Abstract A liner assembly ( 222 A) for a sand trap ( 10 ) having a perimeter ( 12 ) that defines a cavity ( 13 ) and a substrate ( 18 ) within the cavity ( 13 ) includes a first layer ( 230 A) and a second layer ( 232 A). The first layer ( 230 A) is positioned on the substrate ( 18 ) and can be formed from a substantially water-permeable material. The second layer ( 232 A) can be formed from a substantially water-impermeable material and is applied to the first layer ( 230 A). The second layer ( 232 A) can be applied to the first layer ( 230 A) as a liquid, such as a polyurea material. In one embodiment, at least one of the layers ( 230 A, 232 A) extends within the substrate ( 18 ) at least partially outside the perimeter ( 12 ) of the sand trap ( 10 ). The second layer ( 232 A) can include an aggregate material that is integrally formed as part of the second layer ( 232 A).

Inventors

  • 👤 Kevin L. Clark

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-06 11:14
CPC Classifications
A; A63; A63B; A63B57/00; A63B57/50; A63B69/00; A63B69/36; A63B69/3691; A63B63/00

Claims Analysis

Total Claims: 38
Claim 1
Independent Claim 54 words
A method for constructing a sand trap, the method comprising the step of: positioning a water-permeable first layer within a cavity of the sand trap between a substrate and a substantially water-impermeable second layer that is at least partially formed from an aggregate material, the substrate being formed from one of soil or rock.
Claim 2
Independent Claim 54 words
A method for constructing a sand trap, the method comprising the step of: positioning a water-permeable first layer within a cavity of the sand trap between a substrate and a substantially water-impermeable second layer that is at least partially formed from an aggregate material, the substrate being formed from one of soil or rock.
Claim 3
Dependent Claim 13 words
The method of claim 1 wherein the first layer includes a geotextile material.
Claim 4
Dependent Claim 16 words
The method of claim 1 where the second layer is applied directly onto the first layer.
Claim 5
Dependent Claim 20 words
The method of claim 1 wherein the second layer is applied in a liquid form directly onto the second layer.
Claim 6
Dependent Claim 27 words
The method of claim 1 wherein at least one of the layers is positioned to extend within the substrate outside of a perimeter of the sand trap.
Claim 7
Dependent Claim 21 words
The method of claim 1 wherein the step of positioning includes forming the second layer from a material that includes polyurea.
Claim 8
Dependent Claim 19 words
The method of claim 1 wherein the step of positioning includes adhering the second layer to the first layer.
Claim 9
Independent Claim 50 words
A method for constructing a sand trap, the method comprising the step of: positioning a water-permeable first layer within a cavity of the sand trap; and applying a substantially water-impermeable second layer that is partially in liquid form directly onto the first layer, the second layer including an aggregate material.
Claim 10
Independent Claim 50 words
A method for constructing a sand trap, the method comprising the step of: positioning a water-permeable first layer within a cavity of the sand trap; and applying a substantially water-impermeable second layer that is partially in liquid form directly onto the first layer, the second layer including an aggregate material.
Claim 11
Dependent Claim 24 words
The method of claim 8 wherein the step of applying including covering at least approximately 25% of the first layer with the second layer.
Claim 12
Dependent Claim 28 words
The method of claim 8 wherein the step of positioning includes positioning the first layer to extend within a substrate outside of a perimeter of the sand trap.
Claim 13
Dependent Claim 21 words
The method of claim 8 wherein the step of applying includes forming the second layer from a material that includes polyurea.
Claim 14
Dependent Claim 19 words
The method of claim 8 wherein the step of applying includes adhering the second layer to the first layer.
Claim 15
Dependent Claim 83 words
A liner assembly for a sand trap, the sand trap having a perimeter that defines a cavity and a substrate within the cavity, the liner assembly comprising: a first layer that is positioned on the substrate, the first layer being water-permeable; and a second layer that is applied to the first layer to cover a majority of the first layer, the second layer being substantially water-impermeable, the second layer including an aggregate material that is integrally formed as part of the second layer.
Claim 16
Dependent Claim 83 words
A liner assembly for a sand trap, the sand trap having a perimeter that defines a cavity and a substrate within the cavity, the liner assembly comprising: a first layer that is positioned on the substrate, the first layer being water-permeable; and a second layer that is applied to the first layer to cover a majority of the first layer, the second layer being substantially water-impermeable, the second layer including an aggregate material that is integrally formed as part of the second layer.
Claim 17
Dependent Claim 14 words
The liner assembly of claim 13 wherein the first layer includes a geotextile material.
Claim 18
Dependent Claim 19 words
The liner assembly of claim 13 wherein the second layer is applied to the first layer as a liquid.
Claim 19
Dependent Claim 14 words
The liner assembly of claim 13 wherein the second layer includes a polyurea material.
Claim 20
Dependent Claim 12 words
The liner assembly of claim 13 wherein the second layer is seamless.
Claim 21
Dependent Claim 17 words
The liner assembly of claim 13 wherein the second layer is not directly applied to the substrate.
Claim 22
Dependent Claim 14 words
The liner assembly of claim 13 wherein the substrate is formed from soil materials.
Claim 23
Dependent Claim 21 words
The liner assembly of claim 13 wherein the first layer covers at least approximately 10% of the substrate within the cavity.
Claim 24
Dependent Claim 21 words
The liner assembly of claim 13 wherein the first layer covers at least approximately 75% of the substrate within the cavity.
Claim 25
Dependent Claim 19 words
The liner assembly of claim 13 wherein the second layer covers at least approximately 75% of the first layer.
Claim 26
Dependent Claim 27 words
The liner assembly of claim 13 wherein at least one of the layers extends within the substrate at least partially outside the perimeter of the sand trap.
Claim 27
Dependent Claim 27 words
A sand trap including a drain line and the liner assembly of claim 13 that is at least partially positioned between the substrate and the drain line.
Claim 28
Dependent Claim 29 words
The sand trap of claim 24 wherein the drain line runs within approximately one foot of the perimeter over at least approximately 50% of the length of the perimeter.
Claim 29
Dependent Claim 79 words
A liner assembly for a sand trap, the sand trap having a perimeter that defines a cavity, and a substrate within the cavity of the sand trap, the liner assembly comprising: a first layer that at least partially covers the substrate; and a second layer including a liquid material that is applied to the first layer, the second layer being substantially water-impermeable, the second layer including an aggregate material that is integrally formed as part of the second layer.
Claim 30
Dependent Claim 79 words
A liner assembly for a sand trap, the sand trap having a perimeter that defines a cavity, and a substrate within the cavity of the sand trap, the liner assembly comprising: a first layer that at least partially covers the substrate; and a second layer including a liquid material that is applied to the first layer, the second layer being substantially water-impermeable, the second layer including an aggregate material that is integrally formed as part of the second layer.
Claim 31
Dependent Claim 14 words
The liner assembly of claim 26 wherein the first layer includes a geotextile material.
Claim 32
Dependent Claim 14 words
The liner assembly of claim 26 wherein the second layer includes a polyurea material.
Claim 33
Dependent Claim 17 words
The liner assembly of claim 26 wherein the second layer is not directly applied to the substrate.
Claim 34
Dependent Claim 21 words
The liner assembly of claim 26 wherein the first layer covers at least approximately 25% of the substrate within the cavity.
Claim 35
Dependent Claim 19 words
The liner assembly of claim 26 wherein the second layer covers at least approximately 25% of the first layer.
Claim 36
Dependent Claim 24 words
The liner assembly of claim 26 wherein at least one of the layers extends within the substrate outside the perimeter of the sand trap.
Claim 37
Dependent Claim 22 words
The liner assembly of claim 26 wherein each of the layers extends within the substrate outside the perimeter of the sand trap.
Claim 38
Dependent Claim 27 words
A sand trap including a drain line and the liner assembly of claim 26 that is at least partially positioned between the substrate and the drain line.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2011-07-15 2012-01-14 2012-07-15 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2015-07-15 2016-01-14 2016-07-15 $3760.00 Window Closed / Lapsed