Patent US3987850A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3987850A Expired / Lapsed US ⏱️ 0.0 years remaining

Well completion method for controlling sand production

Assignee: Mobil Oil AS
•
Filing: 1975-06-13
•
Granted: 1976-10-26
•
Expires: 1995-06-13
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract This specification discloses a method of completing a well that penetrates a subterranean formation. The formation is vertically fractured and a lower portion of the fracture is propped by hydraulic fracturing techniques leaving an overlying unpropped portion of the fracture. The well is treated to block the communication of the unpropped portion of the fracture with the well.

Inventors

  • 👤 John L. Fitch

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-07 22:09
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/25; E21B43/26; E21B43/267; E21B43/02; E21B43/025; E21B43/261; E21B49/00

Claims Analysis

Total Claims: 9
Claim 1
Independent Claim 159 words
A method of completing a well that penetrates an unconsolidated hydrocarbon-bearing subterranean formation to control the production of formation particles therefrom, comprising the steps of: a. injecting a fracturing fluid down said well and into said formation to form therein a vertical fracture that communicates with said well; b. depositing propping material in said vertical fracture to form therein a propped portion of said vertical fracture and an overlying unpropped portion c. logging said well to determine the upper location of said propped portion of said vertical fracture; d. injecting a sealing material via said well into said vertical fracture above said propped portion thereof to seal said unpropped portion of said vertical fracture from communication with said well and to maintain intact said propped portion of said vertical fracture; and e. producing hydrocarbons into said well from said formation via said intact propped portion of said vertical fracture to control the production of formation particles from said formation.
Claim 2
Independent Claim 159 words
A method of completing a well that penetrates an unconsolidated hydrocarbon-bearing subterranean formation to control the production of formation particles therefrom, comprising the steps of: a. injecting a fracturing fluid down said well and into said formation to form therein a vertical fracture that communicates with said well; b. depositing propping material in said vertical fracture to form therein a propped portion of said vertical fracture and an overlying unpropped portion c. logging said well to determine the upper location of said propped portion of said vertical fracture; d. injecting a sealing material via said well into said vertical fracture above said propped portion thereof to seal said unpropped portion of said vertical fracture from communication with said well and to maintain intact said propped portion of said vertical fracture; and e. producing hydrocarbons into said well from said formation via said intact propped portion of said vertical fracture to control the production of formation particles from said formation.
Claim 3
Dependent Claim 24 words
The method of claim 1 wherein a radioactive log is run to determine said upper location of said propping material in said vertical fracture.
Claim 4
Independent Claim 157 words
A method of controlling the production of sand from an unconsolidated hydrocarbon-bearing formation that is penetrated by a well having casing therein, comprising: a. forming openings through said casing to provide fluid communication intermediate said well and said formation; b. injecting fracturing fluid and propping material via said well and said openings into said formation to form a vertical fracture therein having a propped portion and an overlying unpropped portion; c. logging said well to determine the upper location of said propped portion of said vertical fracture; d. injecting a sealing material via said well into said vertical fracture above said propped portion thereof to seal said unpropped portion of said vertical fracture from communication with said well and maintain intact said propped portion of said vertical fracture; and e. producing hydrocarbons into said well from said formation via said intact propped portion of said vertical fracture to control the production of formation particles from said formation.
Claim 5
Independent Claim 157 words
A method of controlling the production of sand from an unconsolidated hydrocarbon-bearing formation that is penetrated by a well having casing therein, comprising: a. forming openings through said casing to provide fluid communication intermediate said well and said formation; b. injecting fracturing fluid and propping material via said well and said openings into said formation to form a vertical fracture therein having a propped portion and an overlying unpropped portion; c. logging said well to determine the upper location of said propped portion of said vertical fracture; d. injecting a sealing material via said well into said vertical fracture above said propped portion thereof to seal said unpropped portion of said vertical fracture from communication with said well and maintain intact said propped portion of said vertical fracture; and e. producing hydrocarbons into said well from said formation via said intact propped portion of said vertical fracture to control the production of formation particles from said formation.
Claim 6
Dependent Claim 24 words
The method of claim 3 wherein a radioactive log is run to determine said upper location of said propped portion of said vertical fracture.
Claim 7
Dependent Claim 13 words
The method of claim 4 wherein said sealing material is a cement slurry.
Claim 8
Independent Claim 173 words
A method of controlling the production of sand from an unconsolidated hydrocarbon-bearing formation having a preferred vertical fracture orientation that is penetrated by a well having casing therein, comprising: a. selectively opening said well to said formation by forming openings in said casing essentially only along a plane aligned with said preferred vertical fracture orientation; b. injecting fracturing fluid and propping material via said well and said openings into said formation to form a vertical fracture therein having a propped portion and an overlying unpropped portion; c. logging said well to determine the upper location of said propped portion of said vertical fracture; d. injecting a sealing material via said well into said vertical fracture above said propped portion thereof to seal said unpropped portion of said vertical fracture from communication with said well and maintain intact said propped portion of said vertical fracture; and e. producing hydrocarbons into said well from said formation via said intact propped portion of said vertical fracture to control the production of formation particles from said formation.
Claim 9
Independent Claim 173 words
A method of controlling the production of sand from an unconsolidated hydrocarbon-bearing formation having a preferred vertical fracture orientation that is penetrated by a well having casing therein, comprising: a. selectively opening said well to said formation by forming openings in said casing essentially only along a plane aligned with said preferred vertical fracture orientation; b. injecting fracturing fluid and propping material via said well and said openings into said formation to form a vertical fracture therein having a propped portion and an overlying unpropped portion; c. logging said well to determine the upper location of said propped portion of said vertical fracture; d. injecting a sealing material via said well into said vertical fracture above said propped portion thereof to seal said unpropped portion of said vertical fracture from communication with said well and maintain intact said propped portion of said vertical fracture; and e. producing hydrocarbons into said well from said formation via said intact propped portion of said vertical fracture to control the production of formation particles from said formation.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1979-10-26 1980-04-26 1980-10-26 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1983-10-26 1984-04-26 1984-10-26 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1987-10-26 1988-04-26 1988-10-26 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag