← Back to Patent Explorer
US7309188B2 Expired / Lapsed US ⏱️ 0.0 years remaining

Drainable base course for a landfill and method of forming the same

Assignee: Advanced Geotech Systems LLC
•
Filing: 2004-09-01
•
Granted: 2007-12-18
•
Expires: 2024-09-01
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Numerous embodiments of one or more layers of void-maintaining synthetic drainable base courses (“VMSDBC's”) are provided as incorporated into landfills and other waste containment facilities.

Inventors

  • 👤 Peter J. Ianniello
  • 👤 Aigen Zhao
  • 👤 Gary L. Shaffer

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-06 19:26
CPC Classifications
E; E01; E01C; E01C3/00; E01C3/06; E01F; E01F5/00; E02; E02B; E02B11/00; E02D; E02D31/00; E02D31/02; E02D31/10; E02D31/14; E02D2300/00; E02D2300/0085; E02D2450/00; E02D2450/10; E02D2450/108

Claims Analysis

Total Claims: 78
Claim 1
Independent Claim 242 words
A synthetic drainable base course composite element suitable for providing drainage when positioned within a landfill, said base course element comprising a void-maintaining geocomposite, said geocomposite including a) a geocomposite core element having a plurality of ribs constructed and arranged to form a plurality of interconnected voids, said core element having an upper surface and a lower surface, a no-load thickness and a thickness under load, wherein said thicknesses are measured substantially perpendicular to said surfaces, and b) at least one fluid-transmissible layer attached adjacent said upper surface, wherein said layers and said core element are constructed and arranged so that, under a load of at least 1,000 lbs/foot 2 for a period of at least 100 hours, said geocomposite maintains voids of sufficient dimension that fluid from said landfill can move freely through portions of said drainage element at a transmissivity of at least 19 gallons/minute/foot at a slope gradient of 33% and at least 33 gallons/minute at a slope gradient of 10%, and wherein said geocomposite is constructed and arranged so that said transmissivity is maintained within said landfill when, fill comprising one or more layers, sections or quantities of waste or refuse materials, or waste or materials to be processed at least partially within said landfill, is disposed above said geocomposite, wherein at least a portion of said synthetic drainable base course is sloped downwardly in a gradient from a first portion to a second portion of said landfill.
Claim 2
Dependent Claim 242 words
A synthetic drainable base course composite element suitable for providing drainage when positioned within a landfill, said base course element comprising a void-maintaining geocomposite, said geocomposite including a) a geocomposite core element having a plurality of ribs constructed and arranged to form a plurality of interconnected voids, said core element having an upper surface and a lower surface, a no-load thickness and a thickness under load, wherein said thicknesses are measured substantially perpendicular to said surfaces, and b) at least one fluid-transmissible layer attached adjacent said upper surface, wherein said layers and said core element are constructed and arranged so that, under a load of at least 1,000 lbs/foot 2 for a period of at least 100 hours, said geocomposite maintains voids of sufficient dimension that fluid from said landfill can move freely through portions of said drainage element at a transmissivity of at least 19 gallons/minute/foot at a slope gradient of 33% and at least 33 gallons/minute at a slope gradient of 10%, and wherein said geocomposite is constructed and arranged so that said transmissivity is maintained within said landfill when, fill comprising one or more layers, sections or quantities of waste or refuse materials, or waste or materials to be processed at least partially within said landfill, is disposed above said geocomposite, wherein at least a portion of said synthetic drainable base course is sloped downwardly in a gradient from a first portion to a second portion of said landfill.
Claim 3
Dependent Claim 251 words
A drainable landfill comprising I. a base layer formed at least partially of one or more of native soil components and non-native soil components, II. a synthetic drainable base course element disposed above said base layer, said drainable base course element comprising A) a void-maintaining geocomposite, said geocomposite including i) a geocomposite core element having a plurality of ribs constructed and arranged to form a plurality of interconnected voids, said core element having an upper surface and a lower surface, a no-load thickness and a thickness under load, wherein said thicknesses are measured substantially perpendicular to said surfaces, and ii) at least one fluid-transmissible layer attached adjacent said upper surface, wherein said layers and said core element are constructed and arranged so that, under a load of at least 500 lbs/foot 2 for a period of at least 100 hours, said geocomposite maintains voids of sufficient dimension that fluid from said landfill can move freely through portions of said drainage element at a transmissivity of at least 19 gallons/minute/foot at a slope gradient of 33% and at least 33 gallons/minute at a slope gradient of 10%, and III. above said synthetic drainable base course, fill suitable to be drained, said fill comprising one or more layers, sections or quantities of refuse materials, or materials to be processed at least partially within said landfill, wherein at least a portion of said synthetic drainable base course is sloped downwardly in a gradient from a first portion to a second portion of said landfill.
Claim 4
Dependent Claim 251 words
A drainable landfill comprising I. a base layer formed at least partially of one or more of native soil components and non-native soil components, II. a synthetic drainable base course element disposed above said base layer, said drainable base course element comprising A) a void-maintaining geocomposite, said geocomposite including i) a geocomposite core element having a plurality of ribs constructed and arranged to form a plurality of interconnected voids, said core element having an upper surface and a lower surface, a no-load thickness and a thickness under load, wherein said thicknesses are measured substantially perpendicular to said surfaces, and ii) at least one fluid-transmissible layer attached adjacent said upper surface, wherein said layers and said core element are constructed and arranged so that, under a load of at least 500 lbs/foot 2 for a period of at least 100 hours, said geocomposite maintains voids of sufficient dimension that fluid from said landfill can move freely through portions of said drainage element at a transmissivity of at least 19 gallons/minute/foot at a slope gradient of 33% and at least 33 gallons/minute at a slope gradient of 10%, and III. above said synthetic drainable base course, fill suitable to be drained, said fill comprising one or more layers, sections or quantities of refuse materials, or materials to be processed at least partially within said landfill, wherein at least a portion of said synthetic drainable base course is sloped downwardly in a gradient from a first portion to a second portion of said landfill.
Claim 5
Dependent Claim 83 words
The drainable landfill of claim 2 , wherein said layers and said core element are constructed and arranged so that, under a load of at least 1,000 lbs/foot 2 for a period of at least 100 hours, said geocomposite maintains voids of sufficient dimension that fluid from said landfill can move freely through portions of said drainage element at a transmissivity of at least 19 gallons/minute/foot at a slope gradient of 33% and at least 33 gallons/minute at a slope gradient of 10%.
Claim 6
Dependent Claim 72 words
The drainable landfill of claim 2 , wherein said layers and said core element are constructed and arranged so that, under a load of at least 15,000 lbs/foot 2 for a period of at least 100 hours, said geocomposite maintains voids of sufficient dimension that fluid from said landfill can move freely through portions of said drainage element at a transmissivity of at least 8.5 gallons/minute/foot at a slope gradient of 10%.
Claim 7
Dependent Claim 72 words
The drainable landfill of claim 2 , wherein said layers and said core element are constructed and arranged so that, under a load of at least 25,000 lbs/foot 2 for a period of at least 100 hours, said geocomposite maintains voids of sufficient dimension that fluid from said landfill can move freely through portions of said drainage element at a transmissivity of at least 3.5 gallons/minute/foot at a slope gradient of 10%.
Claim 8
Dependent Claim 20 words
The drainable landfill of claim 2 , wherein said core element comprises ribs constructed and arranged in a bi-planar configuration.
Claim 9
Dependent Claim 20 words
The drainable landfill of claim 2 , wherein said core element comprises ribs constructed and arranged in a tri-planar configuration.
Claim 10
Dependent Claim 20 words
The drainable landfill of claim 2 , wherein said core element comprises ribs constructed and arranged in a uniplanar configuration.
Claim 11
Dependent Claim 50 words
The drainable landfill of claim 2 , wherein said non-native soil components are one or more selected from the group consisting of refuse from highway excavations, refuse from building foundation excavations, mining refuse, manufacturing refuse, geologic refuse, gypsum refuse, quarry refuse, refuse from road-building activities, and refuse from dredging operations.
Claim 12
Dependent Claim 20 words
The drainable landfill of claim 2 , wherein said base layer of said drainable structure comprises at least one slope.
Claim 13
Dependent Claim 21 words
The drainable landfill of claim 2 , wherein said base layer of said drainable landfill comprises a plurality of sloping surfaces.
Claim 14
Dependent Claim 17 words
The drainable landfill of claim 2 , wherein said plurality of surfaces form at least one container.
Claim 15
Dependent Claim 15 words
The drainable landfill of claim 2 , wherein said landfill comprises a plurality of containers.
Claim 16
Dependent Claim 41 words
The drainable landfill of claim 13 , wherein said plurality of containers are constructed and arranged such that at least portions of one container can drain via gravitational means into one or more of other containers of said plurality of containers.
Claim 17
Dependent Claim 27 words
The drainable landfill of claim 2 , wherein said drainage element further comprises iii) at least one frictional layer attached adjacent said lower surface of said geocomposite.
Claim 18
Dependent Claim 26 words
The drainable landfill of claim 2 , wherein said drainage element further comprises iii) at least one cushion layer adjacent said lower surface of said geocomposite.
Claim 19
Dependent Claim 12 words
The drainable landfill of claim 2 , wherein said landfill is layered.
Claim 20
Dependent Claim 80 words
The synthetic drainable base course (SDBC) of claim 2 , wherein said ribs of said core are provided in a first set and a second set, and a) said ribs of said first set are disposed substantially parallel to one another and substantially in a first plane, and b) said ribs of said second set being disposed substantially parallel to one another and substantially in a second plane, and wherein said first and second planes are disposed adjacent one another.
Claim 21
Dependent Claim 58 words
The synthetic drainable base course of claim 18 , wherein further ribs are provided in at least a third set wherein said ribs of said third set are disposed substantially parallel to one another and said third set of ribs is disposed in a third plane adjacent and non-parallel to the ribs of said first or second sets.
Claim 22
Dependent Claim 42 words
The synthetic drainable base course of claim 18 , wherein the cross-section of any one of said ribs approximates one or more shapes from the group consisting of a square, a rectangle, an oval, a star shape, a crenulation, and a trapezoid.
Claim 23
Dependent Claim 51 words
The synthetic drainable base course of claim 20 , wherein at least one of said ribs has the cross-section of a square and said square has a width and a height approximately equal to one another, and said width and said height have dimensions of from 1.0 mm to 10.0 mm.
Claim 24
Dependent Claim 55 words
The synthetic drainable base course of claim 20 , wherein at least one of said ribs has the cross-section of a rectangle and said rectangle has a width and a height, and said width has dimensions of from 2.0 mm to 15.0 mm and said height has dimensions of from 1.0 mm to 10.0 mm.
Claim 25
Dependent Claim 72 words
The synthetic drainable base course of claim 20 , wherein at least one of said ribs has the cross-section of a trapezoid and said trapezoid has a major width, a minor width and a height, and said major width has dimensions of from 2.0 mm to 15.0 mm, said minor width has dimensions of from 1.0 mm to 10.0 mm and said height has dimensions of from 1.0 mm to 10.0 mm.
Claim 26
Dependent Claim 30 words
The synthetic drainable base course of claim 2 , wherein at least some of said ribs comprise crenulations and said crenulations are disposed longitudinally along the surfaces of said ribs.
Claim 27
Dependent Claim 28 words
The synthetic drainable base course of claim 2 , wherein all of said ribs are crenulated and said crenulations are disposed longitudinally along the surfaces of said ribs.
Claim 28
Dependent Claim 38 words
The synthetic drainable base course of claim 2 , wherein under a normal load of 1,200 kPa for at least 10,000 hours at 20 degrees Celsius, said thickness under load is at least 65% of said no-load thickness.
Claim 29
Dependent Claim 38 words
The synthetic drainable base course of claim 2 , wherein under a normal load of 720 kPa for at least 5,000 hours at 40 degrees Celsius, said thickness under load is at least 65% of said no-load thickness.
Claim 30
Dependent Claim 38 words
The synthetic drainable base course of claim 2 , wherein under a normal load of 1,200 kPa for at least 10,000 hours at 20 degrees Celsius, said thickness under load is at least 60% of said no-load thickness.
Claim 31
Dependent Claim 38 words
The synthetic drainable base course of claim 2 , wherein under a normal load of 720 kPa for at least 5,000 hours at 40 degrees Celsius, said thickness under load is at least 60% of said no-load thickness.
Claim 32
Dependent Claim 38 words
The synthetic drainable base course of claim 2 , wherein under a normal load of 1,200 kPa for at least 10,000 hours at 20 degrees Celsius, said thickness under load is at least 50% of said no-load thickness.
Claim 33
Dependent Claim 38 words
The synthetic drainable base course of claim 2 , wherein under a normal load of 720 kPa for at least 5,000 hours at 40 degrees Celsius, said thickness under load is at least 50% of said no-load thickness.
Claim 34
Dependent Claim 45 words
The synthetic drainable base course of claim 2 , wherein under a normal load of 720 kPa and a shear load of 240 kPa for at least 5,000 hours at 40 degrees Celsius, said thickness under load is at least 50% of said no-load thickness.
Claim 35
Dependent Claim 45 words
The synthetic drainable base course of claim 2 , wherein under a normal load of 720 kPa and a shear load of 240 kPa for at least 5,000 hours at 40 degrees Celsius, said thickness under load is at least 45% of said no-load thickness.
Claim 36
Dependent Claim 45 words
The synthetic drainable base course of claim 2 , wherein under a normal load of 720 kPa and a shear load of 240 kPa for at least 5,000 hours at 40 degrees Celsius, said thickness under load is at least 40% of said no-load thickness.
Claim 37
Dependent Claim 24 words
The synthetic drainable base course of claim 2 , wherein said no-load thickness is in the range of from 0.20 inches to 1.00 inches.
Claim 38
Dependent Claim 24 words
The synthetic drainable base course of claim 2 , wherein said no-load thickness is in the range of from 0.20 inches to 0.75 inches.
Claim 39
Dependent Claim 24 words
The synthetic drainable base course of claim 2 , wherein said no-load thickness is in the range of from 0.25 inches to 0.35 inches.
Claim 40
Dependent Claim 38 words
The synthetic drainable base course of claim 2 , wherein said core element is a machine manufactured network of fibers or filaments and has a tensile strength of at least 400 lbs per foot in the machine direction.
Claim 41
Dependent Claim 38 words
The synthetic drainable base course of claim 2 , wherein said core element is a machine manufactured network of fibers or filaments and has a tensile strength of at least 500 lbs per foot in the machine direction.
Claim 42
Dependent Claim 26 words
The synthetic drainable base course of claim 2 , wherein said gradient is at least 1% in a direction away from said portion of said landfill.
Claim 43
Dependent Claim 18 words
The synthetic drainable base course of claim 2 , wherein said portion of said landfill is the centerline.
Claim 44
Dependent Claim 41 words
The synthetic drainable base course of claim 2 , wherein under a load of 720 kPa for at least 100 hours, said voids maintain an average width of at least 2.0 mm and an average height of at least 10.0 mm.
Claim 45
Dependent Claim 34 words
The synthetic drainable base course of claim 2 , wherein under a load of 720 kPa for at least 100 hours, said voids maintain an average width of from 2.0 mm to 10.0 mm.
Claim 46
Dependent Claim 34 words
The synthetic drainable base course of claim 2 , wherein under a load of 720 kPa for at least 100 hours, said voids maintain an average width of from 3.0 mm to 8.0 mm.
Claim 47
Dependent Claim 34 words
The synthetic drainable base course of claim 2 , wherein under a load of 1,200 kPa for at least 100 hours, said voids maintain an average width of from 2.0 mm to 10.0 mm.
Claim 48
Dependent Claim 34 words
The synthetic drainable base course of claim 2 , wherein under a load of 1,200 kPa for at least 100 hours, said voids maintain an average width of from 3.0 mm to 8.0 mm.
Claim 49
Dependent Claim 34 words
The synthetic drainable base course of claim 2 , wherein under a load of 1,200 kPa for at least 100 hours, said voids maintain an average height of from 2.0 mm to 10.0 mm.
Claim 50
Dependent Claim 34 words
The synthetic drainable base course of claim 2 , wherein under a load of 1,200 kPa for at least 100 hours, said voids maintain an average height of from 3.0 mm to 8.0 mm.
Claim 51
Dependent Claim 41 words
The synthetic drainable base course of claim 2 , wherein under a load of 720 kPa for at least 100 hours, said voids maintain an average width of at least 3.0 mm and an average height of at least 10.0 mm.
Claim 52
Dependent Claim 41 words
The synthetic drainable base course of claim 2 , wherein under a load of 1,200 kPa for at least 100 hours, said voids maintain an average width of at least 2.0 mm and an average height of at least 8.0 mm.
