US4206509A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method of enhancing seismic reflection signals for nonsurface-consistent static time shifts
Assignee: Mobil Oil AS
•
Filing: 1978-03-03
•
Granted: 1980-06-03
•
Expires: 1998-03-03
Abstract
Abstract In common depth point (CDP) seismic exploration, a pilot trace is produced from the stacked trace for each CDP set of traces. The pilot trace is crosscorrelated with each trace of the CDP set during selected time windows. The crosscorrelation time shifts are applied to each trace of the CDP set. The time shifted traces of each CDP set are stacked to form a static corrected seismic record section.
Inventors
- 👤 William H. Ruehle
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-30 08:00
CPC Classifications
G; G01; G01V; G01V1/00; G01V1/28; G01V1/36; G01V1/362; G01V2210/00; G01V2210/50; G01V2210/53
Claims Analysis
Total Claims: 11
Claim 1
Independent Claim
204 words
A method of enhancing primary seismic reflection signals recorded in the form of common depth point seismic traces by the removal of nonsurface-consistent static time shifts, comprising the steps of: (a) stacking the seismic traces in each of a multiplicity common depth point sets of seismic traces to produce a seismic record section, (b) generating from the stacked traces of said record section in the direction of a formation dip at least one pilot trace, said pilot trace being identified with at least one of those sets of common depth point seismic traces, (c) selecting time windows for at least two reflection signals on each pilot trace, which time windows bracket their respective reflection signals, (d) crosscorrelating that portion of each pilot trace within the selected time windows with those portions of the common depth point seismic traces identified with each pilot trace and falling within the same time windows to determine separately static time shifts for each of said reflection signals in said common depth point seismic traces, (e) applying said static time shifts to said common depth point seismic traces, and (f) stacking the time shifted seismic traces in each common depth point set to produce a static corrected seismic record section.
Claim 2
Independent Claim
204 words
A method of enhancing primary seismic reflection signals recorded in the form of common depth point seismic traces by the removal of nonsurface-consistent static time shifts, comprising the steps of: (a) stacking the seismic traces in each of a multiplicity common depth point sets of seismic traces to produce a seismic record section, (b) generating from the stacked traces of said record section in the direction of a formation dip at least one pilot trace, said pilot trace being identified with at least one of those sets of common depth point seismic traces, (c) selecting time windows for at least two reflection signals on each pilot trace, which time windows bracket their respective reflection signals, (d) crosscorrelating that portion of each pilot trace within the selected time windows with those portions of the common depth point seismic traces identified with each pilot trace and falling within the same time windows to determine separately static time shifts for each of said reflection signals in said common depth point seismic traces, (e) applying said static time shifts to said common depth point seismic traces, and (f) stacking the time shifted seismic traces in each common depth point set to produce a static corrected seismic record section.
Claim 3
Dependent Claim
41 words
The method of claim 1 wherein the step of generating said pilot trace includes selecting one of said stacked traces and averaging with adjacent stacked traces of said record section in the direction of formation dip to produce said pilot trace.
Claim 4
Dependent Claim
60 words
The method of claim 1 wherein the step of selectively averaging the stacked traces of said record section to produce said pilot section includes the averaging of the stacked traces in a plurality of t groupings in the direction of a formation dip to produce a multitrace pilot section of n pilot traces corresponding to t of said stacked traces.
Claim 5
Dependent Claim
21 words
The method of claim 3 wherein t is a number equal to the number of stacked traces of said record section.
Claim 6
Dependent Claim
71 words
The method of claim 3 wherein: (a) t is a number less than the number of stacked traces of the record section, and (b) additional pilot traces corresponding to each of the stacked traces of said record section not represented by one of said t pilot traces are produced by linearly interpolating between said t pilot traces, said t pilot traces and said additional pilot traces comprising a multitrace pilot section.
Claim 7
Dependent Claim
34 words
The method of claim 1 wherein said static time shifts are applied to said common depth point seismic traces at sample data points along said traces representing the center of the selected time window.
Claim 8
Dependent Claim
35 words
The method of claim 1 wherein steps (b) through (f) are iterated until the static time shifts remaining in the static corrected seismic record section after each iteration are reduced to a predetermined minimum level.
Claim 9
Dependent Claim
132 words
The method of claim 3 further comprising the steps of: (a) selecting a plurality of time windows for bracketing a corresponding plurality of reflection signals on each pilot trace of the pilot section, (b) applying the static time shifts for each time window selected to the common depth point seismic traces at those sample points along said traces representing the centers of the corresponding time windows, (c) applying interpolated values of the time shifts between the centers of the selected time windows for each pilot trace of the pilot section to the intermediate sample points between the centers of the time windows of the corresponding common depth point seismic traces, and (d) stacking the time shifted seismic traces in each common depth point set to produce a static corrected seismic record section.
Claim 10
Dependent Claim
21 words
The method of claim 8 wherein successive ones of said plurality of selected time windows are overlapping along a pilot trace.
Claim 11
Dependent Claim
18 words
The method of claim 8 wherein said plurality of time windows are time variant along a pilot trace.
References Cited (Backward Citations)
US3550074A
Cited
US3539982A
Cited
US3638177A
Cited
US3644882A
Cited
US3714621A
Cited
US3731269A
Cited
US3794827A
Cited
US4069471A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1983-06-03 | 1983-12-03 | 1984-06-03 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1987-06-03 | 1987-12-03 | 1988-06-03 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1991-06-03 | 1991-12-03 | 1992-06-03 | $7700.00 | Window Closed / Lapsed |