Patent US4439235A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4439235A Expired / Lapsed US ⏱️ 0.0 years remaining

Chlorination process for removing precious metals from ore

Assignee: Individual
•
Filing: 1982-06-14
•
Granted: 1984-03-27
•
Expires: 2002-06-14
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A process for removing precious metals from comminuted ores. The process comprises the steps of first contacting comminuted ore with a primary acidic hypochlorite solution, separating the ore from the primary hypochlorite solution and then contacting the separated ore with an aqueous hypochlorite solution having a pH greater than 7.

Inventors

  • 👤 Charles H. Simpson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-03 09:01
CPC Classifications
C; C22; C22B; C22B11/00; C22B11/04

Claims Analysis

Total Claims: 3
Claim 1
Independent Claim 199 words
A process for removing precious metal values from comminuted carbonaceous ores, comprising the steps of (a) contacting said comminuted ore at an elevated temperature below 100° C. with an effective amount of an acidic aqueous solution of hypochlorite, iron ion and an acid to form an extraction mixture slurry including (i) an aqueous liquid component including said hypochlorite, iron ion and acid and containing precious metal values from said comminuted ore dissolved therein, and (ii) a solid component comprising said comminuted extracted ore, (b) separating said liquid and solid components of said extraction mixture slurry, (c) contacting said separated solid component of said extraction mixture slurry at an elevated temperature below 100° C. with an effective amount of an aqueous solution of hypochlorite and iron having a pH greater than 7 to form a secondary extraction mixture slurry including (i) a secondary aqueous liquid component including said hypochlorite and iron ion and containing precious metal values from said comminuted ore dissolved therein; and (ii) a secondary solid component comprising twice extracted comminuted ore, (d) separating said liquid and solid components of said secondary extraction mixture slurry; and (e) removing said precious metal values from said separated secondary liquid component.
Claim 2
Dependent Claim 199 words
A process for removing precious metal values from comminuted carbonaceous ores, comprising the steps of (a) contacting said comminuted ore at an elevated temperature below 100° C. with an effective amount of an acidic aqueous solution of hypochlorite, iron ion and an acid to form an extraction mixture slurry including (i) an aqueous liquid component including said hypochlorite, iron ion and acid and containing precious metal values from said comminuted ore dissolved therein, and (ii) a solid component comprising said comminuted extracted ore, (b) separating said liquid and solid components of said extraction mixture slurry, (c) contacting said separated solid component of said extraction mixture slurry at an elevated temperature below 100° C. with an effective amount of an aqueous solution of hypochlorite and iron having a pH greater than 7 to form a secondary extraction mixture slurry including (i) a secondary aqueous liquid component including said hypochlorite and iron ion and containing precious metal values from said comminuted ore dissolved therein; and (ii) a secondary solid component comprising twice extracted comminuted ore, (d) separating said liquid and solid components of said secondary extraction mixture slurry; and (e) removing said precious metal values from said separated secondary liquid component.
Claim 3
Dependent Claim 47 words
The process of claim 1 wherein the basic aqueous solution of step (c) is formed by adding to said liquid component of step (b) the amount of base necessary to increase the pH of said liquid component of step (b) to a selected point greater than 7.

References Cited (Backward Citations)

GB190617441A Cited
US1066855A Cited
US2438781A Cited
US2829966A Cited
US3627482A Cited
US4342592A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1987-03-27 1987-09-26 1988-03-27 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1991-03-27 1991-09-26 1992-03-27 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1995-03-27 1995-09-26 1996-03-27 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag