Patent US4549431A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4549431A Expired / Lapsed US ⏱️ 0.0 years remaining

Measuring torque and hook load during drilling

Assignee: Mobil Oil AS
•
Filing: 1984-01-04
•
Granted: 1985-10-29
•
Expires: 2004-01-04
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In a computer aided method of detecting problems in the drilling of a well, the hook load is measured while free rotating, while moving the string out of the well for an incremental distance, and while moving the drill string into the hole the same incremental distance. These hook loads are used in determining the effective friction factor of the drill string as a function of depth. The hook loads and free rotating torque are plotted as a function of time in order to produce an indication of hole problems.

Inventors

  • 👤 Edy Soeiinah

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 16:24
CPC Classifications
E; E21; E21B; E21B44/00

Claims Analysis

Total Claims: 17
Claim 1
Independent Claim 130 words
In the computer-aided method of detecting problems in the drilling of a well in the earth, the method of measuring the pick up, running in and free rotating loads on the drill string at a particular depth of the bit in said well comprising: positioning said bit at said particular depth; free rotating said drill string; while free rotating, measuring the steady state hook load on said drill string; moving said drill string out of said well for an incremental distance; while moving said drill string, measuring and recording the initial and overall maximum hook loads and the steady state hook load; moving said drill string into said well over said distance; while moving, measuring and recording the initial and overall minimum hook loads and the steady state hook load.
Claim 2
Dependent Claim 130 words
In the computer-aided method of detecting problems in the drilling of a well in the earth, the method of measuring the pick up, running in and free rotating loads on the drill string at a particular depth of the bit in said well comprising: positioning said bit at said particular depth; free rotating said drill string; while free rotating, measuring the steady state hook load on said drill string; moving said drill string out of said well for an incremental distance; while moving said drill string, measuring and recording the initial and overall maximum hook loads and the steady state hook load; moving said drill string into said well over said distance; while moving, measuring and recording the initial and overall minimum hook loads and the steady state hook load.
Claim 3
Dependent Claim 40 words
The method recited in claim 1 wherein the rotation of said drill string is stopped for a period of time before the step of moving said drill string out of said hole or moving said drill string into said hole.
Claim 4
Dependent Claim 15 words
The method recited in claim 1 wherein said drill string is rotated slowly and constantly.
Claim 5
Dependent Claim 24 words
The method recited in claim 1 wherein said drill string is moved over the same distance out of said well and into said well.
Claim 6
Dependent Claim 37 words
The method recited in claim 4 wherein said drill string is moved out of said well and into said well for a distance equal to the length of the longest joint of drill pipe in said string.
Claim 7
Dependent Claim 40 words
The method recited in claim 1 further comprising: measuring and recording as a function of time the first and overall maximum hook loads and hook loads and steady state hook load while moving said drill string out of said well.
Claim 8
Dependent Claim 36 words
The method recited in claim 1 further comprising: measuring and recording as a function of time the first and overall minimum hook loads and steady state hook loads while moving said drill string into said well.
Claim 9
Dependent Claim 25 words
The method recited in claim 1 further comprising: measuring and recording the steady state maximum and minimum torque on said drill string while free-rotating it.
Claim 10
Dependent Claim 18 words
The method recited in claim 6, 7, or 8 wherein at least one measurement per second is recorded.
Claim 11
Dependent Claim 29 words
The method recited in claim 8 wherein the step of measuring the torque is carried out by measuring the amperage of the motor used to rotate said drill string.
Claim 12
Dependent Claim 27 words
The method recited in claim 1 further comprising: plotting the measured hook loads as a function of time while moving said drill string out of said well.
Claim 13
Dependent Claim 26 words
The method recited in claim 1 further comprising: plotting the measured hook loads as a function of time while moving said drill string into said well.
Claim 14
Dependent Claim 47 words
The method recited in claim 1 wherein the step of measuring the steady state hook load while free rotating said drill string comprises: measuring the maximum steady state hook load; measuring the minimum steady state hook load; and averaging said maximum and minimum steady state hook loads.
Claim 15
Independent Claim 141 words
The method of detecting problems in the drilling of a well in the earth comprising: successively picking and running in a drill string to engage a bit at the end thereof with the bottom of said well; measuring and recording the free rotating loads as a function of time on said drill string at a particular depth of said bit in said well; measuring and recording hook load as a function of time while moving said drill string out of said well to indicate the first and overall maximum hook loads and steady state hook load; and measuring and recording hook load as a function of time while moving said drill string into said well to indicate the first and overall minimum hook loads and steady state hook load whereby drilling problems are indicated by the recorded function of time measurements.
Claim 16
Independent Claim 141 words
The method of detecting problems in the drilling of a well in the earth comprising: successively picking and running in a drill string to engage a bit at the end thereof with the bottom of said well; measuring and recording the free rotating loads as a function of time on said drill string at a particular depth of said bit in said well; measuring and recording hook load as a function of time while moving said drill string out of said well to indicate the first and overall maximum hook loads and steady state hook load; and measuring and recording hook load as a function of time while moving said drill string into said well to indicate the first and overall minimum hook loads and steady state hook load whereby drilling problems are indicated by the recorded function of time measurements.
Claim 17
Dependent Claim 15 words
The method recited in claim 14 wherein at least one measurement per second is recorded.

References Cited (Backward Citations)

US3324717A Cited
GB1320999A Cited
US3740739A Cited
US3800277A Cited
US3866468A Cited
US4250758A Cited
US4285236A Cited
US4384483A Cited
US4382381A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1988-10-28 1989-04-29 1989-10-29 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1992-10-28 1993-04-29 1993-10-29 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1996-10-28 1997-04-29 1997-10-29 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag