Patent US4544034A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4544034A Expired / Lapsed US ⏱️ 0.0 years remaining

Actuation of a gun firing head

Assignee: Halliburton Co
•
Filing: 1983-03-31
•
Granted: 1985-10-01
•
Expires: 2003-03-31
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The method and apparatus for actuating a perforating gun by pressure includes a pressure actuated gun firing head disposed on the perforating gun for detonating the shaped charges of the gun. The gun is attached to a pipe string and located downhole adjacent the formation to be perforated. The pressure actuated firing head includes a housing with a plug and piston. The piston has a firing pin adapted for engagement with the initiator of a perforating gun upon reciprocation within the housing. Initially, the piston is pressure balanced until the time of actuation. The plug is responsive to fluid pressure of a predetermined magnitude at the time of the actuation of the gun firing head. Upon effecting pressure on the plug, the plug unbalances the piston causing the piston to reciprocate. Upon reciprocation of the piston, the firing pin engages the initiator to detonate the shaped charges of the perforating gun. Pressure may be effected on the firing head through the pipe string, or the annulus, or both. The firing head includes a plurality of passageways, as well as the plug and piston, arranged in a manner whereby should leakage of well fluids into the firing head inadvertently occur, the apparatus is rendered inoperative and therefore the firing head cannot inadvertently be fired due to the occurrence of unforeseen intervening circumstances.

Inventors

  • 👤 Flint R. George

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-04 15:39
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/11; E21B43/116; E21B43/1185

Claims Analysis

Total Claims: 24
Claim 1
Independent Claim 151 words
Method of firing a perforating gun which is suspended within a well on the end of a pipe string, comprising the steps of: (1) communicating a fluid flow path from the surface to a firing head adjacent the perforating gun; (2) effecting a predetermined pressure through the fluid flow path to the firing head; (3) closing a passageway through a movable wall reciprocally mounted in a chamber within the firing head in response to the predetermined pressure of step (2); (4) opening a valve in the fluid flow path for fluid communication with one side of the movable wall in the chamber in response to the predetermined pressure of step (2); (5) effecting the predetermined pressure on the one side of the movable wall to cause the movable wall to move; and (6) using the movement of the movable wall of step (5) for detonating the charges of the perforating gun.
Claim 2
Dependent Claim 151 words
Method of firing a perforating gun which is suspended within a well on the end of a pipe string, comprising the steps of: (1) communicating a fluid flow path from the surface to a firing head adjacent the perforating gun; (2) effecting a predetermined pressure through the fluid flow path to the firing head; (3) closing a passageway through a movable wall reciprocally mounted in a chamber within the firing head in response to the predetermined pressure of step (2); (4) opening a valve in the fluid flow path for fluid communication with one side of the movable wall in the chamber in response to the predetermined pressure of step (2); (5) effecting the predetermined pressure on the one side of the movable wall to cause the movable wall to move; and (6) using the movement of the movable wall of step (5) for detonating the charges of the perforating gun.
Claim 3
Dependent Claim 133 words
Method of firing a perforating gun which is suspended downhole in a borehole on the end of a tubing string, wherein the gun includes shaped charges which are connected to an initiator so that the initiator can be activated to detonate the charges, comprising the steps of: (1) elevating the tubing pressure to a first downhole pressure value; (2) moving a first member in response to the pressure value of step (1); (3) using the member movement of step (2) for closing a passageway which extends into a piston; (4) effecting the pressure value of step (1) on one side of the piston to cause the piston to move; (5) using the movement of the piston set forth in step (4) for activating the initiator and thereby detonating the charges of the gun.
Claim 4
Dependent Claim 133 words
Method of firing a perforating gun which is suspended downhole in a borehole on the end of a tubing string, wherein the gun includes shaped charges which are connected to an initiator so that the initiator can be activated to detonate the charges, comprising the steps of: (1) elevating the tubing pressure to a first downhole pressure value; (2) moving a first member in response to the pressure value of step (1); (3) using the member movement of step (2) for closing a passageway which extends into a piston; (4) effecting the pressure value of step (1) on one side of the piston to cause the piston to move; (5) using the movement of the piston set forth in step (4) for activating the initiator and thereby detonating the charges of the gun.
Claim 5
Dependent Claim 57 words
The method of claim 2 wherein there is further included the steps of: forming a first chamber bore and a second chamber below the piston; and, conducting well fluid which may inadvertently leak into the gun into the first chamber, through the piston, and into the second chamber to thereby preclude a pressure differential across the piston.
Claim 6
Dependent Claim 187 words
Method of detonating a perforating gun located on a pipe string and positioned downhole in a borehole, comprising the steps of: (1) arranging the perforating gun in a manner to be detonated by an initiator; (2) placing a first and a second piston, respectively, in spaced relationship within a first and a second cylinder, respectively; (3) positioning the initiator, first and second pistons, first and second cylinders to form a first chamber between the initiator and the first piston, and to form a second chamber between the first piston and the second cylinder; (4) forming a passageway along the axial centerline of the first piston into which one end of the second piston can be sealingly received; (5) forming a flow path which extends from the interior of the tubing string, into the second cylinder, and into the second chamber when the second piston is sealingly reciprocated into the passageway of the first piston, thereby providing a means by which an increased pressure effected within the tubing string also effects a pressure differential across the first piston, thereby driving the first piston downwardly and exploding the initiator.
Claim 7
Dependent Claim 187 words
Method of detonating a perforating gun located on a pipe string and positioned downhole in a borehole, comprising the steps of: (1) arranging the perforating gun in a manner to be detonated by an initiator; (2) placing a first and a second piston, respectively, in spaced relationship within a first and a second cylinder, respectively; (3) positioning the initiator, first and second pistons, first and second cylinders to form a first chamber between the initiator and the first piston, and to form a second chamber between the first piston and the second cylinder; (4) forming a passageway along the axial centerline of the first piston into which one end of the second piston can be sealingly received; (5) forming a flow path which extends from the interior of the tubing string, into the second cylinder, and into the second chamber when the second piston is sealingly reciprocated into the passageway of the first piston, thereby providing a means by which an increased pressure effected within the tubing string also effects a pressure differential across the first piston, thereby driving the first piston downwardly and exploding the initiator.
Claim 8
Dependent Claim 40 words
The method of claim 4 and further including the steps of: arranging the first and second pistons, the first and second cylinders, the first and second chambers, and the initiator along a common axial centerline and within a common body.
Claim 9
Dependent Claim 70 words
The method of claim 4, and further including the steps of extending the second piston upwardly into the flow path which is in communication with the interior of the tubing; and, impacting one end of the second piston with sufficient force to move the second piston into sealed relationship with the passageway so that pressure subsequently effected within the tubing string also provides a pressure differential across the first piston.
Claim 10
Dependent Claim 51 words
The method of claim 4, said passageway extends from the second chamber, through the first piston, and into the first chamber so that inadvertent leakage of incompressible well fluids into the second chamber provides a fluid on the opposed sides of the first piston and prevents the first piston from moving.
Claim 11
Dependent Claim 79 words
The method of claim 7 and further including the steps of: extending the upper end of the second piston upwardly into an area which is in communication with the interior of the tubing; and, running a mass downhole through the tubing string and impacting one end of the second piston to move the second piston into sealed relationship with the passageway so that pressure subsequently effected within the tubing string also provides a pressure differential across the first piston.
Claim 12
Dependent Claim 79 words
The method of claim 4 and further including the steps of: arranging a port through the second piston; receiving the second piston in the second cylinder prior to effecting the pressure differential across the first piston; sealing the port to fluid flow from the flow path when the second piston is received in the second cylinder; communicating the flow path with the second chamber through the port upon the second piston reciprocating into the passageway of the first piston.
Claim 13
Dependent Claim 70 words
The method of claim 4 and further including the steps of: forming a port through the second piston; receiving the second piston is the second cylinder prior to effecting the pressure differential across the first piston; conducting well fluid which may inadvertently leak between the second piston and cylinder through the port and into the second chamber to preclude a premature reciprocation of the second piston in the second cylinder.
Claim 14
Dependent Claim 130 words
Method of perforating a highly deviated well comprising the steps of: suspending a perforating gun on a pipe string extending down into the highly deviated well; setting a packer disposed on the pipe string above the perforating gun; communicating a fluid flow path from the surface to a firing head adjacent the perforating gun; effecting a predetermined pressure through the flow path to the firing head; opening a valve in the flow path for fluid communication with one side of a movable member reciprocally disposed in a chamber in the firing head in response to the predetermined pressure; effecting the predetermined pressure on the one side of the movable member to cause the movable member to move; and using the movement of the movable member to actuate the perforating gun.
Claim 15
Dependent Claim 130 words
Method of perforating a highly deviated well comprising the steps of: suspending a perforating gun on a pipe string extending down into the highly deviated well; setting a packer disposed on the pipe string above the perforating gun; communicating a fluid flow path from the surface to a firing head adjacent the perforating gun; effecting a predetermined pressure through the flow path to the firing head; opening a valve in the flow path for fluid communication with one side of a movable member reciprocally disposed in a chamber in the firing head in response to the predetermined pressure; effecting the predetermined pressure on the one side of the movable member to cause the movable member to move; and using the movement of the movable member to actuate the perforating gun.
Claim 16
Dependent Claim 37 words
The method of claim 11 further including the steps of: forming the fluid flow path in the flow bore of the pipe string and filling the pipe string with a fluid prior to detonation of the gun.
Claim 17
Dependent Claim 55 words
The method of claim 12 further including the steps of: opening the pipe string at a point below the packer to the flow of hydrocarbons from the well formation; reducing the predetermined pressure in the flow path; and flowing hydrocarbons from the formation and through the flow bore of the pipe string to the surface.
Claim 18
Dependent Claim 280 words
Method of testing a formation in a well comprising the steps of: mounting a first perforating gun and firing head on a pipe string; mounting a second perforating gun and firing head on the pipe string; running the pipe string into the well; setting a packer disposed on the pipe string above the first perforating gun; communicating the firing head of the first perforating gun with a fluid flow path to the surface; locating the first perforating gun adjacent a first formation to be tested; effecting a predetermined pressure through the flow path to the firing head of the first perforating gun; effecting the predetermined pressure on one side of a movable member reciprocably disposed in a chamber in the firing head of the first perforating gun to cause the movable member to move; using the movement of the movable member to actuate the first perforating gun and communicate the first formation with the wellbore; testing a parameter of the first formation; setting another packer to isolate the first formation from a second formation in the well; communicating the firing head of the second perforating gun with the fluid flow path to the surface; effecting another predetermined pressure greater than the first mentioned predetermined pressure through the flow path to the firing head of the second perforating gun; effecting the another predetermined pressure on one side of the movable member reciprocably disposed in a chamber in the firing head of the second perforating gun to cause the movable member to move; using the movement of the movable member to actuate the second perforating gun and communicate the second formation with the wellbore; and testing a parameter of the second formation.
Claim 19
Dependent Claim 280 words
Method of testing a formation in a well comprising the steps of: mounting a first perforating gun and firing head on a pipe string; mounting a second perforating gun and firing head on the pipe string; running the pipe string into the well; setting a packer disposed on the pipe string above the first perforating gun; communicating the firing head of the first perforating gun with a fluid flow path to the surface; locating the first perforating gun adjacent a first formation to be tested; effecting a predetermined pressure through the flow path to the firing head of the first perforating gun; effecting the predetermined pressure on one side of a movable member reciprocably disposed in a chamber in the firing head of the first perforating gun to cause the movable member to move; using the movement of the movable member to actuate the first perforating gun and communicate the first formation with the wellbore; testing a parameter of the first formation; setting another packer to isolate the first formation from a second formation in the well; communicating the firing head of the second perforating gun with the fluid flow path to the surface; effecting another predetermined pressure greater than the first mentioned predetermined pressure through the flow path to the firing head of the second perforating gun; effecting the another predetermined pressure on one side of the movable member reciprocably disposed in a chamber in the firing head of the second perforating gun to cause the movable member to move; using the movement of the movable member to actuate the second perforating gun and communicate the second formation with the wellbore; and testing a parameter of the second formation.
Claim 20
Dependent Claim 46 words
The method of claim 14 further including the steps of: forming the fluid flow path in the flow bore of the pipe string and communicating the firing heads with the flow bore; and filling the pipe string with a fluid prior to detonation of the gun.
Claim 21
Dependent Claim 30 words
The method of claim 15 further including the steps of: opening the pipe string at points below the packers to the flow of hydrocarbons from the formations to be tested.
Claim 22
Dependent Claim 135 words
Method of firing a perforating gun which is suspended within a well on a pipe string, comprising the steps of: communicating a flow path from the surface to a firing head adjacent the perforating gun; filling the flow path with a fluid; effecting a predetermined pressure through the flow path to the firing head; lowering a mass through the pipe string to close a passageway through a moveable wall reciprocably mounted in a chamber within the firing head and to open a valve in the flow path for fluid communication with one side of the movable wall in the chamber; effecting the predetermined pressure on the one side of the movable wall to cause the movable wall to move; and using the movement of the movable wall for detonating the charges of the perforating gun.
Claim 23
Dependent Claim 135 words
Method of firing a perforating gun which is suspended within a well on a pipe string, comprising the steps of: communicating a flow path from the surface to a firing head adjacent the perforating gun; filling the flow path with a fluid; effecting a predetermined pressure through the flow path to the firing head; lowering a mass through the pipe string to close a passageway through a moveable wall reciprocably mounted in a chamber within the firing head and to open a valve in the flow path for fluid communication with one side of the movable wall in the chamber; effecting the predetermined pressure on the one side of the movable wall to cause the movable wall to move; and using the movement of the movable wall for detonating the charges of the perforating gun.
Claim 24
Dependent Claim 73 words
The method of claim 17 and further including the steps of: raising the pressure down the flow path to a level above the predetermined pressure in case the mass fails to close the passageway or open the valve; effecting the additional pressure onto a piston member in the valve; moving the piston member to open the valve; and effecting the additional pressure and predetermined pressure on the one side of the movable member.

References Cited (Backward Citations)

US2749840A Cited
US3011551A Cited
US3040808A Cited
US3138206A Cited
US3189094A Cited
US3185224A Cited
US3612189A Cited
US3706344A Cited
US3706344B1 Cited
US3800705A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1988-09-30 1989-04-01 1989-10-01 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1992-09-30 1993-04-01 1993-10-01 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1996-09-30 1997-04-01 1997-10-01 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag