Abstract

Abstract A landfill cell for the containment of MSW ash is defined in part by a depression in the ground bounded by a leachate impervious liner which forms the bottom and side walls of the cell, for continuous long-term protection of underyling and contiguous aquifers from contamination by heavy metals. The cell has a base layer of a natural cationic material in the form of amended and compacted lignite, which may be enhanced by the addition of about 6 to 12% lime by weight, extending in overlying relation to the liner along the bottom and along the side walls. An overburden of the waste ash material rests on the base layer, and at least one additional layer of amended lignite is positioned immediately above the first overburden, and at least one additional layer of the waste material overburden rests on the additional layer of cationic material. The lignite is ground to a small particle size of about 0.1 mm to 2.0 mm in size and has a CEC value of about 120 meq/100 g when enhanced by the addition of lime. A method of long term storage of MSW ash in a landfill cell includes the steps of forming a layer of such amended lignite in the landfill and applying an overburden of ash immediately above that layer, in which the cationic capacity of the layer is sufficient to immobilize at least 100% of the heavy metal ions capable of being leached from the overburden, adding a second such layer of material immediately above the overburden and then adding another layer of overburden of waste material over the second layer, and so on until the cell is filled and covered.

Inventors

  • 👤 Hugh P. Shannonhouse
  • 👤 Robert W. Styron

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 17:59
CPC Classifications
E; E02; E02D; E02D31/00; E02D31/002; E02D31/004; B; B09; B09B; B09B1/00

Claims Analysis

Total Claims: 20
Claim 1
Independent Claim 189 words
In a landfill cell for the containment of waste material defined at least in part by a depression in the ground, which depression is bounded by a leachate impervious means defining the bottom and the side walls of the cell, the improvement in the immobilization of heavy metals present in leachate from such waste material for the continuous long-term protection of underlying and contiguous ground aquifers, comprising: a first leachate permeable layer of a natural cationic active material have a CEC value of at least 50 meq/100 g, said material extending in overlying relation to said liner means over said bottom and to said side walls and forming a base layer, a first overburden of such waste material positioned immediately above said base layer, the thickness of said base layer being sufficient to absorb and immobilize a major portion of the lead, cadmium, and mercury metal ion leachates from said overburden, at least one additional said leachate permeable layer of said cationic active material positioned immediately above said first overburden, and at least one additional said waste material overburden material positioned above said additional layer of cationic active material.
Claim 2
Dependent Claim 189 words
In a landfill cell for the containment of waste material defined at least in part by a depression in the ground, which depression is bounded by a leachate impervious means defining the bottom and the side walls of the cell, the improvement in the immobilization of heavy metals present in leachate from such waste material for the continuous long-term protection of underlying and contiguous ground aquifers, comprising: a first leachate permeable layer of a natural cationic active material have a CEC value of at least 50 meq/100 g, said material extending in overlying relation to said liner means over said bottom and to said side walls and forming a base layer, a first overburden of such waste material positioned immediately above said base layer, the thickness of said base layer being sufficient to absorb and immobilize a major portion of the lead, cadmium, and mercury metal ion leachates from said overburden, at least one additional said leachate permeable layer of said cationic active material positioned immediately above said first overburden, and at least one additional said waste material overburden material positioned above said additional layer of cationic active material.
Claim 3
Dependent Claim 26 words
The landfill cell of claim 1 in which said cationic active material is selected from a group consisting of lignite, brown coal, peat, and sub-bituminous coal.
Claim 4
Dependent Claim 48 words
The landfill cell of claim 1 in which said cationic active material comprises crushed lignite to a size in which the largest particles do not exceed one inch in diameter and with a major portion of the particles are of approximately 0.1 mm to 2.0 mm in diameter.
Claim 5
Dependent Claim 39 words
The cell of claim 3 in which said cell is a monofil, said waste material is MSW ash, in which said first layer is about 1 foot thick, and in which said first overburden is about 25 feet thick.
Claim 6
Dependent Claim 19 words
The cell of claim 3 in which said cationic active material includes about 6 to 12% lime by weight.
Claim 7
Dependent Claim 110 words
In a landfill cell for the containment of waste material containing heavy metals which are subject to leaching from such waste material, the improvement comprising: at least one layer of crushed compacted lignite having an average particle size of about 2 mm and less, said layer being positioned in immediate underlying relation to said waste material, such that leachate from said waste material will pass through said one layer, said one layer having a CEC value of at least 50 meq/100 g and having a cationic capacity sufficient to immobilize at least 100% of the available heavy metal ions which can be released by said waste material in a leachate.
Claim 8
Dependent Claim 110 words
In a landfill cell for the containment of waste material containing heavy metals which are subject to leaching from such waste material, the improvement comprising: at least one layer of crushed compacted lignite having an average particle size of about 2 mm and less, said layer being positioned in immediate underlying relation to said waste material, such that leachate from said waste material will pass through said one layer, said one layer having a CEC value of at least 50 meq/100 g and having a cationic capacity sufficient to immobilize at least 100% of the available heavy metal ions which can be released by said waste material in a leachate.
Claim 9
Dependent Claim 19 words
The landfill cell of claim 6 in which said one layer includes about 6 to 12% lime by weight.
Claim 10
Independent Claim 111 words
The method of storing waste material in a landfill in which said material forms a leachate containing heavy metals, comprising the steps of: forming a layer of leachate pervious natural cationic active material in said landfill having a CEC value of at least 50 meq/100 g, applying an overburden of said waste material immediately above said layer, the cationic capacity of said layer being sufficient to immobilize at least 100% of heavy metal ions capable of being leached from said overburden; and adding a second layer of said cationic active material immediately above said overburden of waste material, and adding a second said overburden of waste material over said second layer.
Claim 11
Independent Claim 111 words
The method of storing waste material in a landfill in which said material forms a leachate containing heavy metals, comprising the steps of: forming a layer of leachate pervious natural cationic active material in said landfill having a CEC value of at least 50 meq/100 g, applying an overburden of said waste material immediately above said layer, the cationic capacity of said layer being sufficient to immobilize at least 100% of heavy metal ions capable of being leached from said overburden; and adding a second layer of said cationic active material immediately above said overburden of waste material, and adding a second said overburden of waste material over said second layer.
Claim 12
Dependent Claim 15 words
The method of claim 8 in which said waste material is municipal solid waste ash.
Claim 13
Dependent Claim 25 words
The method of claim 8 in which said cationic active material is selected from a group consisting of lignite, brown coal, peat, and sub-bituminous coal.
Claim 14
Dependent Claim 23 words
The method of claim 8 in which said cationic active material is crushed lignite blended with about 6 to 12% lime by weight.
Claim 15
Dependent Claim 22 words
The method of claim 11 in which said lignite is crushed to a size of from about 0.1 mm to 2 mm.
Claim 16
Dependent Claim 17 words
The method of claim 8 including the further step of applying a water-impervious cover to said landfill.
Claim 17
Independent Claim 105 words
The method of long term storing of ash from the incineration of municipal solid waste in a landfill cell, comprising the steps of forming a water impervious liner at a bottom of such cell, covering said liner with a layer of cationic active material in the form of crushed lignite and applying to such material an overburden of said ash in a quantity which is related to the quantity of lignite such that the total cationic capacity of said lignite layer is sufficient to immobilize at least 100% of the heavy metal ions which are capable of being leached in said cell from said overburden.
Claim 18
Independent Claim 105 words
The method of long term storing of ash from the incineration of municipal solid waste in a landfill cell, comprising the steps of forming a water impervious liner at a bottom of such cell, covering said liner with a layer of cationic active material in the form of crushed lignite and applying to such material an overburden of said ash in a quantity which is related to the quantity of lignite such that the total cationic capacity of said lignite layer is sufficient to immobilize at least 100% of the heavy metal ions which are capable of being leached in said cell from said overburden.
Claim 19
Dependent Claim 85 words
The method of claim 14 comprising the further steps of adding a second said layer of crushed lignite immediately above said overburden layer of ash, and adding a second overburden layer of ash immediately on top of said second lignite layer, said quantity of said overburden being related to the cationic capacity of said second layer such that the cationic capacity of said second layer is sufficient to immobilize at least 100% of the heavy metal ions capable of being leached from said second overburden.
Claim 20
Dependent Claim 31 words
The method of claim 14 including the step of blending lime with said lignite in a ratio of about 6-12% lime by weight of said lignite prior to said covering step.

References Cited (Backward Citations)

CA1053918A Cited
DE3041706A1 Cited
US4624604A Cited
US4701219A Cited
DD230439A3 Cited
EP0292941A2 Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1996-03-01 1996-08-31 1997-03-02 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2000-03-01 2000-08-31 2001-03-02 $3760.00 Window Closed / Lapsed