Claim 53
Dependent Claim 41 words
The synthetic drainable base course of claim 2 , wherein under a load of 720 kPa for at least 100 hours, said voids maintain an average width of at least 6.0 mm and an average height of at least 8.0 mm.
Claim 54
Dependent Claim 41 words
The synthetic drainable base course of claim 2 , wherein under a load of 1,200 kPa for at least 1,000 hours, said voids maintain an average width of at least 2.0 mm and an average height of at least 8.0 mm.
Claim 55
Dependent Claim 41 words
The synthetic drainable base course of claim 2 , wherein under a load of 720 kPa for at least 1,000 hours, said voids maintain an average width of at least 6.0 mm and an average height of at least 8.0 mm.
Claim 56
Dependent Claim 32 words
The synthetic drainable base course of claim 2 , wherein said ribs are constructed and arranged to form preferential flow paths and non-preferential flow paths in a sloped portion of said landfill.
Claim 57
Dependent Claim 31 words
The synthetic drainable base course of claim 54 , wherein said preferential flow paths and said non-preferential flow paths are not parallel to one another and are formed by said ribs.
Claim 58
Dependent Claim 28 words
The synthetic drainable base course of claim 54 , disposed in a landfill such that said preferential flow paths are substantially perpendicular to said portion of said landfill.
Claim 59
Dependent Claim 28 words
The synthetic drainable base course of claim 54 , disposed in a landfill such that said preferential flow paths are substantially parallel to said portion of said landfill.
Claim 60
Dependent Claim 31 words
The synthetic drainable base course of claim 54 , wherein at least 35% of the volume of fluid moving through said SDBC does so by way of said preferential flow paths.
Claim 61
Dependent Claim 31 words
The synthetic drainable base course of claim 54 , wherein at least 50% of the volume of fluid moving through said SDBC does so by way of said preferential flow paths.
Claim 62
Dependent Claim 31 words
The synthetic drainable base course of claim 54 , wherein at least 65% of the volume of fluid moving through said SDBC does so by way of said preferential flow paths.
Claim 63
Dependent Claim 33 words
The synthetic drainable base course of claim 54 , wherein said portion of said landfill is the centerline or axis of at least one of said first and second portions of said landfill.
Claim 64
Dependent Claim 32 words
The synthetic drainable base course of claim 1 , wherein said geocomposite core comprises at least one margin constructed and arranged to transmit fluids from said base course away from said landfill.
Claim 65
Dependent Claim 51 words
The synthetic drainable base course of claim 62 , wherein said at least one margin is constructed and arranged to connect with one or more selected from the group consisting of perforated pipes, non-perforated pipes, drainage ditches, sumps, canals, re-circulating manifolds, drainage manifolds and facilities for further processing of said fluid.
Claim 66
Independent Claim 258 words
A method of forming drainable landfill, comprising the steps of I. providing a base layer formed at least partially of one or more of native soil components and non-native soil components, II. providing a synthetic drainable base course element disposed above said base layer, said drainage element comprising A) a void-maintaining geocomposite, said geocomposite including i) a geocomposite core element having a plurality of ribs constructed and arranged to form a plurality of interconnected voids, said core element having an upper surface and a lower surface, a no-load thickness and a thickness under load, wherein said thicknesses are measured substantially perpendicular to said surfaces, and ii) at least one fluid-transmissible layer attached adjacent said upper surface, wherein said layers and said core element are constructed and arranged so that, under a load of at least 500 lbs/foot 2 for a period of at least 100 hours, said geocomposite maintains voids of sufficient dimension that fluid from said landfill can move freely through portions of said drainage element at a transmissivity of at least 19 gallons/minute/foot at a slope gradient of 33% and at least 33 gallons/minute at a slope gradient of 10%, and III. providing above said synthetic drainable base course, fill suitable to be drained, said fill comprising one or more layers, sections or quantities of refuse materials, or materials to be processed at least partially within said landfill, wherein at least a portion of said synthetic drainable base course is sloped downwardly in a gradient from a first portion to a second portion of said landfill.
Claim 67
Independent Claim 258 words
A method of forming drainable landfill, comprising the steps of I. providing a base layer formed at least partially of one or more of native soil components and non-native soil components, II. providing a synthetic drainable base course element disposed above said base layer, said drainage element comprising A) a void-maintaining geocomposite, said geocomposite including i) a geocomposite core element having a plurality of ribs constructed and arranged to form a plurality of interconnected voids, said core element having an upper surface and a lower surface, a no-load thickness and a thickness under load, wherein said thicknesses are measured substantially perpendicular to said surfaces, and ii) at least one fluid-transmissible layer attached adjacent said upper surface, wherein said layers and said core element are constructed and arranged so that, under a load of at least 500 lbs/foot 2 for a period of at least 100 hours, said geocomposite maintains voids of sufficient dimension that fluid from said landfill can move freely through portions of said drainage element at a transmissivity of at least 19 gallons/minute/foot at a slope gradient of 33% and at least 33 gallons/minute at a slope gradient of 10%, and III. providing above said synthetic drainable base course, fill suitable to be drained, said fill comprising one or more layers, sections or quantities of refuse materials, or materials to be processed at least partially within said landfill, wherein at least a portion of said synthetic drainable base course is sloped downwardly in a gradient from a first portion to a second portion of said landfill.
Claim 68
Dependent Claim 49 words
The method of claim 64 , wherein said non-native soil components are one or more selected from the group consisting of refuse from highway excavations, refuse from building foundation excavations, mining refuse, manufacturing refuse, geologic refuse, gypsum refuse, quarry refuse, refuse from road-building activities, and refuse from dredging operations.
Claim 69
Dependent Claim 19 words
The method of claim 64 , wherein said base layer of said drainable structure comprises at least one slope.
Claim 70
Dependent Claim 30 words
The method of claim 64 , wherein said drainage element of said drainable landfill further comprises iii) at least one frictional layer attached adjacent said lower surface of said geocomposite.
Claim 71
Dependent Claim 29 words
The method of claim 64 , wherein said drainage element of said drainable landfill further comprises iii) at least one cushion layer adjacent said lower surface of said geocomposite.
Claim 72
Dependent Claim 11 words
The method of claim 64 , wherein said landfill is layered.
Claim 73
Dependent Claim 76 words
The method of claim 64 , wherein said ribs of said core are provided in a first set and a second set, and a) said ribs of said first set are disposed substantially parallel to one another and substantially in a first plane, and b) said ribs of said second set being disposed substantially parallel to one another and substantially in a second plane, and wherein said first and second planes are disposed adjacent one another.
Claim 74
Dependent Claim 55 words
The method of claim 64 , wherein further ribs are provided in at least a third set wherein said ribs of said third set are disposed substantially parallel to one another and said third set of ribs is disposed in a third plane adjacent and non-parallel to the ribs of said first or second sets.
Claim 75
Dependent Claim 33 words
The method of claim 64 , wherein the cross-section of any one of said ribs approximates one or more shapes from the group consisting of squares, rectangles, ovals, star shapes, crenulations, and trapezoids.
Claim 76
Dependent Claim 82 words
The method of claim 64 , wherein said layers and said core element are constructed and arranged so that, under a load of at least 1,000 lbs/foot 2 for a period of at least 100 hours, said geocomposite maintains voids of sufficient dimension that fluid from said landfill can move freely through portions of said drainage element at a transmissivity of at least 19 gallons/minute/foot at a slope gradient of 33% and at least 33 gallons/minute at a slope gradient of 10%.
Claim 77
Dependent Claim 71 words
The method of claim 64 , wherein said layers and said core element are constructed and arranged so that, under a load of at least 15,000 lbs/foot 2 for a period of at least 100 hours, said geocomposite maintains voids of sufficient dimension that fluid from said landfill can move freely through portions of said drainage element at a transmissivity of at least 8.5 gallons/minute/foot at a slope gradient of 10%.
Claim 78
Dependent Claim 71 words
The method of claim 64 , wherein said layers and said core element are constructed and arranged so that, under a load of at least 25,000 lbs/foot 2 for a period of at least 100 hours, said geocomposite maintains voids of sufficient dimension that fluid from said landfill can move freely through portions of said drainage element at a transmissivity of at least 3.5 gallons/minute/foot at a slope gradient of 10%.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2010-12-17 2011-06-18 2011-12-18 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2014-12-17 2015-06-18 2015-12-18 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2018-12-17 2019-06-18 2019-12-18 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag