Claims Analysis
Total Claims: 12
Claim 1
Independent Claim
196 words
A structure for creating and controlling an artificial water table, comprising in combination: a substantially watertight basin having a floor; a ballast layer covering the floor of said substantially watertight basin to a substantially uniform thickness and including interstices through which water can flow in any direction; a fine layer composed predominatly of fine particulate matter through which water is dispersed by capillary action; permeable means through which water can pass readily but through which the fine particulate matter of said fine layer cannot pass, disposed on top of said ballast layer, and on which said fine layer is overlaid, whereby said permeable means prevent the fine particulate matter of said fine layer from settling into said ballast layer and clogging the inerstices of said ballast layer thereby choking off the flow of water through said ballast layer; and, control means for maintaining in said ballast layer a present water level that is lower than said permeable means, and for raising the water level at least as high as said permeable means when subsurface irrigation is to be applied, whereby water that contacts said permeable means is drawn upward through said fine layer by capillary action.
Claim 2
Dependent Claim
196 words
A structure for creating and controlling an artificial water table, comprising in combination: a substantially watertight basin having a floor; a ballast layer covering the floor of said substantially watertight basin to a substantially uniform thickness and including interstices through which water can flow in any direction; a fine layer composed predominatly of fine particulate matter through which water is dispersed by capillary action; permeable means through which water can pass readily but through which the fine particulate matter of said fine layer cannot pass, disposed on top of said ballast layer, and on which said fine layer is overlaid, whereby said permeable means prevent the fine particulate matter of said fine layer from settling into said ballast layer and clogging the inerstices of said ballast layer thereby choking off the flow of water through said ballast layer; and, control means for maintaining in said ballast layer a present water level that is lower than said permeable means, and for raising the water level at least as high as said permeable means when subsurface irrigation is to be applied, whereby water that contacts said permeable means is drawn upward through said fine layer by capillary action.
Claim 3
Dependent Claim
19 words
The structure of claim 1 wherein said ballast layer is composed predominantly of objects having generally the same size.
Claim 4
Dependent Claim
18 words
The structure of claim 1 further comprising a finish layer laid down on top of said fine layer.
Claim 5
Dependent Claim
17 words
The structure of claim 1 further comprising in combination: means for removing water from said ballast layer.
Claim 6
Dependent Claim
18 words
The structure of claim 1 wherein said fine layer consists essentially of small particles of a porous material.
Claim 7
Dependent Claim
13 words
The structure of claim 5 wherein said porous material consists essentially of scoria.
Claim 8
Dependent Claim
77 words
The structure of claim 1 wherein said control means further comprise in combination: a reservior communicating with the space occupied by said ballast layer and said fine layer, so that the water level in the reservoir is the same as that in said ballast layer; and, float valve means mounted in said reservoir and responsive to the water level in said reservior to admit water to said reservior when the water level falls below a preset level.
Claim 9
Independent Claim
122 words
A method for applying subsurface irrigation to a finish layer that rests upon a fine layer of particles that in turn rests on a water-permeable membrane that is supported within a watertight basin on a ballast layer of rocks, said method comprising the step of: maintaining a level of water near the top of the ballast layer but below the water permeable membrane between successive irrigations; adding sufficient water to bring the water level up to or above the permeable membrane when irrigation is to be applied; and, lowering the water level to an elevation slightly below the permeable membrane to terminate the irrgation, whereby, only relatively slight changes in the water level are required to switch the irrigation on and off.
Claim 10
Independent Claim
122 words
A method for applying subsurface irrigation to a finish layer that rests upon a fine layer of particles that in turn rests on a water-permeable membrane that is supported within a watertight basin on a ballast layer of rocks, said method comprising the step of: maintaining a level of water near the top of the ballast layer but below the water permeable membrane between successive irrigations; adding sufficient water to bring the water level up to or above the permeable membrane when irrigation is to be applied; and, lowering the water level to an elevation slightly below the permeable membrane to terminate the irrgation, whereby, only relatively slight changes in the water level are required to switch the irrigation on and off.
Claim 11
Independent Claim
86 words
A method for laying down in a watertight basin a number of layers of particulate matter that must each be level and of uniform thickness, said method comprising the steps of: (a) laying down a layer of particulate matter; (b) filling the basin with water to a level that is approximately equal to the average level of the top of the layer; and (c) lowering the high spots in the top of the layer and filling in the low spots in the top of the layer.
Claim 12
Independent Claim
86 words
A method for laying down in a watertight basin a number of layers of particulate matter that must each be level and of uniform thickness, said method comprising the steps of: (a) laying down a layer of particulate matter; (b) filling the basin with water to a level that is approximately equal to the average level of the top of the layer; and (c) lowering the high spots in the top of the layer and filling in the low spots in the top of the layer.