← Back to Patent Explorer
US7274975B2 Expired / Lapsed US ⏱️ 0.0 years remaining

Optimized energy management system

Assignee: Gridpoint Inc
•
Filing: 2005-06-06
•
Granted: 2007-09-25
•
Expires: 2025-06-06
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Methods and systems are provided for optimizing the control of energy supply and demand. An energy control unit includes one or more algorithms for scheduling the control of energy consumption devices on the basis of variables relating to forecast energy supply and demand. Devices for which energy consumption can be scheduled or deferred are activated during periods of cheapest energy usage. Battery storage and alternative energy sources (e.g., photovoltaic cells) are activated to sell energy to the power grid during periods that are determined to correspond to favorable cost conditions.

Inventors

  • 👤 Craig Howard Miller

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 06:56
CPC Classifications
G; G06; G06Q; G06Q50/00; G06Q50/06; G05; G05B; G05B15/00; G05B15/02; H; H02; H02J; H02J3/00; H02J3/008; H02J3/12; H02J3/14; H02J3/28; H02J3/32; H02J7/00; H02J7/34; H02J2105/00; H02J2105/50; H02J2105/54; H02J2105/55; Y; Y02; Y02B; Y02B70/00; Y02B70/30; Y02B70/3225; Y02E; Y02E10/00; Y02E10/50; Y02E10/56; Y02E70/00; Y02E70/30; Y04; Y04S; Y04S20/00; Y04S20/20; Y04S20/222; Y04S50/00; Y04S50/10

Claims Analysis

Total Claims: 42
Claim 1
Independent Claim 206 words
A method for allocating electrical energy at a location where the electrical energy is consumed, comprising the computer-implemented steps of: (1) determining a marginal cost for each of a plurality of energy sources available at the location, at least one of which is a non-grid source of electricity; (2) determining a capacity of electrical energy available from each non-grid energy source; (3) determining a demand for electrical energy at the location; (4) dynamically allocating, in order of lowest marginal cost to highest marginal cost, electrical energy capacity from each of the plurality of energy sources to meet the demand; (5) reducing demand at the location by automatically deferring electrical consumption for a device for which consumption can be deferred from a higher-cost time period to a lower-cost time period, including the computer-implemented step of issuing a command to the device to cause the deferral to occur, and further including determining projected marginal costs in each of a plurality of future time frames and deferring electrical consumption for the device to one of the plurality of future time frames while conforming to an operational constraint for the device, the operational constraint for the device comprising a maximum time duration for which the device can be swithched off.
Claim 2
Independent Claim 206 words
A method for allocating electrical energy at a location where the electrical energy is consumed, comprising the computer-implemented steps of: (1) determining a marginal cost for each of a plurality of energy sources available at the location, at least one of which is a non-grid source of electricity; (2) determining a capacity of electrical energy available from each non-grid energy source; (3) determining a demand for electrical energy at the location; (4) dynamically allocating, in order of lowest marginal cost to highest marginal cost, electrical energy capacity from each of the plurality of energy sources to meet the demand; (5) reducing demand at the location by automatically deferring electrical consumption for a device for which consumption can be deferred from a higher-cost time period to a lower-cost time period, including the computer-implemented step of issuing a command to the device to cause the deferral to occur, and further including determining projected marginal costs in each of a plurality of future time frames and deferring electrical consumption for the device to one of the plurality of future time frames while conforming to an operational constraint for the device, the operational constraint for the device comprising a maximum time duration for which the device can be swithched off.
Claim 3
Dependent Claim 27 words
The method of claim 1 , wherein step (4) comprises the step of allocating electrical energy from at least two of the plurality of energy sources concurrently.
Claim 4
Dependent Claim 26 words
The method of claim 1 , wherein one of the plurality of energy sources comprises a grid-based source of electrical energy having a time-varying marginal cost.
Claim 5
Dependent Claim 26 words
The method of claim 3 , further comprising the step of receiving at the location via electronic means the time-varying marginal cost of the grid-based source.
Claim 6
Dependent Claim 41 words
The method of claim 1 , wherein one of the plurality of energy sources comprises a photovoltaic source having a time-varying capacity, and wherein step (2) comprises the step of determining the capacity of electrical energy available from the photovoltaic source.
Claim 7
Dependent Claim 41 words
The method of claim 1 , wherein one of the plurality of energy sources comprises a microhydro-based source having a time-varying capacity, and wherein step (2) comprises the step of determining the capacity of electrical energy available from the microhydro-based source.
Claim 8
Dependent Claim 19 words
The method of claim 1 , one of the plurality of energy sources comprises a gas turbine-based energy source.
Claim 9
Dependent Claim 43 words
The method of claim 1 , wherein one of the plurality of energy sources comprises a wind-based energy source having a time-varying capacity, and wherein step (2) comprises the step of determining the capacity of electrical energy available from the wind-based energy source.
Claim 10
Dependent Claim 20 words
The method of claim 1 , wherein one of the plurality of energy sources comprises a fuel cell-based energy source.
Claim 11
Dependent Claim 18 words
The method of claim 1 , wherein one of the plurality of energy sources comprises a backup generator.
Claim 12
Dependent Claim 17 words
The method of claim 1 , wherein one of the plurality of energy sources comprises a battery.
Claim 13
Dependent Claim 25 words
The method of claim 1 , wherein step (4) includes treating at least one of the plurality of sources as having a capacity exceeding demand.
Claim 14
Dependent Claim 41 words
The method of claim 1 , further comprising the step of determining whether electrical energy in excess of the demand can be economically sold back to the power grid and, if so, allocating such excess electrical energy to the power grid.
Claim 15
Dependent Claim 31 words
The method of claim 1 , wherein step (5) comprises the step of determining that a solar-based energy source will have a higher capacity in one of the future time frames.
Claim 16
Dependent Claim 29 words
The method of claim 1 , wherein an operational constraint for a second device comprises an end time during which the second device must have completed its operating cycle.
Claim 17
Dependent Claim 34 words
The method of claim 1 , further comprising the step of projecting demand in each of a plurality of future periods based on historical data and using the projected demand in making deferral determinations.
Claim 18
Dependent Claim 36 words
The method of claim 1 , further comprising the step of projecting demand in each of a plurality of future time periods based on weather forecast data and using the projected demand in making deferral determinations.
Claim 19
Dependent Claim 39 words
The method of claim 1 , wherein step (4) comprises the step of allocating non-grid energy sources having a lower marginal cost first and, only if non-grid energy sources cannot satisfy the demand, thereafter allocating a grid-based energy source.
Claim 20
Dependent Claim 36 words
The method of claim 1 , wherein at least one of the plurality of energy sources has a non-constant marginal cost that varies based on the capacity drawn by a single location from that energy source.
Claim 21
Dependent Claim 16 words
The method of claim 17 , wherein the at least one energy source comprises a generator.
Claim 22
Dependent Claim 29 words
The method of claim 1 , wherein step (1) comprises the step of approximating a cost production curve for the at least one energy source using piecewise linear segments.
Claim 23
Dependent Claim 20 words
The method of claim 1 , wherein step (4) comprises the step of dynamically allocating electrical energy from a battery.
Claim 24
Dependent Claim 40 words
The method of claim 1 , further comprising the step of determining, on the basis of step (1), whether to store electrical energy in a battery for later use and, if such determination is made, causing such storage to occur.
Claim 25
Dependent Claim 43 words
The method of claim 1 , further comprising the step of determining, on the basis of a time-varying cost of grid-based electrical energy, whether it is cost-effective to sell electrical energy back to a grid-based source and, if so, automatically initiating such sale.
Claim 26
Dependent Claim 21 words
The method of claim 24 , further comprising the step of selling electrical energy from a battery to the grid-based source.
Claim 27
Dependent Claim 18 words
The method of claim 1 , further comprising the step of projecting future demand in future time periods.
Claim 28
Dependent Claim 29 words
The method of claim 1 , wherein step (2) comprises the step of projecting capacity in each of a plurality of future time periods based on weather forecast data.
Claim 29
Dependent Claim 21 words
The method of claim 1 , further comprising the step of repeating steps (1) through (4) continuously in a computer-controlled loop.
Claim 30
Dependent Claim 203 words
A computer-readable medium comprising computer-readable instructions that, when executed by a computer, perform the steps of: (1) determining a marginal cost for each of a plurality of energy sources available at a location, at least one of which is a non-grid source of electricity; (2) determining a capacity of electrical energy available from each non-grid energy source; (3) determining a demand for electrical energy at the location; (4) dynamically allocating, in order of lowest marginal cost to highest marginal cost, electrical energy capacity from each of the plurality of energy sources to meet the demand; and (5) reducing demand at the location by automatically deferring electrical consumption for a device for which consumption can be deferred from a higher-cost time period to a lower-cost time period, including the computer-implemented step of issuing a command to the device to cause the deferral to occur, and further including determining projected marginal costs in each of a plurality of future time frames and deferring electrical consumption for the device to one of the plurality of future time frames while conforming to an operational constraint for the device, the operational constraint for the device comprising a maximum time duration for which the device can be swithched off.
Claim 31
Dependent Claim 203 words
A computer-readable medium comprising computer-readable instructions that, when executed by a computer, perform the steps of: (1) determining a marginal cost for each of a plurality of energy sources available at a location, at least one of which is a non-grid source of electricity; (2) determining a capacity of electrical energy available from each non-grid energy source; (3) determining a demand for electrical energy at the location; (4) dynamically allocating, in order of lowest marginal cost to highest marginal cost, electrical energy capacity from each of the plurality of energy sources to meet the demand; and (5) reducing demand at the location by automatically deferring electrical consumption for a device for which consumption can be deferred from a higher-cost time period to a lower-cost time period, including the computer-implemented step of issuing a command to the device to cause the deferral to occur, and further including determining projected marginal costs in each of a plurality of future time frames and deferring electrical consumption for the device to one of the plurality of future time frames while conforming to an operational constraint for the device, the operational constraint for the device comprising a maximum time duration for which the device can be swithched off.
Claim 32
Dependent Claim 28 words
The computer readable medium of claim 29 wherein step (4) comprises the step of allocating electrical energy from at least two of the plurality of energy sources concurrently.
Claim 33
Dependent Claim 27 words
The computer-readable medium of claim 29 , wherein one of the plurality of energy sources comprises a grid-based source of electrical energy having a time-varying marginal cost.
Claim 34
Dependent Claim 27 words
The computer-readable medium of claim 31 , further comprising the step of receiving at the location via electronic means the time-varying marginal cost of the grid-based source.
Claim 35
Dependent Claim 42 words
The computer-readable medium of claim 29 , wherein one of the plurality of energy sources comprises a photovoltaic source having a time-varying capacity, and wherein step (2) comprises the step of determining the capacity of electrical energy available from the photovoltaic source.
Claim 36
Dependent Claim 42 words
The computer-readable medium of claim 29 , further comprising the step of determining whether electrical energy in excess of the demand can be economically sold back to the power grid and, if so, allocating such excess electrical energy to the power grid.
Claim 37
Dependent Claim 35 words
The computer-readable medium of claim 29 , further comprising the step of projecting demand in each of a plurality of future periods based on historical data and using the projected demand in making deferral determinations.
Claim 38
Dependent Claim 37 words
The computer-readable medium of claim 29 , further comprising the step of projecting demand in each of a plurality of future time periods based on weather forecast data and using the projected demand in making deferral determinations.
Claim 39
Dependent Claim 41 words
The computer-readable medium of claim 28 , further comprising the step of determining, on the basis of step (1), whether to store electrical energy in a battery for later use and, if such determination is made, causing such storage to occur.
Claim 40
Dependent Claim 43 words
The computer-readable medium claim 29 , further comprising the step of determining, on the basis of a time-varying cost of grid-based electrical energy, whether it is cost-effective to sell electrical energy back to the grid-based source and, if so, automatically initiating such sale.
Claim 41
Independent Claim 210 words
An apparatus, comprising: a computer including a memory, the memory including computer-readable instructions that, when executed by the computer, perform the steps of (1) determining a marginal cost for each of a plurality of energy sources available at a location, at least one of which is a non-grid source of electricity, (2) determining a capacity of electrical energy available from each non-grid energy source, (3) determining a demand for electrical energy at the location, (4) dynamically allocating, in order of lowest marginal cost to highest marginal cost, electrical energy capacity from each of the plurality of energy sources to meet the demand, and (5) reducing demand at the location by automatically deferring electrical consumption for a device for which consumption can be deferred from a higher-cost time period to a lower-cost time period, including the computer-implemented step of issuing a command to the device to cause the deferral to occur, and further including determining projected marginal costs in each of a plurality of future time frames and deferring electrical consumption for the device to one of the plurality of future time frames while conforming to an operational constraint for the device, the operational constraint for the device comprising a maximum time duration for which the device can be switched off.
Claim 42
Independent Claim 210 words
An apparatus, comprising: a computer including a memory, the memory including computer-readable instructions that, when executed by the computer, perform the steps of (1) determining a marginal cost for each of a plurality of energy sources available at a location, at least one of which is a non-grid source of electricity, (2) determining a capacity of electrical energy available from each non-grid energy source, (3) determining a demand for electrical energy at the location, (4) dynamically allocating, in order of lowest marginal cost to highest marginal cost, electrical energy capacity from each of the plurality of energy sources to meet the demand, and (5) reducing demand at the location by automatically deferring electrical consumption for a device for which consumption can be deferred from a higher-cost time period to a lower-cost time period, including the computer-implemented step of issuing a command to the device to cause the deferral to occur, and further including determining projected marginal costs in each of a plurality of future time frames and deferring electrical consumption for the device to one of the plurality of future time frames while conforming to an operational constraint for the device, the operational constraint for the device comprising a maximum time duration for which the device can be switched off.

References Cited (Backward Citations)

US2082110A Cited
US4104539A Cited
US4315163A Cited
US4381457A Cited
US4384214A Cited
USRE33504E Cited
JPH0757170B2 Cited
US4724332A Cited
US4742291A Cited
US4742441A Cited
US4733223A Cited
US4942509A Cited
US4894764A Cited
US4899270A Cited
JPH0576065B2 Cited
US5218282A Cited
US5155672A Cited
US5206537A Cited
US5969435A Cited
US5786642A Cited
US5793125A Cited
US5150685A Cited
US5220746A Cited
JPH05258191A Cited
US5761083A Cited
JPH05289694A Cited
JPH05300564A Cited
US5373433A Cited
US5278480A Cited
US5410720A Cited
US5286967A Cited
US5465011A Cited
JPH06225360A Cited
US5396165A Cited
US5338369A Cited
US5424915A Cited
US5642002A Cited
US5621662A Cited
US5619077A Cited
US5629601A Cited
JP2003224892A Cited
JPH07322363A Cited
US5412297A Cited
JPH0819193A Cited
US5457600A Cited
US5583413A Cited
US5939855A Cited
US5576533A Cited
US5815086A Cited
US5572438A Cited
JPH08195823A Cited
US5565843A Cited
US5739596A Cited
US5917251A Cited
US5600540A Cited
US5635770A Cited
US5590495A Cited
US5649839A Cited
US5903446A Cited
US5612580A Cited
US5656919A Cited
US5719758A Cited
JPH09179909A Cited
US5675123A Cited
WO1997049225A1 Cited
US6541941B2 Cited
US5994892A Cited
US5895440A Cited
US5789828A Cited
US5844326A Cited
US5949640A Cited
US6028426A Cited
US6068513A Cited
US6021052A Cited
US6177737B1 Cited
WO1999034339A2 Cited
US6618709B1 Cited
US6038156A Cited
US6507169B1 Cited
US6720107B1 Cited
US5982652A Cited
US6556410B1 Cited
US6226600B1 Cited
JP2000069575A Cited
US6278279B1 Cited
US6199136B1 Cited
US6259017B1 Cited
WO2000025478A3 Cited
JP2000184471A Cited
US6097108A Cited
US6689507B1 Cited
US6134124A Cited
US6630751B2 Cited
US6404658B1 Cited
US6400591B2 Cited
US6365990B2 Cited
US6288916B1 Cited
US6657320B1 Cited
US6428694B1 Cited
US6925361B1 Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2010-09-24 2011-03-26 2011-09-25 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2014-09-24 2015-03-26 2015-09-25 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2018-09-24 2019-03-26 2019-09-25 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag