US7190149B2
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method and apparatus for determining actual reactive capability curves
Assignee: Emerson Process Management Power and Water Solutions Inc
•
Filing: 2005-03-14
•
Granted: 2007-03-13
•
Expires: 2025-03-14
Abstract
Abstract A system for generating updated reactive capability curves of a generator operates the generator at a number of operating load levels and at a number of different power factors to collect data regarding the real and reactive power generated at each of the various operating load levels and power factors. Subsequently, the system analyzes the collected data to determine an actual reactive capability curve of the generator. The system also provides generator health monitoring and identifies changes and trends in the capability curves of the generator. The updated reactive capability curves may be used by an economic dispatch program in determining optimum MW and MVAR setpoints for the generator.
Inventors
- 👤 Frederick C. Huff
- 👤 Xu Cheng
- 👤 Peter N. Francino
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-31 23:48
CPC Classifications
G; G06; G06Q; G06Q10/00; G06Q10/04; G06F; G06F17/00; G06F17/40; G06Q10/06; G06Q50/00; G06Q50/06; H; H02; H02J; H02J3/00; H02J3/007; H02J3/0075; H02J3/38; H02J3/46; H02J3/50; H02P; H02P9/00; H02P9/10; H02P9/105; Y; Y02; Y02B; Y02B70/00; Y02B70/30; Y02B70/3225; Y02E; Y02E10/00; Y02E10/70; Y02E10/72; Y04; Y04S; Y04S20/00; Y04S20/20; Y04S20/222
Claims Analysis
Total Claims: 17
Claim 1
Independent Claim
90 words
A method of determining a reactive capability curve of a generator, wherein the reactive capability curve includes a plurality of transitional power factors as functions of a plurality of heat input levels, the method comprising: operating the generator at each of the plurality of heat input levels; determining the plurality of transitional power factors for the generator, each of the plurality of transitional power factors corresponding to at least one of the plurality of heat input levels; and determining the reactive capability curve using the plurality of transitional power factors.
Claim 2
Independent Claim
90 words
A method of determining a reactive capability curve of a generator, wherein the reactive capability curve includes a plurality of transitional power factors as functions of a plurality of heat input levels, the method comprising: operating the generator at each of the plurality of heat input levels; determining the plurality of transitional power factors for the generator, each of the plurality of transitional power factors corresponding to at least one of the plurality of heat input levels; and determining the reactive capability curve using the plurality of transitional power factors.
Claim 3
Dependent Claim
56 words
A method of claim 1 , wherein each of the plurality of transitional power factors represents a power factor such that usable MVA of the generator at a power factor incrementally lower than the transitional power factor is less than usable MVA of the generator at a power factor incrementally higher than the transitional power factor.
Claim 4
Dependent Claim
109 words
A method of claim 1 , wherein determining the plurality of transitional power factors comprises: operating the generator at a first power factor and a first heat level, wherein the first power factor is within an estimated optimal operating range of the generator; measuring a first total power level of the generator at the first power factor; incrementally changing power factor level to a new power factor and measuring the new total power of the generator until the new power factor level of the generator is lower than the first total power; and storing the new power factor level as the transitional power factor at the first heat level.
Claim 5
Dependent Claim
60 words
A method of claim 1 , wherein determining the reactive capability curve further comprises representing the plurality of heat level inputs and the corresponding plurality of transitional power factors using at least one of: (1) neural network techniques; (2) data mining techniques; (3) multiple regression analysis; (4) polynomial fitting; (5) spline techniques; (6) wavelet analysis techniques; and (7) genetic/evolutionary algorithms.
Claim 6
Dependent Claim
29 words
A method of claim 1 , wherein determining the reactive capability curve further comprises regressing the plurality of heat level inputs and the corresponding plurality of transitional power factors.
Claim 7
Dependent Claim
27 words
A method of claim 5 , further comprising using the reactive capability curve in an economic dispatch program used to allocate a power demand to the generator.
Claim 8
Dependent Claim
49 words
A method of claim 1 , further comprising: storing a plurality of reactive capability curves, each of the plurality of reactive capability of curves corresponding to a distinct point in time over a time period; and analyzing the plurality of reactive capability curves to determine health of the generator.
Claim 9
Dependent Claim
25 words
A method of claim 7 , further comprising analyzing the plurality of reactive capability curves to determine a trend in the health of the generator.
Claim 10
Dependent Claim
163 words
A reactive capability curve estimation system for determining a reactive capability curve of a generator, wherein the reactive capability curve includes a plurality of transitional power factors as a functions of a plurality of heat level inputs, the system comprising: a computer processor communicatively connected to the generator; a computer readable memory; a first routine stored on the computer readable memory and adapted to be operable on the computer processor to operate the generator at each of the plurality of heat input levels; a second routine stored on the computer readable memory and adapted to be operable on the computer processor to determine the plurality of transitional power factors for the generator; each of the plurality of power factors corresponding to at least one of the plurality of heat input levels; and a third routine stored on the computer readable memory and adapted to be operable on the computer processor to determine the reactive capability curve using the plurality of transitional power factors.
Claim 11
Dependent Claim
163 words
A reactive capability curve estimation system for determining a reactive capability curve of a generator, wherein the reactive capability curve includes a plurality of transitional power factors as a functions of a plurality of heat level inputs, the system comprising: a computer processor communicatively connected to the generator; a computer readable memory; a first routine stored on the computer readable memory and adapted to be operable on the computer processor to operate the generator at each of the plurality of heat input levels; a second routine stored on the computer readable memory and adapted to be operable on the computer processor to determine the plurality of transitional power factors for the generator; each of the plurality of power factors corresponding to at least one of the plurality of heat input levels; and a third routine stored on the computer readable memory and adapted to be operable on the computer processor to determine the reactive capability curve using the plurality of transitional power factors.
Claim 12
Dependent Claim
55 words
A system of claim 9 wherein each of the plurality of transitional power factor represents a power factor such that usable MVA of the generator at a power factor incrementally lower than the transitional power factor is less than usable MVA of the generator at a power factor incrementally higher than the transitional power factor.
Claim 13
Dependent Claim
118 words
A system of claim 9 , wherein the second routine comprises: a first computer program adapted to operate the generator at a first power factor, wherein the first power factor is within an estimated optimal operating range of the generator; a second computer program adapted to measure a first total power level of the generator at the first power factor; a third computer program adapted to incrementally change power factor level to a new power factor and measuring the new total power of the generator until the new power level of the generator is lower than the first total power; and a fourth computer program adapted to store the new power factor level as the transitional power factor.
Claim 14
Dependent Claim
71 words
A system of claim 9 , wherein the third routine is further adapted to represent the plurality of heat level inputs and the corresponding plurality of transitional power factors via at least one of: ( 1 ) neural network; ( 2 ) data mining; ( 3 ) multiple regression analysis; ( 4 ) polynomial fitting; ( 5 ) spline techniques; ( 6 ) wavelet analysis techniques;and ( 7 ) genetic/evolutionary algorithms.
Claim 15
Dependent Claim
29 words
A system of claim 9 , wherein the third routine is further adapted to regress the plurality of heat level inputs and the corresponding plurality of transitional power factors.
Claim 16
Dependent Claim
46 words
A system of claim 9 , further comprising a fourth routine stored in the computer readable memory and adapted to be operable on the computer processor to use the reactive capability curve in an economic dispatch program used to allocate a power demand to the generator.
Claim 17
Dependent Claim
85 words
A system of claim 9 , further comprising: a sixth routine stored in the computer readable memory and adapted to store a plurality of reactive capability curves on the computer readable memory, each of the plurality of reactive capability of curves corresponding to a distinct point in time over a time period; and a seventh routine stored in the computer readable memory and adapted to be operable on the computer processor to analyze the plurality of reactive capability curves to determine health of the generator.
References Cited (Backward Citations)
US3949291A
Cited
US4029951A
Cited
US4482857A
Cited
US4590416A
Cited
US4891948A
Cited
US4888954A
Cited
US5081591A
Cited
US5159562A
Cited
US5581470A
Cited
US5347466A
Cited
US5432710A
Cited
US5278772A
Cited
US5321308A
Cited
US6294898B2
Cited
US20010001534A1
Cited
US6204642B1
Cited
WO2002057968A1
Cited
US6853930B2
Cited
US6907381B2
Cited
US7065472B2
Cited
US6492801B1
Cited
US6900998B2
Cited
US6924628B2
Cited
US20060085363A1
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 2010-03-12 | 2010-09-11 | 2011-03-13 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2014-03-12 | 2014-09-11 | 2015-03-13 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2018-03-12 | 2018-09-11 | 2019-03-13 | $7700.00 | Window Closed / Lapsed |