Claims Analysis
Total Claims: 24
Claim 1
Independent Claim
76 words
A method for assigning priority to lots in the process of manufacturing of a product comprising: calculating budget queue time (Budget_Q) of the lots at each step of a manufacturing plant, comparing the Budget_Q for a lot for the same product at different stages and through the use of the budget queue time to define delivery week X, setting a temporary priority (P) according to Budget_Q only, and determining priority of lots competing for identical capacity.
Claim 2
Independent Claim
76 words
A method for assigning priority to lots in the process of manufacturing of a product comprising: calculating budget queue time (Budget_Q) of the lots at each step of a manufacturing plant, comparing the Budget_Q for a lot for the same product at different stages and through the use of the budget queue time to define delivery week X, setting a temporary priority (P) according to Budget_Q only, and determining priority of lots competing for identical capacity.
Claim 3
Dependent Claim
40 words
A method in accordance with claim 1 including: calculating C tqR =required_date step Budget_Q, calculating C tqD =due_date step Budget_Q, and calculating Budget_Q as the minimum of C tqR , C tqD , min (C tqR , C tqD ).
Claim 4
Dependent Claim
73 words
A method in accordance with claim 1 including: a Master Production Schedule (MPS) determine RP (Remaining Theoretical Recipe Processing Time of a lot) determine an integer I = RP 7 days if, for a lot, Budget_Q>1.1*RP, then the delivery week X is determined by the Master Production Schedule (MPS), and if, for a lot, Budget_Q<1.1*RP, then the delivery week X is determined by integer I.
Claim 5
Dependent Claim
42 words
A method in accordance with claim 1 including, wherein there is a Base Rate (BR), setting temporary priority P as follows: if Budget_Q<1.5*BR, then P=1, if Budget_Q<2*BR, then P=2, if Budget_Q<3*BR, then P=3, if Budget_Q<4*BR, then P=4, and if Budget_Q>4*BR, then P=5.
Claim 6
Dependent Claim
54 words
A method in accordance with claim 1 including: if values of the delivery week X are different, then the lot with a smaller value of X gets a higher priority, if values of the delivery week X are equal, then the lot with a larger value of temporary priority P gets the higher priority.
Claim 7
Dependent Claim
101 words
A method in accordance with claim 1 including: C tqR =required 13 date step Budget_Q is calculated, C tqD =due_date step Budget_Q is calculated, and Budget_Q is calculated as the minimum of C tqR , C tqD , min (C tqR , C tqD ), and Remaining Process time RP of a lot is determined, an integer I = RP 7 , if, for a lot, Budget_Q>1.1*RP, then the delivery week X is determined by a Master Production Schedule (MPS), and if, for a lot, Budget_Q<1.1*RP, then the delivery week X is determined by the integer I.
Claim 8
Dependent Claim
133 words
A method in accordance with claim 1 wherein there is a Base Rate (BR), including: C tqR =required_date step Budget_Q is calculated, C tqD =due_date step Budget_Q is calculated, and Budget_Q is calculated as the minimum of C tqR , C tqD , min (C tqR , C tqD ), Remaining Process time RP of a lot is determined, an integer I = RP 7 , if, for a lot, Budget_Q>1.1*RP, then the delivery week X is determined by a Master Production Schedule (MPS), and if, for a lot, Budget_Q<1.1*RP, then the delivery week X is determined by the integer I, and setting temporary priority P as follows: if Budget_Q<1.5*BR, then P=1, if Budget_Q<2*BR, then P=2, if Budget_Q<3*BR, then P=3, if Budget_Q<4*BR, then P=4, and if Budget_Q>4*BR, then P=5.
Claim 9
Dependent Claim
99 words
A method in accordance with claim 1 , wherein there is a Base Rate (BR), including: Remaining Process time RP of a lot is determined, an integer I = RP 7 , if, for a lot, Budget_Q>1.1*RP, then the delivery week X is determined by a Master Production Schedule (MPS), and if, for a lot, Budget_Q<1.1*RP, then the delivery week X is determined by the integer I, and setting temporary priority P as follows: if Budget_Q<1.5*BR, then P=1, if Budget_Q<2*BR, then P=2, if Budget_Q<3*BR, then P=3, if Budget_Q<4*BR, then P=4, and if Budget_Q>4*BR, then P=5.
Claim 10
Dependent Claim
71 words
A method in accordance with claim 1 including: C tqR =required_date step Budget_Q is calculated, C tqD =due_date step Budget_Q is calculated, and Budget_Q is calculated as the minimum of C tqR , C tqD , min (C tqR , C tqD ), and setting temporary priority P as follows: if Budget_Q<1.5*BR, then P=1, if Budget_Q<2*BR, then P=2, if Budget_Q<3*BR, then P=3, if Budget_Q<4*BR, then P=4, and if Budget_Q>4*BR, then P=5.
Claim 11
Independent Claim
197 words
A method for assigning priority to lots in the manufacturing of a product, wherein there is a Base Rate (BR), comprising: calculating budget queue time (Budget_Q) of the lots at each step of a manufacturing plant, comparing the Budget_Q for a lot for a product at different stages and through the use of the budget queue time to define delivery week X, set a temporary priority (P) according to Budget_Q only, determine priority of lots competing for identical capacity, C tqR =required_date step Budget_Q is calculated, C tqD =due_date step Budget_Q is calculated, and Budget_Q is calculated as the minimum of C tqR , C tqD , min (C tqR , C tqD ), Remaining Process time RP of a lot is determined, an integer I = RP 7 , if, for a lot, Budget_Q>1.1*RP, then the delivery week X is determined by a Master Production Schedule (MPS), and if, for a lot, Budget_Q<1.1*RP, then the delivery week X is determined by the integer I, and setting temporary priority P as follows: if Budget_Q<1.5*BR, then P=1, if Budget_Q<2*BR, then P=2, if Budget_Q<3*BR, then P=3, if Budget_Q<4*BR, then P=4, and if Budget_Q>4*BR, then P=5.
Claim 12
Independent Claim
197 words
A method for assigning priority to lots in the manufacturing of a product, wherein there is a Base Rate (BR), comprising: calculating budget queue time (Budget_Q) of the lots at each step of a manufacturing plant, comparing the Budget_Q for a lot for a product at different stages and through the use of the budget queue time to define delivery week X, set a temporary priority (P) according to Budget_Q only, determine priority of lots competing for identical capacity, C tqR =required_date step Budget_Q is calculated, C tqD =due_date step Budget_Q is calculated, and Budget_Q is calculated as the minimum of C tqR , C tqD , min (C tqR , C tqD ), Remaining Process time RP of a lot is determined, an integer I = RP 7 , if, for a lot, Budget_Q>1.1*RP, then the delivery week X is determined by a Master Production Schedule (MPS), and if, for a lot, Budget_Q<1.1*RP, then the delivery week X is determined by the integer I, and setting temporary priority P as follows: if Budget_Q<1.5*BR, then P=1, if Budget_Q<2*BR, then P=2, if Budget_Q<3*BR, then P=3, if Budget_Q<4*BR, then P=4, and if Budget_Q>4*BR, then P=5.
Claim 13
Independent Claim
83 words
A system for assigning priority to lots in the manufacturing of a product comprising: means for calculating budget queue time (Budget_Q) of the lots at each step of a manufacturing plant, means for comparing the Budget_Q for a lot for a product at different stages and through the use of the budget queue time to define the delivery week X, means for setting a temporary priority (P) according to Budget_Q only, and means for determining the priority of lots competing for identical capacity.
Claim 14
Independent Claim
83 words
A system for assigning priority to lots in the manufacturing of a product comprising: means for calculating budget queue time (Budget_Q) of the lots at each step of a manufacturing plant, means for comparing the Budget_Q for a lot for a product at different stages and through the use of the budget queue time to define the delivery week X, means for setting a temporary priority (P) according to Budget_Q only, and means for determining the priority of lots competing for identical capacity.
Claim 15
Dependent Claim
46 words
A system in accordance with claim 11 including: means for calculating C tqR =required_date step Budget_Q, means for calculating C tqD =due_date step Budget_Q, and means for calculating Budget_Q as the minimum of C tqR , C tqD as min (C tqR , C tqD ).
Claim 16
Dependent Claim
68 words
A system in accordance with claim 11 wherein: means for determining Remaining Process time RP of a lot, an integer I = RP 7 , means for determining that if, for a lot, Budget_Q>1.1*RP, then the delivery week X is determined by a Master Production Schedule (MPS), and if, for a lot, Budget_Q<1.1*RP, then the delivery week X is determined by the integer I.
Claim 17
Dependent Claim
39 words
A system in accordance with claim 11 wherein: means is provided for setting temporary priority P as follows: if Budget_Q<1.5*BR, then P=1, if Budget_Q<2*BR, then P=2, if Budget_Q<3*BR, then P=3, if Budget_Q<4*BR, then P=4, and if Budget_Q>4*BR, then P=5.
Claim 18
Dependent Claim
63 words
A system in accordance with claim 11 wherein: means for determining that if the values of delivery week X are different, then the lot with a smaller value of X gets a higher priority, and means for determining that if the values of delivery week X are equal, then the lot with a larger value of temporary priority P gets the higher priority.
Claim 19
Dependent Claim
105 words
A system in accordance with claim 11 wherein: means for calculating C tqR =required date step Budget_Q, means for calculating C tqD =due_date step Budget_Q, and means for calculating Budget_Q as the minimum of C tqR , C tqD as min (C tqR , C tqD ), means for determining Remaining Process time RP of a lot, means for determining integer I equals RP/7, means for determining that a) if, for a lot, Budget_Q>1.1*RP, then the delivery week X is determined by a Master Production Schedule (MPS), and b) if, for a lot, Budget_Q<1.1*RP, then the delivery week X is determined by the integer I.
Claim 20
Dependent Claim
139 words
A system in accordance with claim 11 , wherein there is a Base Rate (BR), comprising: C tqR =required_date step Budget_Q is calculated, C tqD =due_date step Budget_Q is calculated, and Budget_Q is calculated as the minimum of C tqR , C tqD , min (C tqR , C tqD ) the Remaining Process time RP of a lot is determined, an integer I = RP 7 , if, for a lot, Budget_Q>1.1*RP, then the delivery week X is determined by a Master Production Schedule (MPS), and if, for a lot, Budget_Q<1.1*RP, then the delivery week X is determined by the integer I, and means is provided for setting temporary priority P as follows: if Budget_Q<1.5*BR, then P=1, if Budget_Q<2*BR, then P=2, if Budget_Q<3*BR, then P=3, if Budget_Q<4*BR, then P=4, and if Budget_Q>4*BR, then P=5.
Claim 21
Dependent Claim
104 words
A system in accordance with claim 11 , wherein there is a Base Rate (BR), comprising: the Remaining Process time RP of a lot is determined, an integer I = RP 7 , if, for a lot, Budget_Q>1.1*RP, then the delivery week X is determined by a Master Production Schedule (MPS), and if, for a lot, Budget_Q<1.1*RP, then the delivery week X is determined by the integer I, and means is provided for setting temporary priority P as follows: if Budget_Q<1.5*BR, then P=1, if Budget_Q<2*BR, then P=2, if Budget_Q<3*BR, then P=3, if Budget_Q<4*BR, then P=4, and if Budget_Q>4*BR, then P=5.
Claim 22
Dependent Claim
75 words
A system in accordance with claim 11 wherein: C tqR =required_date step Budget_Q is calculated, C tqD =due_date step Budget_Q is calculated, and Budget_Q is calculated as the minimum of C tqR , C tqD , min (C tqR , C tqD ), and means is provided for setting temporary priority P as follows: if Budget_Q<1.5*BR, then P=1, if Budget_Q<2*BR, then P=2, if Budget_Q<3*BR, then P=3, if Budget_Q<4*BR, then P=4, and if Budget_Q>4*BR, then P=5.
Claim 23
Independent Claim
269 words
A system for assigning priority to lots in the manufacturing of a product, wherein there is a Base Rate (BR), comprising: means for calculating budget queue time (Budget_Q) of the lots at each step of a manufacturing plant, means for comparing the Budget_Q for a lot for a product at different stages and through the use of the budget queue time to define delivery week X, means for setting a temporary priority (P) according to Budget_Q only, and means for determining the priority of lots competing for an identical capacity, means for calculating C tqR =required_date step Budget_Q, means for calculating C tqD =due_date step Budget_Q, and means for calculating Budget_Q as the minimum of C tqR , C tqD as min (C tqR , C tqD ), means for determining the Remaining Process time RP of a lot, means for determining an integer I as RP/7, means for determining that if, for a lot, Budget_Q>1.1*RP, then the delivery week X is determined by a Master Production Schedule (MPS), and if, for a lot, Budget_Q<1.1*RP, then the delivery week X is determined by the integer I, setting temporary priority P as follows: if Budget_Q<1.5*BR, then P=1, if Budget_Q<2*BR, then P=2, if Budget_Q<3*BR, then P=3, if Budget_Q<4*BR, then P=4, and if Budget_Q>4*BR, then P=5, and means for determining that if the values of delivery week X are different, then the lot with a smaller value of X gets the higher priority, and means for determining that if the values of delivery week X are equal, then the lot with a larger value of temporary priority P gets the higher priority.
Claim 24
Independent Claim
269 words
A system for assigning priority to lots in the manufacturing of a product, wherein there is a Base Rate (BR), comprising: means for calculating budget queue time (Budget_Q) of the lots at each step of a manufacturing plant, means for comparing the Budget_Q for a lot for a product at different stages and through the use of the budget queue time to define delivery week X, means for setting a temporary priority (P) according to Budget_Q only, and means for determining the priority of lots competing for an identical capacity, means for calculating C tqR =required_date step Budget_Q, means for calculating C tqD =due_date step Budget_Q, and means for calculating Budget_Q as the minimum of C tqR , C tqD as min (C tqR , C tqD ), means for determining the Remaining Process time RP of a lot, means for determining an integer I as RP/7, means for determining that if, for a lot, Budget_Q>1.1*RP, then the delivery week X is determined by a Master Production Schedule (MPS), and if, for a lot, Budget_Q<1.1*RP, then the delivery week X is determined by the integer I, setting temporary priority P as follows: if Budget_Q<1.5*BR, then P=1, if Budget_Q<2*BR, then P=2, if Budget_Q<3*BR, then P=3, if Budget_Q<4*BR, then P=4, and if Budget_Q>4*BR, then P=5, and means for determining that if the values of delivery week X are different, then the lot with a smaller value of X gets the higher priority, and means for determining that if the values of delivery week X are equal, then the lot with a larger value of temporary priority P gets the higher priority.