Patent US2322290A successfully refreshed from Google Patents.
Patent US3236267A successfully refreshed from Google Patents.
US3236267A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method and apparatus for transferring fluid offshore
Assignee: FMC Corp
•
Filing: 1963-02-20
•
Granted: 1966-02-22
•
Expires: 1983-02-20
Abstract
No abstract record available.
Inventors
- 👤 Peter J Bily
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-25 13:10
CPC Classifications
B; B63; B63B; B63B22/00; B63B22/02; B63B22/021; B63B22/023; Y; Y10; Y10T; Y10T137/00; Y10T137/402
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
218 words
A METHOD OF ESTABLISHING A FLUID CONDUCTIVE CONNECTION BETWEEN A SHIP MOORED AT AN OFFSHORE BERTH AND A SHORE FLUID STORAGE WHILE ALLOWING FOR THE NORMAL SIDEWAYS DRIFT AND THE NORMAL UP AND DOWN MOTION OF THE SHIP AT ITS MOORINGS, SAID METHOD COMPRISING THE STEPS OF: ARRANGING A SUBMERGED, RIGID-WALL PIPELINE TO EXTEND ALONG THE SEA BED FROM THE SHORE STORAGE TO AN END OF THE BERTH; FIXING SAID PIPELINE WITH RESPECT TO THE SEA BED AT A POINT SPACED FROM THE BERTH BY A DISTANCE SUCH THAT THE PIPELINE BETWEEN SAID BERTH AND SAID POINT IS ABLE TO BEND TO PERMIT THE OFFSHORE END THEREOF TO BE RAISED TO THE SHIP''S HULL AND THEN MOVED WITH THE SHIP DURING NORMAL SIDEWAYS MOVEMENTS OF THE SHIP AT THE BERTH WITHOUT EXCEEDING THE ELASTIC LIMIT OF THE PIPELINE MATERIAL; SECURING THE OFFSHORE END OF SAID PIPELINE TO A PALLET STRUCTURE; CONNECTING THE SHIP''S TACKLE TO SAID PALLET STRUCTURE TO RAISE THE OFFSHORE PIPELINE END AND TO SECURE THE PALLET STRUCTURE FIRMLY TO THE SHIPS HULL SO THAT IT MOVES THEREWITH; ESTABLISHING A FLUID CONDUCTIVE CONNECTION BETWEEN THE SHIP AND THE OFFSHORE END OF THE PIPELINE; AND TETHERING SAID OFFSHORE END OF THE PIPELINE TO THE SEA BED TO PREVENT THE PIPELINE FROM BEING BENT BEYOND ITS ELASTIC LIMIT.
Claim 2
Independent Claim
218 words
A METHOD OF ESTABLISHING A FLUID CONDUCTIVE CONNECTION BETWEEN A SHIP MOORED AT AN OFFSHORE BERTH AND A SHORE FLUID STORAGE WHILE ALLOWING FOR THE NORMAL SIDEWAYS DRIFT AND THE NORMAL UP AND DOWN MOTION OF THE SHIP AT ITS MOORINGS, SAID METHOD COMPRISING THE STEPS OF: ARRANGING A SUBMERGED, RIGID-WALL PIPELINE TO EXTEND ALONG THE SEA BED FROM THE SHORE STORAGE TO AN END OF THE BERTH; FIXING SAID PIPELINE WITH RESPECT TO THE SEA BED AT A POINT SPACED FROM THE BERTH BY A DISTANCE SUCH THAT THE PIPELINE BETWEEN SAID BERTH AND SAID POINT IS ABLE TO BEND TO PERMIT THE OFFSHORE END THEREOF TO BE RAISED TO THE SHIP''S HULL AND THEN MOVED WITH THE SHIP DURING NORMAL SIDEWAYS MOVEMENTS OF THE SHIP AT THE BERTH WITHOUT EXCEEDING THE ELASTIC LIMIT OF THE PIPELINE MATERIAL; SECURING THE OFFSHORE END OF SAID PIPELINE TO A PALLET STRUCTURE; CONNECTING THE SHIP''S TACKLE TO SAID PALLET STRUCTURE TO RAISE THE OFFSHORE PIPELINE END AND TO SECURE THE PALLET STRUCTURE FIRMLY TO THE SHIPS HULL SO THAT IT MOVES THEREWITH; ESTABLISHING A FLUID CONDUCTIVE CONNECTION BETWEEN THE SHIP AND THE OFFSHORE END OF THE PIPELINE; AND TETHERING SAID OFFSHORE END OF THE PIPELINE TO THE SEA BED TO PREVENT THE PIPELINE FROM BEING BENT BEYOND ITS ELASTIC LIMIT.
References Cited (Backward Citations)
US1188426A
Cited
US1736293A
Cited
DE683547C
Cited
US2374249A
Cited
US2955626A
Cited
US3118155A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1969-02-21 | 1969-08-23 | 1970-02-22 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1973-02-21 | 1973-08-23 | 1974-02-22 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1977-02-21 | 1977-08-23 | 1978-02-22 | $7700.00 | Window Closed / Lapsed |