← Back to Patent Explorer
US3738424A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for controlling offshore petroleum wells during blowout conditions

Assignee: Big Three Industries Inc
•
Filing: 1971-06-14
•
Granted: 1973-06-12
•
Expires: 1991-06-14
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Method for controlling petroleum wells, particularly those offshore, during blowout conditions, wherein special drillthrough valves are externally mounted on a well casing at longitudinally spaced locations, and wherein openings are drilled or are otherwise formed through the wall of the casing at such valves to the area around or internally of the production tubing string so that various control operations may be performed, including for example, introducing liquid nitrogen and causing it to flow inwardly through one of said valves and out of the other of said valves for freezing a section of the petroleum, water and other material internally of the production string to form a temporary frozen plug which closes off fluid flow upwardly in the production string.

Inventors

  • 👤 D Osmun
  • 👤 C Johnson
  • 👤 R Plummer

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-04 02:52
CPC Classifications
E; E21; E21B; E21B36/00; E21B36/001; E21B29/00; E21B29/08

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 96 words
A method of controlling petroleum wells during blowout conditions wherein the well has one or more well casings and a production tubing string disposed internally of the casings, comprising the steps of: mounting an upper valve and a lower valve in longitudinally spaced relationship on the external surface of the outermost well casing; making a hole for each valve through the wall of the well casing for communicating the tubing annulus around a production string with each of the valves; and thereafter manipulating said valves for controlling fluid flow between said tubing annulus and said valves.
Claim 2
Independent Claim 96 words
A method of controlling petroleum wells during blowout conditions wherein the well has one or more well casings and a production tubing string disposed internally of the casings, comprising the steps of: mounting an upper valve and a lower valve in longitudinally spaced relationship on the external surface of the outermost well casing; making a hole for each valve through the wall of the well casing for communicating the tubing annulus around a production string with each of the valves; and thereafter manipulating said valves for controlling fluid flow between said tubing annulus and said valves.
Claim 3
Dependent Claim 47 words
The method set forth in claim 1, including: circulating liquid nitrogen in said tubing annulus and through said valves for freezing the materials in a section of said production string exposed thereto to thereby form a frozen plug closing off upward fluid flow in said production string.
Claim 4
Dependent Claim 37 words
The method set forth in claim 1, including: making the hole for each valve extend through the wall of said production tubing; and thereafter introducing fluid into the production string for controlling the flow of fluid therein.
Claim 5
Dependent Claim 46 words
The method set forth in claim 1, including: making the hole for each valve extend through the wall of said production tubing; and thereafter opening at least one of said valves for discharging fluid from the production string to the area externally of the outermost casing.
Claim 6
Dependent Claim 46 words
The method set forth in claim 1, wherein: said valves are mounted on the outermost well casing below the waterline in an offshore well; and said hole for each valve is drilled through the well casing after each valve is mounted on the outermost well casing.
Claim 7
Dependent Claim 124 words
The method set forth in claim 1, wherein the well has at least one outer casing and an inner production casing with a casing annulus therebetween, including: initially making said hole for each valve through the wall of the outer casing and into communication with said casing annulus; forcing a flowable hardenable material through at least one of said valves for sealing off said casing annulus to a point above the upper valve, and allowing such material to harden; and thereafter making the holes for each valve through the hardened material and said production casing into said tubing annulus for thereby communicating said tubing annulus with each of said valves, whereby subsequent well control operations may be performed by said manipulating of said valves.
Claim 8
Dependent Claim 47 words
The method set forth in claim 6, including: circulating liquid nitrogen in said tubing annulus and through said valves for freezing the materials in a section of said production string exposed thereto to thereby form a frozen plug closing off upward fluid flow in said production string.
Claim 9
Dependent Claim 72 words
The method set forth in claim 1, including the step of: including a Tubing section in said production tubing string having a plurality of radially mounted disks thereon which are longitudinally spaced throughout the length thereof; and positioning said valves and said holes in the casing in proximity to said tubing section for facilitating the freezing of the materials within said tubing section upon the circulation of liquid nitrogen in proximity thereto.
Claim 10
Dependent Claim 55 words
The method set forth in claim 7, including the step of: circulating liquid nitrogen in said tubing annulus in the area of said disks of the tubing section and through said valves for freezing the materials in said tubing section to thereby form a frozen plug closing off upward fluid flow in said production string.
Claim 11
Independent Claim 104 words
A method of controlling petroleum wells during blowout conditions wherein the well has one or more well casings and a production tubing string disposed internally of the casings, comprising the steps of: mounting a valve on the external surface of the outermost well casing; making a hole for the valve through the wall of the well casing for communicating the tubing annulus around a production string with the valve; and thereafter introducing liquid nitrogen through the valve for freezing the materials in a section of said production string exposed thereto to form a frozen plug closing off upward fluid flow in said production string.
Claim 12
Independent Claim 104 words
A method of controlling petroleum wells during blowout conditions wherein the well has one or more well casings and a production tubing string disposed internally of the casings, comprising the steps of: mounting a valve on the external surface of the outermost well casing; making a hole for the valve through the wall of the well casing for communicating the tubing annulus around a production string with the valve; and thereafter introducing liquid nitrogen through the valve for freezing the materials in a section of said production string exposed thereto to form a frozen plug closing off upward fluid flow in said production string.

References Cited (Backward Citations)

US1851894A Cited
US1879160A Cited
US1949672A Cited
US2621022A Cited
US2552901A Cited
US2840166A Cited
US3424254A Cited
US3647000A Cited
US3631928A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1976-06-11 1976-12-11 1977-06-12 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1980-06-11 1980-12-11 1981-06-12 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1984-06-11 1984-12-11 1985-06-12 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag