← Back to Patent Explorer
US3118155A Expired / Lapsed US ⏱️ 0.0 years remaining

Offshore tanker loading and unloading apparatus

Assignee: Individual
•
Filing: 1961-07-12
•
Granted: 1964-01-21
•
Expires: 1981-07-12
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Siegel Joseph

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 18:21
CPC Classifications
B; B63; B63B; B63B22/00; B63B22/02; B63B22/021; Y; Y10; Y10T; Y10T137/00; Y10T137/402

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 184 words
IN APPARATUS FOR TRANSFER OF FLUID BETWEEN A MARINE TANKER MOORED AT A PREDETERMINED OFFSHORE LOCATION AND A SHORE STATION HAVING SUBMARINE PIPING DIRECTED TOWARD SAID OFFSHORE LOCATION, IN COMBINATION, AN INTERMEDIATE CONNECTING STATION RETAINED OFFSHORE IN CLOSE PROXIMITY TO SAID TANKER LOCATION INCLUDING A HULL WITH A VERTICAL SIDE STRUCTURE ADAPTED TO OPERATIONALLY ABUT A SIDE OF SAID TANKER IN VERTICALLY AND HORIZONTALLY GUIDED RELATION THROUGHOUT A SUBSTANTIAL AREA OF SAID TANKER SIDE AND FURTHER INCLUDING A PIPING SYSTEM SECURED TO SAID HULL, MEANS TO RAISE AND LOWER SAID INTERMEDIATE STATION IN OPERATIVE CONCERT WITH CHANGES IN DRAFT OF SAID TANKER, MEANS TO SECURE SAID HULL TO SAID TANKER SIDE IN SAID ABUTTED GUIDED RELATION, YIELDABLE SUBMARINE TRANSFER MEANS CONNECTING SAID SUBMARINE PIPING TO SAID PIPING SYSTEM OF SAID INTERMEDIATE STATION, AND FLEXIBLE HOSE MEANS CARRIED ABOVE WATER BY SAID INTERMEDIATE STATION AND ADAPTED TO BE ATTACHED TO THE PIPING SYSTEM OF SAID TANKER FOR CONNECTING THE SAME TO SAID PIPING SYSTEM OF SAID INTERMEDIATE STATION, WHEREBY FLUID TRANSFER COMMUNICATION MAY BE COMPLETED BETWEEN SAID TANKER AND SHORE ESTABLISHMENT THROUGH SAID INTERMEDIATE STATION.
Claim 2
Dependent Claim 184 words
IN APPARATUS FOR TRANSFER OF FLUID BETWEEN A MARINE TANKER MOORED AT A PREDETERMINED OFFSHORE LOCATION AND A SHORE STATION HAVING SUBMARINE PIPING DIRECTED TOWARD SAID OFFSHORE LOCATION, IN COMBINATION, AN INTERMEDIATE CONNECTING STATION RETAINED OFFSHORE IN CLOSE PROXIMITY TO SAID TANKER LOCATION INCLUDING A HULL WITH A VERTICAL SIDE STRUCTURE ADAPTED TO OPERATIONALLY ABUT A SIDE OF SAID TANKER IN VERTICALLY AND HORIZONTALLY GUIDED RELATION THROUGHOUT A SUBSTANTIAL AREA OF SAID TANKER SIDE AND FURTHER INCLUDING A PIPING SYSTEM SECURED TO SAID HULL, MEANS TO RAISE AND LOWER SAID INTERMEDIATE STATION IN OPERATIVE CONCERT WITH CHANGES IN DRAFT OF SAID TANKER, MEANS TO SECURE SAID HULL TO SAID TANKER SIDE IN SAID ABUTTED GUIDED RELATION, YIELDABLE SUBMARINE TRANSFER MEANS CONNECTING SAID SUBMARINE PIPING TO SAID PIPING SYSTEM OF SAID INTERMEDIATE STATION, AND FLEXIBLE HOSE MEANS CARRIED ABOVE WATER BY SAID INTERMEDIATE STATION AND ADAPTED TO BE ATTACHED TO THE PIPING SYSTEM OF SAID TANKER FOR CONNECTING THE SAME TO SAID PIPING SYSTEM OF SAID INTERMEDIATE STATION, WHEREBY FLUID TRANSFER COMMUNICATION MAY BE COMPLETED BETWEEN SAID TANKER AND SHORE ESTABLISHMENT THROUGH SAID INTERMEDIATE STATION.

References Cited (Backward Citations)

US1710006A Cited
US1997586A Cited
GB504166A Cited
US2771617A Cited
US2955626A Cited
US2894268A Cited
US2965125A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1967-01-20 1967-07-22 1968-01-21 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1971-01-20 1971-07-22 1972-01-21 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1975-01-20 1975-07-22 1976-01-21 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag