US4384483A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Preventing buckling in drill string
Assignee: Mobil Oil AS
•
Filing: 1981-08-11
•
Granted: 1983-05-24
•
Expires: 2001-08-11
Abstract
Abstract In the drilling of a well, buckling of a drill string is prevented by determining the buoyed weight, sliding friction, and external forces applied to the segments of a drill string and comparing the resultant axial force on each segment with a buckling threshold to indicate when the resultant axial force exceeds the threshold. The azimuth and inclination of segments of the drill string are measured. The forces on the drill string are resolved into the axial and normal components applied to the next shallower segment. From these, the forces applied to each segment are determined.
Inventors
- 👤 Thomas B. Dellinger
- 👤 Wilton Gravley
- 👤 John E. Walraven
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-29 06:38
CPC Classifications
E; E21; E21B; E21B7/00; E21B7/04; E21B7/10; E21B47/00; E21B47/007; E21B47/02; E21B47/022
Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
120 words
The method of preventing buckling of a drill string during drilling of a well in the earth comprising: measuring the forces on, and azimuth and inclination of, segment of said drill string; resolving said forces into the axial and normal components applied to the next shallower segment, said axial and normal components being related to measured azimuth and inclination of said segments; determining the buoyed weight, sliding friction, and external forces applied to said segment of said drill string; repeating the aforesaid steps for successively shallower segments of said drill string; comparing the resultant axial force on each segment of said drill string with a buckling threshold; and indicating when said resultant axial force on any segment exceeds said threshold.
Claim 2
Independent Claim
120 words
The method of preventing buckling of a drill string during drilling of a well in the earth comprising: measuring the forces on, and azimuth and inclination of, segment of said drill string; resolving said forces into the axial and normal components applied to the next shallower segment, said axial and normal components being related to measured azimuth and inclination of said segments; determining the buoyed weight, sliding friction, and external forces applied to said segment of said drill string; repeating the aforesaid steps for successively shallower segments of said drill string; comparing the resultant axial force on each segment of said drill string with a buckling threshold; and indicating when said resultant axial force on any segment exceeds said threshold.
Claim 3
Dependent Claim
62 words
The method recited in claim 1 wherein the step of resolving includes: resolving the buoyed weight, friction and external forces into the axial component along said segment based on the azimuth and inclination of said segment; and resolving said axial component into the axial force applied to the next shallower segment based on the azimuth and inclination of the last named segment.
Claim 4
Dependent Claim
31 words
The method recited in claim 1 wherein the components of said forces normal to each segment are multiplied by the coefficient of friction to determine the sliding friction for each segment.
Claim 5
Dependent Claim
26 words
The method recited in claim 1 wherein the torsional forces reacting each segment are determined and the cumulative torsional forces are determined on all the segments.
Claim 6
Dependent Claim
28 words
The method recited in claim 1 wherein the lowest segment includes a drill bit and wherein the external force applied to said lowest segment is weight on bit.
Claim 7
Dependent Claim
25 words
The method recited in claim 1 wherein simulated values are used to predict changes in forces on the drill string corresponding to the simulated values.
References Cited (Backward Citations)
US3622971A
Cited
US3759489A
Cited
US3968473A
Cited
US4021774A
Cited
US4231252A
Cited
US4303994A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1986-05-23 | 1986-11-22 | 1987-05-24 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1990-05-23 | 1990-11-22 | 1991-05-24 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1994-05-23 | 1994-11-22 | 1995-05-24 | $7700.00 | Window Closed / Lapsed |