Patent US4103178A successfully refreshed from Google Patents.
US4103178A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Black start system for large steam powered electric generation plants
Assignee: Westinghouse Electric Corp
•
Filing: 1977-03-11
•
Granted: 1978-07-25
•
Expires: 1997-03-11
Abstract
Abstract A black start generating system for a steam plant comprises a gas turbine-generator and a control system which operates the turbine in a modified dead load mode to accept successive load steps in accordance with a black plant startup sequence. In the dead load mode, certain limits are placed on control operations to protect the turbine while permitting load stepping during plant startup.
Inventors
- 👤 Robert A. Yannone
- 👤 John F. Reuther
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-06 12:36
CPC Classifications
F; F01; F01K; F01K13/00; F01K13/02; F01K19/00; F01K19/02; H; H02; H02H; H02H7/00; H02H7/06
Claims Analysis
Total Claims: 8
Claim 1
Independent Claim
165 words
A system for black starting a large fossil fired electric power plant having a boiler and a steam turbine-generator and large electric motors and other smallar auxiliary loads which must be energized electrically before the steam turbine-generator can become operational, said system comprising a gas turbine-generator having a fuel system with a fuel valve, means for operating said fuel valve to control the gas turbine speed during and after startup to a predetermined limit speed higher than rated and higher than the normal limit speed, means for setting said fuel valve control in a black start mode in which a load rate limit is applied to the fuel valve operation only if an actual load step exceeds a predetermined limit amount, means for applying the auxiliary plant loads to said gas turbine-generator in accordance with a predetermined sequence after the latter has been started, and means for connecting the steam and gas turbine generators to a common bus after the steam turbine-generator has been started.
Claim 2
Independent Claim
165 words
A system for black starting a large fossil fired electric power plant having a boiler and a steam turbine-generator and large electric motors and other smallar auxiliary loads which must be energized electrically before the steam turbine-generator can become operational, said system comprising a gas turbine-generator having a fuel system with a fuel valve, means for operating said fuel valve to control the gas turbine speed during and after startup to a predetermined limit speed higher than rated and higher than the normal limit speed, means for setting said fuel valve control in a black start mode in which a load rate limit is applied to the fuel valve operation only if an actual load step exceeds a predetermined limit amount, means for applying the auxiliary plant loads to said gas turbine-generator in accordance with a predetermined sequence after the latter has been started, and means for connecting the steam and gas turbine generators to a common bus after the steam turbine-generator has been started.
Claim 3
Dependent Claim
25 words
A system as set forth in claim 1 wherein the predetermined load limit ia adjustable to the allowed load pickup limits of said gas turbine.
Claim 4
Dependent Claim
30 words
A system as set forth in claim 2 wherein the predetermined load step limit differs for successive load steps in accordance with the expected size of the actual load steps.
Claim 5
Dependent Claim
44 words
A system as set forth in claim 1 wherein a temperature limit control is coupled to said throttle valve control, and said mode setting means further includes means for inhibiting temperature rate control action normally included as a part of said temperature limit control.
Claim 6
Dependent Claim
44 words
A system as set forth in claim 1 wherein a CSO limit is normally applied to said throttle valve control and the control signal output limit is raised by said mode setting means to permit step load increases to be applied to the turbine.
Claim 7
Dependent Claim
41 words
A system as set forth in claim 1 wherein the large electric motors include at least two fan motors of which at least one provides a startup load in excess of the load rate limit operative during the black plant start.
Claim 8
Dependent Claim
35 words
A system as set forth in claim 1 wherein means are provided for tracking of the load step to allow reset of the fuel limit for each step and track ahead for the subsequent step.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1981-07-24 | 1982-01-23 | 1982-07-25 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1985-07-24 | 1986-01-23 | 1986-07-25 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1989-07-24 | 1990-01-23 | 1990-07-25 | $7700.00 | Window Closed / Lapsed |