, said block having cooling means for cooling the melt and having a conical top part opposing the lower end of said spraying nozzle; achieving a rapid heat exchange between the powderized alloy and the high-speed liquid due to the collision; and rapidly cooling and solidifying the powderized alloy, thus forming amorphous powders.
Claim 15
Dependent Claim 55 words
A process according to claim 12, wherein the alloy which can be made amorphous is of an alloy selected from the group consisting of a eutectic alloy and a quasi-eutectic alloy which have a composition consisting of 65 to 85 atomic percent of the transition metal and 15 to 35 atomic percent of a metalloid.
Claim 16
Dependent Claim 49 words
A process according to claim 12, wherein the transition metal is at least one metal element selected from the group consisting of iron, nickel, chromium, cobalt and vanadium, and the metalloid is at least one metalloid element selected from the group consisting of boron, carbon, silicon, phosphorus, and germanium.
Claim 17
Dependent Claim 41 words
A process according to claim 12, wherein the alloy which can be made amorphous comprises an alloy selected from the group consisting of an intermetallic compound alloy and a quasi-intermetallic compound alloy which comprise a combination of one or more metals.
Claim 18
Dependent Claim 49 words
A process according to claim 12, wherein the alloy which can be made amorphous comprises an alloy selected from the group consisting of an intermetallic compound alloy and a quasi-intermetallic compound alloy which comprise a combination of one or more metals with one or more rare earth metal elements.
Claim 19
Dependent Claim 32 words
A process according to claim 12, wherein said spraying nozzle emits a high-speed liquid jet in the form of an inverted cone, the merging angle of this jet being 30° to 100°.
Claim 20
Dependent Claim 13 words
A process according to claim 12, wherein the high-speed liquid jet is water.
Claim 21
Dependent Claim 25 words
A process according to claim 18, wherein water as the high-speed fluid jet is sprayed at pressure of not lower than 80 kgf/cm 2 .
Claim 22
Dependent Claim 22 words
A process according to claim 12, wherein the conical top part of said block has a tapered angle of 30° to 150°.
Claim 23
Dependent Claim 48 words
A process according to claim 12, wherein a hollow scattering prevention wall member is arranged at a distance from and around said block for cooling the melt, said scattering prevention wall member preventing the particles of the melt of the alloy from scattering upon collision against said block.
Claim 24
Dependent Claim 27 words
A process according to claim 21, wherein said wall member has inner diameter which is larger than outer diameter of said block by 10 to 100 mm.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1990-03-02 1990-09-01 1991-03-03 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1994-03-02 1994-09-01 1995-03-03 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1998-03-02 1998-09-01 1999-03-03 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag