Patent US3885629A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3885629A Expired / Lapsed US ⏱️ 0.0 years remaining

Method and assembly for controlling blow-outs in oil wells

Assignee: CREPACO CORP NV 1801 S OCEAN DRIVE HALLANDALE
•
Filing: 1972-07-27
•
Granted: 1975-05-27
•
Expires: 1992-07-27
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The disclosure herein describes a new method of sealing off wells, such as those producing oil and gas in the event of a blowout; the method consists in tapping the well-head with a branch line connected to a supply of liquid carbon dioxide or nitrogen under pressure. The introduction of CO2 or nitrogen into a high-pressure oil rig-pipe has a double purpose; first, if introduced in sufficient quantity, it freezes the pipe and, secondly, in being mixed with the flammable and combustible fluid, it renders the fluid inert, i.e., non-flammable and noncombustible.

Inventors

  • 👤 Brian Richard Erb

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 01:40
CPC Classifications
E; E21; E21B; E21B33/00; E21B33/02; E21B33/03; E21B33/06; E21B35/00; E21B36/00; E21B36/001

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 100 words
A METHOD OF SEALING OFF AN EXPLOITARY WELL FOR THE PRODUCTION OF OIL AND GAS, SAID WELL HAVING A WELL-HEAD INCLUDING A CORE THROUGH WHICH EXTENDS A DRILL PIPE, COMPRISING THE STEPS OF INTRODUCING BY PUMPING DOWN THE DRILL PIPE LIQUID CARBON DIOXIDE AT A GIVEN RATE OF FLOW TO A DESIRED HEIGHT IN SAID DRILL PIPE; PUMPING IN SAID DRILL PIPE ABOVE SAID CARON DIOXIDDE AN ALCOHOL SUBSTANCE; AND PUMPING IN SAID DRILL PIPE OVER SAID ALCOHOL SUBSTANCE MUD TO THEREBY PREVENT THE EGRESS OF OIL AND GAS RESULTING FROM THE BLOWOUT AND PREVENT GROUND FRACTURING ADJACENT THE WELL.
Claim 2
Independent Claim 100 words
A METHOD OF SEALING OFF AN EXPLOITARY WELL FOR THE PRODUCTION OF OIL AND GAS, SAID WELL HAVING A WELL-HEAD INCLUDING A CORE THROUGH WHICH EXTENDS A DRILL PIPE, COMPRISING THE STEPS OF INTRODUCING BY PUMPING DOWN THE DRILL PIPE LIQUID CARBON DIOXIDE AT A GIVEN RATE OF FLOW TO A DESIRED HEIGHT IN SAID DRILL PIPE; PUMPING IN SAID DRILL PIPE ABOVE SAID CARON DIOXIDDE AN ALCOHOL SUBSTANCE; AND PUMPING IN SAID DRILL PIPE OVER SAID ALCOHOL SUBSTANCE MUD TO THEREBY PREVENT THE EGRESS OF OIL AND GAS RESULTING FROM THE BLOWOUT AND PREVENT GROUND FRACTURING ADJACENT THE WELL.

References Cited (Backward Citations)

US1567097A Cited
US2552901A Cited
US3301326A Cited
US3358763A Cited
US3357490A Cited
US3386511A Cited
US3434534A Cited
US3601318A Cited
US3559737A Cited
US3651823A Cited
US3738424A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1978-05-26 1978-11-25 1979-05-27 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1982-05-26 1982-11-25 1983-05-27 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1986-05-26 1986-11-25 1987-05-27 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag