Abstract

Abstract A substantially vertical fracture in a well formation is partially filled to prevent healing of the fracture, and the unfilled portion of the fracture is utilized for production flow.

Inventors

  • 👤 William T Malone

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-04 14:28
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/25; E21B43/26; E21B43/267

Claims Analysis

Total Claims: 5
Claim 1
Independent Claim 103 words
A process for producing an open channel in a first subterranean zone comprising: contacting a second subterranean zone with a fracturing fluid, said second zone being adjacent to and below said first zone, applying sufficient pressure to said fluid to initiate a fracture in said second zone, introducing a sufficient quantity of said fluid into said fracture to extend said fracture into said first zone, and, maintaining a pressure on said fluid sufficient to hold said fracture open while placing a sufficient quantity of propping agent into said fracture to substantially fill said fracture up to about the base of said first zone.
Claim 2
Dependent Claim 103 words
A process for producing an open channel in a first subterranean zone comprising: contacting a second subterranean zone with a fracturing fluid, said second zone being adjacent to and below said first zone, applying sufficient pressure to said fluid to initiate a fracture in said second zone, introducing a sufficient quantity of said fluid into said fracture to extend said fracture into said first zone, and, maintaining a pressure on said fluid sufficient to hold said fracture open while placing a sufficient quantity of propping agent into said fracture to substantially fill said fracture up to about the base of said first zone.
Claim 3
Dependent Claim 18 words
The process of claim 1, wherein said first zone and second zone are penetrated by a bore hole.
Claim 4
Dependent Claim 28 words
The process of claim 2, wherein said bore hole is fitted with suitable casing and annular sealant to isolate said first and second zones within said bore hole.
Claim 5
Dependent Claim 17 words
The process of claim 3, wherein said fluid contacts said second zone through a set of perforations.

References Cited (Backward Citations)

US3126056A Cited
US3241613A Cited
US3228470A Cited
US3224506A Cited
US3302718A Cited
US3323594A Cited
US3455388A Cited
US3428129A Cited
US3456733A Cited
US3547198A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1975-08-29 1976-02-28 1976-08-29 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1979-08-29 1980-02-28 1980-08-29 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1983-08-29 1984-02-28 1984-08-29 $7700.00 Window Closed / Lapsed