← Back to Patent Explorer
US6907381B2 Expired / Lapsed US ⏱️ 0.0 years remaining

System for aiding the preparation of operation and maintenance plans for a power-generation installation

Assignee: Mitsubishi Power Ltd
•
Filing: 2004-03-29
•
Granted: 2005-06-14
•
Expires: 2024-03-29
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In order to provide an operation and maintenance planning aiding system for a power generation installation which prepares an operation plan for a plurality of power generation units by making use of actual plant data and based on a total judgment including a variety of circumstances of the machine and apparatus or the parts thereof in the power generation units, in the system the plurality of power generation units 41, 42, 51 and 52 , a power supply command center 3 and a service center 1 are arranged and connected via a communication network 6 , the service center 1 obtains the plant data via the communication network 6 from the plurality of power generation units 41, 42, 51 and 52 , calculates in real time a power generation efficiency of a concerned power generation unit for every plurality of power generation units 41, 42 51 and 52 by making use of the obtained plant data and design data of the concerned power generation unit and prepares an operation and maintenance plan for each of the power generation units based on the calculated power generation efficiency.

Inventors

  • 👤 Yoshiharu Hayashi
  • 👤 Hidekazu Fujimura
  • 👤 Masao Furukawa
  • 👤 Katsuhito Shimizu
  • 👤 Yasushi Hayasaka

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 21:12
CPC Classifications
G; G06; G06Q; G06Q10/00; G06Q10/06; G05; G05F; G05F1/00; G05F1/66; G06Q50/00; G06Q50/06; H; H02; H02J; H02J3/00; H02J3/11; H02J2103/00; H02J2103/30; Y; Y02; Y02B; Y02B70/00; Y02B70/30; Y02B70/3225; Y02E; Y02E40/00; Y02E40/70; Y02E60/00; Y04; Y04S; Y04S10/00; Y04S10/50; Y04S20/00; Y04S20/20; Y04S20/222; Y04S40/00; Y04S40/20; Y10; Y10S; Y10S706/00; Y10S706/902; Y10S706/911; Y10S706/914; Y10S706/915

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 103 words
A system for aiding the preparation of operation and maintenance plans for a power generation installation, in which plant data are obtained from a plurality of power generation units, wherein for each of the plurality of power generation units, power generation efficiency for the concerned power generation unit is calculated by making use of the obtained plant data, and further wherein failure probability of machines and apparatus or the parts thereof in the plurality of power generation units is calculated, and operation and maintenance plans for the respective power generation units are prepared based on the calculated power generation efficiency and failure probability.
Claim 2
Independent Claim 103 words
A system for aiding the preparation of operation and maintenance plans for a power generation installation, in which plant data are obtained from a plurality of power generation units, wherein for each of the plurality of power generation units, power generation efficiency for the concerned power generation unit is calculated by making use of the obtained plant data, and further wherein failure probability of machines and apparatus or the parts thereof in the plurality of power generation units is calculated, and operation and maintenance plans for the respective power generation units are prepared based on the calculated power generation efficiency and failure probability.
Claim 3
Independent Claim 132 words
A system for aiding the preparation of operation and maintenance plans for a power generation installation, in which plant data are obtained from a plurality of power generation units, and wherein for each of the plurality of power generation units, power generation efficiency for the concerned power generation unit is calculated by making use of the obtained plant data, and further wherein failure history of machines and apparatus or the parts thereof in the plurality of power generation units is stored in a database, failure probability of the respective machines and apparatus or the parts thereof is calculated by making use of the failure history stored in the database, and operation and maintenance plans for the respective power generation units are prepared based on the calculated power generation efficiency and failure probability.
Claim 4
Independent Claim 132 words
A system for aiding the preparation of operation and maintenance plans for a power generation installation, in which plant data are obtained from a plurality of power generation units, and wherein for each of the plurality of power generation units, power generation efficiency for the concerned power generation unit is calculated by making use of the obtained plant data, and further wherein failure history of machines and apparatus or the parts thereof in the plurality of power generation units is stored in a database, failure probability of the respective machines and apparatus or the parts thereof is calculated by making use of the failure history stored in the database, and operation and maintenance plans for the respective power generation units are prepared based on the calculated power generation efficiency and failure probability.
Claim 5
Dependent Claim 72 words
A system for aiding the preparation of operation and maintenance plans for a power generation installation according to claim 1 , wherein a periodical inspection information data base representing information of periodical inspections is provided, and further wherein operation and maintenance plans for the respective power generation units are prepared based on the periodical inspection information stored in the periodical inspection information database and the calculated power generation efficiency and failure probability.
Claim 6
Dependent Claim 72 words
A system for aiding the preparation of operation and maintenance plans for a power generation installation according to claim 2 , wherein a periodical inspection information data base representing information of periodical inspection is provided, and further wherein operation and maintenance plans for the respective power generation units are prepared based on the periodical inspection information stored in the periodical inspection information database and the calculated power generation efficiency and failure probability.
Claim 7
Independent Claim 118 words
A system for aiding the preparation of operation and maintenance plans for a power generation installation, comprising: means for obtaining plant data from a plurality of power generation units and for calculating for each of the plurality of power generation units power generation efficiency for a concerned power generation unit by making use of the obtained plant data; a periodical inspection information data base representing information of periodical inspections; and means for evaluating failure frequency in the plurality of power generation units; wherein operation and maintenance plans for the respective power generation units are set based on the periodical inspection information stored in the periodical inspection information database, the calculated power generation efficiency and the evaluated failure frequency.
Claim 8
Independent Claim 118 words
A system for aiding the preparation of operation and maintenance plans for a power generation installation, comprising: means for obtaining plant data from a plurality of power generation units and for calculating for each of the plurality of power generation units power generation efficiency for a concerned power generation unit by making use of the obtained plant data; a periodical inspection information data base representing information of periodical inspections; and means for evaluating failure frequency in the plurality of power generation units; wherein operation and maintenance plans for the respective power generation units are set based on the periodical inspection information stored in the periodical inspection information database, the calculated power generation efficiency and the evaluated failure frequency.
Claim 9
Independent Claim 99 words
A method for aiding the preparation of operation and maintenance plans for a power generation installation, the method comprising the acts of: obtaining plant data from a plurality of power generation units; for each of the plurality of power generation units, calculating power generation efficiency for a concerned power generation unit by making use of the obtained plant data; calculating failure probability of machines and apparatus or the parts thereof in the plurality of power generation units; and setting operation and maintenance plans for the respective power generation units based on the calculated power generation efficiency and failure probability.
Claim 10
Independent Claim 99 words
A method for aiding the preparation of operation and maintenance plans for a power generation installation, the method comprising the acts of: obtaining plant data from a plurality of power generation units; for each of the plurality of power generation units, calculating power generation efficiency for a concerned power generation unit by making use of the obtained plant data; calculating failure probability of machines and apparatus or the parts thereof in the plurality of power generation units; and setting operation and maintenance plans for the respective power generation units based on the calculated power generation efficiency and failure probability.
Claim 11
Independent Claim 128 words
A method of aiding the preparation of operation and maintenance plans for a power generation installation, the method comprising the acts of: obtaining plant data from a plurality of power generation units; for each of the plurality of power generation units, calculating power generation efficiency for a concerned power generation unit by making use of the obtained plant data; storing a failure history of machines and apparatus or the parts thereof in the plurality of power generation units in a database; calculating a failure probability of the respective machines and apparatus or the parts thereof by making use of the failure history stored in the database; and preparing operation and maintenance plans for the respective power generation units based on the calculated power generation efficiency and failure probability.
Claim 12
Independent Claim 128 words
A method of aiding the preparation of operation and maintenance plans for a power generation installation, the method comprising the acts of: obtaining plant data from a plurality of power generation units; for each of the plurality of power generation units, calculating power generation efficiency for a concerned power generation unit by making use of the obtained plant data; storing a failure history of machines and apparatus or the parts thereof in the plurality of power generation units in a database; calculating a failure probability of the respective machines and apparatus or the parts thereof by making use of the failure history stored in the database; and preparing operation and maintenance plans for the respective power generation units based on the calculated power generation efficiency and failure probability.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2008-06-13 2008-12-13 2009-06-14 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2012-06-13 2012-12-13 2013-06-14 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2016-06-13 2016-12-13 2017-06-14 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag