Patent US4304298A successfully refreshed from Google Patents.
US4304298A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Well cementing process and gasified cements useful therein
Assignee: Halliburton Co
•
Filing: 1979-05-10
•
Granted: 1981-12-08
•
Expires: 1999-05-10
Abstract
Abstract A process for cementing adjacent a subterranean gas-containing zone, in which process a cement slurry containing a stabilized, dispersed gas is placed adjacent the zone. Sufficient gas is present in the cement slurry or is capable of being generated within the slurry to prevent the connate formation gas under pressure from passing into or around the cement prior to the time the cement has set up.
Inventors
- 👤 David L. Sutton
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-02 08:11
CPC Classifications
C; C04; C04B; C04B22/00; C04B22/0013; C04B22/02; C04B22/08; C04B22/12; C04B28/00; C04B28/02; C09; C09K; C09K8/00; C09K8/42; C09K8/46
Claims Analysis
Total Claims: 24
Claim 1
Independent Claim
106 words
A process for cementing a zone under pressure comprising pumping a compressible hydraulic cement slurry into said zone having a fluid loss less than about 1,000 cc per 30 minutes at in-place conditions, including in said cement slurry a pressurizing agent for said slurry by adding a means for generating an effective amount of a gas comprising a gas generating agent to maintain the initial compressibility of said slurry at least 25% percent greater than the compressibility of said slurry without the gas and maintaining sufficient gas in the slurry to prevent substantial reduction in the pressure of said slurry during transition to a solid state.
Claim 2
Dependent Claim
106 words
A process for cementing a zone under pressure comprising pumping a compressible hydraulic cement slurry into said zone having a fluid loss less than about 1,000 cc per 30 minutes at in-place conditions, including in said cement slurry a pressurizing agent for said slurry by adding a means for generating an effective amount of a gas comprising a gas generating agent to maintain the initial compressibility of said slurry at least 25% percent greater than the compressibility of said slurry without the gas and maintaining sufficient gas in the slurry to prevent substantial reduction in the pressure of said slurry during transition to a solid state.
Claim 3
Dependent Claim
16 words
A process of claim 1 wherein said gas generating agent is added in a liquid carrier.
Claim 4
Dependent Claim
20 words
A process of claim 2 wherein said liquid carrier comprises a polyhydricalcohol, a water-compatible organic carrier or a mixture thereof.
Claim 5
Dependent Claim
12 words
A process of claim 3 wherein said liquid carrier comprises ethylene glycol.
Claim 6
Dependent Claim
17 words
A process of claim 1 wherein means for preventing premature gelation is added to said cement slurry.
Claim 7
Dependent Claim
22 words
A process of claim 5 wherein means for preventing premature gelation is an accelerator compound which prevents premature gelation of the cement.
Claim 8
Dependent Claim
18 words
A process of claim 5 wherein the means for preventing premature gelation is an alkaline earth metal halide.
Claim 9
Dependent Claim
30 words
A process of claim 1 wherein the means for generating a gas is selected so that most of the gas is produced after the slurry is being pumped into place.
Claim 10
Dependent Claim
40 words
A process of claim 1 wherein said gas generating agent is selected so that substantial generation of the gas does not commence until the slurry is being pumped into place and is not finished until the onset of initial set.
Claim 11
Dependent Claim
29 words
A process of claim 1 wherein said gas generation agent is selected to assure substantially complete reaction within about one-half hour after the slurry has been pumped into place.
Claim 12
Dependent Claim
120 words
A process for primary cementing in the annulus between a well casing and a bore hole comprising: placing in the annulus a column of cement slurry containing a stable volume of at least 0.1 SCF of gas per cubic foot of cement slurry at a time prior to the initial set of the slurry, wherein the gas is formed in situ by mixing particulate aluminum in an amount of from about 0.02 to about 5.0 percent by weight of dry cement in the slurry prior to placement of the slurry in the annulus; and maintaining sufficient gas in the slurry to prevent substantial reduction in the pressure in the slurry column during transition of the slurry to a solid state.
Claim 13
Dependent Claim
120 words
A process for primary cementing in the annulus between a well casing and a bore hole comprising: placing in the annulus a column of cement slurry containing a stable volume of at least 0.1 SCF of gas per cubic foot of cement slurry at a time prior to the initial set of the slurry, wherein the gas is formed in situ by mixing particulate aluminum in an amount of from about 0.02 to about 5.0 percent by weight of dry cement in the slurry prior to placement of the slurry in the annulus; and maintaining sufficient gas in the slurry to prevent substantial reduction in the pressure in the slurry column during transition of the slurry to a solid state.
Claim 14
Dependent Claim
148 words
A process for primary cementing in the annulus between a well casing and a bore hole comprising: placing in the annulus a column of cement slurry containing a stable volume of at least 0.1 SCF of gas per cubic foot of cement slurry at a time prior to the initial set of the slurry, wherein the gas is formed in situ by dispersing in the slurry prior to placement about 0.02-5.0 percent by weight of the dry cement a material selected from the group consisting of CaCl 2 , ZrOCl 2 , ZrCl 4 , Ca 3 N 2 , KBH 4 , metals which release hydrogen from an aqueous alkaline solution in accordance with the EMF series, and mixtures thereof; and maintaining sufficient gas in the slurry to prevent substantial reduction in the pressure in the slurry column during transition of the slurry to a solid state.
Claim 15
Dependent Claim
148 words
A process for primary cementing in the annulus between a well casing and a bore hole comprising: placing in the annulus a column of cement slurry containing a stable volume of at least 0.1 SCF of gas per cubic foot of cement slurry at a time prior to the initial set of the slurry, wherein the gas is formed in situ by dispersing in the slurry prior to placement about 0.02-5.0 percent by weight of the dry cement a material selected from the group consisting of CaCl 2 , ZrOCl 2 , ZrCl 4 , Ca 3 N 2 , KBH 4 , metals which release hydrogen from an aqueous alkaline solution in accordance with the EMF series, and mixtures thereof; and maintaining sufficient gas in the slurry to prevent substantial reduction in the pressure in the slurry column during transition of the slurry to a solid state.
Claim 16
Dependent Claim
115 words
A process for primary cementing in the annulus between a well casing and a bore hole comprising: placing in the annulus a column of cement slurry containing a stable volume of at least 0.1 SCF of gas per cubic foot of cement slurry at a time prior to the initial set of the slurry, wherein the gas is formed in situ by dispersing in the slurry prior to placement an effective amount of a metal selected from the group consisting of Al, Ca, Zn, Mg and mixtures thereof; and maintaining sufficient gas in the slurry to prevent substantial reduction in the pressure in the slurry column during transition of the slurry to a solid state.
Claim 17
Dependent Claim
115 words
A process for primary cementing in the annulus between a well casing and a bore hole comprising: placing in the annulus a column of cement slurry containing a stable volume of at least 0.1 SCF of gas per cubic foot of cement slurry at a time prior to the initial set of the slurry, wherein the gas is formed in situ by dispersing in the slurry prior to placement an effective amount of a metal selected from the group consisting of Al, Ca, Zn, Mg and mixtures thereof; and maintaining sufficient gas in the slurry to prevent substantial reduction in the pressure in the slurry column during transition of the slurry to a solid state.
Claim 18
Independent Claim
135 words
The method of preventing gas leakage into the annulus between the casing and bore hole of an oil well from an adjacent gas-bearing formation comprising: placing a cement slurry in the annulus across the face of the gas-bearing formation; and generating a gas in the slurry in an amount and at a rate, by incorporating in the slurry with mixing about 0.02-5.0 weight percent of particulate aluminum based on the weight of dry cement, such that prior to the time the slurry sets to a hardened state, the decrease in the downhole pore pressure of the cement slurry is less than the difference between the initial hydrostatic pressure and the reservoir pressure of said gas-bearing formation at a point adjacent to said gas-bearing formation prior to the time the slurry sets to a hardened state.
Claim 19
Independent Claim
135 words
The method of preventing gas leakage into the annulus between the casing and bore hole of an oil well from an adjacent gas-bearing formation comprising: placing a cement slurry in the annulus across the face of the gas-bearing formation; and generating a gas in the slurry in an amount and at a rate, by incorporating in the slurry with mixing about 0.02-5.0 weight percent of particulate aluminum based on the weight of dry cement, such that prior to the time the slurry sets to a hardened state, the decrease in the downhole pore pressure of the cement slurry is less than the difference between the initial hydrostatic pressure and the reservoir pressure of said gas-bearing formation at a point adjacent to said gas-bearing formation prior to the time the slurry sets to a hardened state.
Claim 20
Dependent Claim
107 words
In a process for placing hydraulic cement slurry in a subterranean zone and allowing the cement slurry to set, wherein a portion of the zone is exposed to gas pressure in the earth adjacent the zone, the process characterized by incorporating in said cement slurry a means for pressurizing said slurry by adding a means for generating gas including a gas generating agent which reacts in the cement slurry to produce gas to maintain sufficient gas in the slurry to prevent substantial reduction in pressure in the slurry and to offset the gas pressure adjacent said zone during the transition of the slurry to a solid state.
Claim 21
Dependent Claim
107 words
In a process for placing hydraulic cement slurry in a subterranean zone and allowing the cement slurry to set, wherein a portion of the zone is exposed to gas pressure in the earth adjacent the zone, the process characterized by incorporating in said cement slurry a means for pressurizing said slurry by adding a means for generating gas including a gas generating agent which reacts in the cement slurry to produce gas to maintain sufficient gas in the slurry to prevent substantial reduction in pressure in the slurry and to offset the gas pressure adjacent said zone during the transition of the slurry to a solid state.
Claim 22
Dependent Claim
32 words
A process of claim 15 wherein the gas generating agent comprises a metal selected from the group consisting of Al, Na, Li, Mg, Ca, Zn and mixtures of two or more thereof.
Claim 23
Dependent Claim
27 words
A process of claim 16 wherein the means for generating gas includes a material selected from the group consisting of reaction delaying means and reaction accelerating means.
Claim 24
Dependent Claim
28 words
A process of claim 17 wherein said gas generating agent is selected so that most of the gas is produced after the slurry is being pumped into place.
References Cited (Backward Citations)
CA640145A
Cited
US2236987A
Cited
US2288557A
Cited
US2930771A
Cited
US3098754A
Cited
US3148996A
Cited
US3483007A
Cited
US3465825A
Cited
US3979217A
Cited
US3944425A
Cited
US4011909A
Cited
US4120360A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1984-12-07 | 1985-06-08 | 1985-12-08 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1988-12-07 | 1989-06-08 | 1989-12-08 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1992-12-07 | 1993-06-08 | 1993-12-08 | $7700.00 | Window Closed / Lapsed |