US7274975B2
Expired / Lapsed
US
⏱️ 0.0 years remaining
Optimized energy management system
Assignee: Gridpoint Inc
•
Filing: 2005-06-06
•
Granted: 2007-09-25
•
Expires: 2025-06-06
Abstract
Abstract Methods and systems are provided for optimizing the control of energy supply and demand. An energy control unit includes one or more algorithms for scheduling the control of energy consumption devices on the basis of variables relating to forecast energy supply and demand. Devices for which energy consumption can be scheduled or deferred are activated during periods of cheapest energy usage. Battery storage and alternative energy sources (e.g., photovoltaic cells) are activated to sell energy to the power grid during periods that are determined to correspond to favorable cost conditions.
Inventors
- 👤 Craig Howard Miller
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-27 06:56
CPC Classifications
G; G06; G06Q; G06Q50/00; G06Q50/06; G05; G05B; G05B15/00; G05B15/02; H; H02; H02J; H02J3/00; H02J3/008; H02J3/12; H02J3/14; H02J3/28; H02J3/32; H02J7/00; H02J7/34; H02J2105/00; H02J2105/50; H02J2105/54; H02J2105/55; Y; Y02; Y02B; Y02B70/00; Y02B70/30; Y02B70/3225; Y02E; Y02E10/00; Y02E10/50; Y02E10/56; Y02E70/00; Y02E70/30; Y04; Y04S; Y04S20/00; Y04S20/20; Y04S20/222; Y04S50/00; Y04S50/10
Claims Analysis
Total Claims: 42
Claim 1
Independent Claim
206 words
A method for allocating electrical energy at a location where the electrical energy is consumed, comprising the computer-implemented steps of: (1) determining a marginal cost for each of a plurality of energy sources available at the location, at least one of which is a non-grid source of electricity; (2) determining a capacity of electrical energy available from each non-grid energy source; (3) determining a demand for electrical energy at the location; (4) dynamically allocating, in order of lowest marginal cost to highest marginal cost, electrical energy capacity from each of the plurality of energy sources to meet the demand; (5) reducing demand at the location by automatically deferring electrical consumption for a device for which consumption can be deferred from a higher-cost time period to a lower-cost time period, including the computer-implemented step of issuing a command to the device to cause the deferral to occur, and further including determining projected marginal costs in each of a plurality of future time frames and deferring electrical consumption for the device to one of the plurality of future time frames while conforming to an operational constraint for the device, the operational constraint for the device comprising a maximum time duration for which the device can be swithched off.
Claim 2
Independent Claim
206 words
A method for allocating electrical energy at a location where the electrical energy is consumed, comprising the computer-implemented steps of: (1) determining a marginal cost for each of a plurality of energy sources available at the location, at least one of which is a non-grid source of electricity; (2) determining a capacity of electrical energy available from each non-grid energy source; (3) determining a demand for electrical energy at the location; (4) dynamically allocating, in order of lowest marginal cost to highest marginal cost, electrical energy capacity from each of the plurality of energy sources to meet the demand; (5) reducing demand at the location by automatically deferring electrical consumption for a device for which consumption can be deferred from a higher-cost time period to a lower-cost time period, including the computer-implemented step of issuing a command to the device to cause the deferral to occur, and further including determining projected marginal costs in each of a plurality of future time frames and deferring electrical consumption for the device to one of the plurality of future time frames while conforming to an operational constraint for the device, the operational constraint for the device comprising a maximum time duration for which the device can be swithched off.
Claim 3
Dependent Claim
27 words
The method of claim 1 , wherein step (4) comprises the step of allocating electrical energy from at least two of the plurality of energy sources concurrently.
Claim 4
Dependent Claim
26 words
The method of claim 1 , wherein one of the plurality of energy sources comprises a grid-based source of electrical energy having a time-varying marginal cost.
Claim 5
Dependent Claim
26 words
The method of claim 3 , further comprising the step of receiving at the location via electronic means the time-varying marginal cost of the grid-based source.
Claim 6
Dependent Claim
41 words
The method of claim 1 , wherein one of the plurality of energy sources comprises a photovoltaic source having a time-varying capacity, and wherein step (2) comprises the step of determining the capacity of electrical energy available from the photovoltaic source.
Claim 7
Dependent Claim
41 words
The method of claim 1 , wherein one of the plurality of energy sources comprises a microhydro-based source having a time-varying capacity, and wherein step (2) comprises the step of determining the capacity of electrical energy available from the microhydro-based source.
Claim 8
Dependent Claim
19 words
The method of claim 1 , one of the plurality of energy sources comprises a gas turbine-based energy source.
Claim 9
Dependent Claim
43 words
The method of claim 1 , wherein one of the plurality of energy sources comprises a wind-based energy source having a time-varying capacity, and wherein step (2) comprises the step of determining the capacity of electrical energy available from the wind-based energy source.
Claim 10
Dependent Claim
20 words
The method of claim 1 , wherein one of the plurality of energy sources comprises a fuel cell-based energy source.
Claim 11
Dependent Claim
18 words
The method of claim 1 , wherein one of the plurality of energy sources comprises a backup generator.
Claim 12
Dependent Claim
17 words
The method of claim 1 , wherein one of the plurality of energy sources comprises a battery.
Claim 13
Dependent Claim
25 words
The method of claim 1 , wherein step (4) includes treating at least one of the plurality of sources as having a capacity exceeding demand.
Claim 14
Dependent Claim
41 words
The method of claim 1 , further comprising the step of determining whether electrical energy in excess of the demand can be economically sold back to the power grid and, if so, allocating such excess electrical energy to the power grid.
Claim 15
Dependent Claim
31 words
The method of claim 1 , wherein step (5) comprises the step of determining that a solar-based energy source will have a higher capacity in one of the future time frames.
Claim 16
Dependent Claim
29 words
The method of claim 1 , wherein an operational constraint for a second device comprises an end time during which the second device must have completed its operating cycle.
Claim 17
Dependent Claim
34 words
The method of claim 1 , further comprising the step of projecting demand in each of a plurality of future periods based on historical data and using the projected demand in making deferral determinations.
Claim 18
Dependent Claim
36 words
The method of claim 1 , further comprising the step of projecting demand in each of a plurality of future time periods based on weather forecast data and using the projected demand in making deferral determinations.
Claim 19
Dependent Claim
39 words
The method of claim 1 , wherein step (4) comprises the step of allocating non-grid energy sources having a lower marginal cost first and, only if non-grid energy sources cannot satisfy the demand, thereafter allocating a grid-based energy source.
Claim 20
Dependent Claim
36 words
The method of claim 1 , wherein at least one of the plurality of energy sources has a non-constant marginal cost that varies based on the capacity drawn by a single location from that energy source.
Claim 21
Dependent Claim
16 words
The method of claim 17 , wherein the at least one energy source comprises a generator.
Claim 22
Dependent Claim
29 words
The method of claim 1 , wherein step (1) comprises the step of approximating a cost production curve for the at least one energy source using piecewise linear segments.
Claim 23
Dependent Claim
20 words
The method of claim 1 , wherein step (4) comprises the step of dynamically allocating electrical energy from a battery.
Claim 24
Dependent Claim
40 words
The method of claim 1 , further comprising the step of determining, on the basis of step (1), whether to store electrical energy in a battery for later use and, if such determination is made, causing such storage to occur.
Claim 25
Dependent Claim
43 words
The method of claim 1 , further comprising the step of determining, on the basis of a time-varying cost of grid-based electrical energy, whether it is cost-effective to sell electrical energy back to a grid-based source and, if so, automatically initiating such sale.
Claim 26
Dependent Claim
21 words
The method of claim 24 , further comprising the step of selling electrical energy from a battery to the grid-based source.
Claim 27
Dependent Claim
18 words
The method of claim 1 , further comprising the step of projecting future demand in future time periods.
Claim 28
Dependent Claim
29 words
The method of claim 1 , wherein step (2) comprises the step of projecting capacity in each of a plurality of future time periods based on weather forecast data.
Claim 29
Dependent Claim
21 words
The method of claim 1 , further comprising the step of repeating steps (1) through (4) continuously in a computer-controlled loop.
Claim 30
Dependent Claim
203 words
A computer-readable medium comprising computer-readable instructions that, when executed by a computer, perform the steps of: (1) determining a marginal cost for each of a plurality of energy sources available at a location, at least one of which is a non-grid source of electricity; (2) determining a capacity of electrical energy available from each non-grid energy source; (3) determining a demand for electrical energy at the location; (4) dynamically allocating, in order of lowest marginal cost to highest marginal cost, electrical energy capacity from each of the plurality of energy sources to meet the demand; and (5) reducing demand at the location by automatically deferring electrical consumption for a device for which consumption can be deferred from a higher-cost time period to a lower-cost time period, including the computer-implemented step of issuing a command to the device to cause the deferral to occur, and further including determining projected marginal costs in each of a plurality of future time frames and deferring electrical consumption for the device to one of the plurality of future time frames while conforming to an operational constraint for the device, the operational constraint for the device comprising a maximum time duration for which the device can be swithched off.
Claim 31
Dependent Claim
203 words
A computer-readable medium comprising computer-readable instructions that, when executed by a computer, perform the steps of: (1) determining a marginal cost for each of a plurality of energy sources available at a location, at least one of which is a non-grid source of electricity; (2) determining a capacity of electrical energy available from each non-grid energy source; (3) determining a demand for electrical energy at the location; (4) dynamically allocating, in order of lowest marginal cost to highest marginal cost, electrical energy capacity from each of the plurality of energy sources to meet the demand; and (5) reducing demand at the location by automatically deferring electrical consumption for a device for which consumption can be deferred from a higher-cost time period to a lower-cost time period, including the computer-implemented step of issuing a command to the device to cause the deferral to occur, and further including determining projected marginal costs in each of a plurality of future time frames and deferring electrical consumption for the device to one of the plurality of future time frames while conforming to an operational constraint for the device, the operational constraint for the device comprising a maximum time duration for which the device can be swithched off.
Claim 32
Dependent Claim
28 words
The computer readable medium of claim 29 wherein step (4) comprises the step of allocating electrical energy from at least two of the plurality of energy sources concurrently.
Claim 33
Dependent Claim
27 words
The computer-readable medium of claim 29 , wherein one of the plurality of energy sources comprises a grid-based source of electrical energy having a time-varying marginal cost.
Claim 34
Dependent Claim
27 words
The computer-readable medium of claim 31 , further comprising the step of receiving at the location via electronic means the time-varying marginal cost of the grid-based source.
Claim 35
Dependent Claim
42 words
The computer-readable medium of claim 29 , wherein one of the plurality of energy sources comprises a photovoltaic source having a time-varying capacity, and wherein step (2) comprises the step of determining the capacity of electrical energy available from the photovoltaic source.
Claim 36
Dependent Claim
42 words
The computer-readable medium of claim 29 , further comprising the step of determining whether electrical energy in excess of the demand can be economically sold back to the power grid and, if so, allocating such excess electrical energy to the power grid.
Claim 37
Dependent Claim
35 words
The computer-readable medium of claim 29 , further comprising the step of projecting demand in each of a plurality of future periods based on historical data and using the projected demand in making deferral determinations.
Claim 38
Dependent Claim
37 words
The computer-readable medium of claim 29 , further comprising the step of projecting demand in each of a plurality of future time periods based on weather forecast data and using the projected demand in making deferral determinations.
Claim 39
Dependent Claim
41 words
The computer-readable medium of claim 28 , further comprising the step of determining, on the basis of step (1), whether to store electrical energy in a battery for later use and, if such determination is made, causing such storage to occur.
Claim 40
Dependent Claim
43 words
The computer-readable medium claim 29 , further comprising the step of determining, on the basis of a time-varying cost of grid-based electrical energy, whether it is cost-effective to sell electrical energy back to the grid-based source and, if so, automatically initiating such sale.
Claim 41
Independent Claim
210 words
An apparatus, comprising: a computer including a memory, the memory including computer-readable instructions that, when executed by the computer, perform the steps of (1) determining a marginal cost for each of a plurality of energy sources available at a location, at least one of which is a non-grid source of electricity, (2) determining a capacity of electrical energy available from each non-grid energy source, (3) determining a demand for electrical energy at the location, (4) dynamically allocating, in order of lowest marginal cost to highest marginal cost, electrical energy capacity from each of the plurality of energy sources to meet the demand, and (5) reducing demand at the location by automatically deferring electrical consumption for a device for which consumption can be deferred from a higher-cost time period to a lower-cost time period, including the computer-implemented step of issuing a command to the device to cause the deferral to occur, and further including determining projected marginal costs in each of a plurality of future time frames and deferring electrical consumption for the device to one of the plurality of future time frames while conforming to an operational constraint for the device, the operational constraint for the device comprising a maximum time duration for which the device can be switched off.
Claim 42
Independent Claim
210 words
An apparatus, comprising: a computer including a memory, the memory including computer-readable instructions that, when executed by the computer, perform the steps of (1) determining a marginal cost for each of a plurality of energy sources available at a location, at least one of which is a non-grid source of electricity, (2) determining a capacity of electrical energy available from each non-grid energy source, (3) determining a demand for electrical energy at the location, (4) dynamically allocating, in order of lowest marginal cost to highest marginal cost, electrical energy capacity from each of the plurality of energy sources to meet the demand, and (5) reducing demand at the location by automatically deferring electrical consumption for a device for which consumption can be deferred from a higher-cost time period to a lower-cost time period, including the computer-implemented step of issuing a command to the device to cause the deferral to occur, and further including determining projected marginal costs in each of a plurality of future time frames and deferring electrical consumption for the device to one of the plurality of future time frames while conforming to an operational constraint for the device, the operational constraint for the device comprising a maximum time duration for which the device can be switched off.
References Cited (Backward Citations)
US2082110A
Cited
US4104539A
Cited
US4315163A
Cited
US4381457A
Cited
US4384214A
Cited
USRE33504E
Cited
JPH0757170B2
Cited
US4724332A
Cited
US4742291A
Cited
US4742441A
Cited
US4733223A
Cited
US4942509A
Cited
US4894764A
Cited
US4899270A
Cited
JPH0576065B2
Cited
US5218282A
Cited
US5155672A
Cited
US5206537A
Cited
US5969435A
Cited
US5786642A
Cited
US5793125A
Cited
US5150685A
Cited
US5220746A
Cited
JPH05258191A
Cited
US5761083A
Cited
JPH05289694A
Cited
JPH05300564A
Cited
US5373433A
Cited
US5278480A
Cited
US5410720A
Cited
US5286967A
Cited
US5465011A
Cited
JPH06225360A
Cited
US5396165A
Cited
US5338369A
Cited
US5424915A
Cited
US5642002A
Cited
US5621662A
Cited
US5619077A
Cited
US5629601A
Cited
JP2003224892A
Cited
JPH07322363A
Cited
US5412297A
Cited
JPH0819193A
Cited
US5457600A
Cited
US5583413A
Cited
US5939855A
Cited
US5576533A
Cited
US5815086A
Cited
US5572438A
Cited
JPH08195823A
Cited
US5565843A
Cited
US5739596A
Cited
US5917251A
Cited
US5600540A
Cited
US5635770A
Cited
US5590495A
Cited
US5649839A
Cited
US5903446A
Cited
US5612580A
Cited
US5656919A
Cited
US5719758A
Cited
JPH09179909A
Cited
US5675123A
Cited
WO1997049225A1
Cited
US6541941B2
Cited
US5994892A
Cited
US5895440A
Cited
US5789828A
Cited
US5844326A
Cited
US5949640A
Cited
US6028426A
Cited
US6068513A
Cited
US6021052A
Cited
US6177737B1
Cited
WO1999034339A2
Cited
US6618709B1
Cited
US6038156A
Cited
US6507169B1
Cited
US6720107B1
Cited
US5982652A
Cited
US6556410B1
Cited
US6226600B1
Cited
JP2000069575A
Cited
US6278279B1
Cited
US6199136B1
Cited
US6259017B1
Cited
WO2000025478A3
Cited
JP2000184471A
Cited
US6097108A
Cited
US6689507B1
Cited
US6134124A
Cited
US6630751B2
Cited
US6404658B1
Cited
US6400591B2
Cited
US6365990B2
Cited
US6288916B1
Cited
US6657320B1
Cited
US6428694B1
Cited
US6925361B1
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 2010-09-24 | 2011-03-26 | 2011-09-25 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2014-09-24 | 2015-03-26 | 2015-09-25 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2018-09-24 | 2019-03-26 | 2019-09-25 | $7700.00 | Window Closed / Lapsed |