Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
121 words
A method for increasing the thermal efficiency of a combined cycle power plant using excess thermal energy to treat a municipal water source, comprising the steps of: a. vaporizing and superheating a multi-component working fluid by transferring thermal energy from a gas turbine exhaust to said working fluid in a heat recovery vapor generator; b. first expanding the working fluid through a high pressure turbine to produce electric energy and a heat source for a downstream regenerative economizer and a regenerative boiler; c. transferring thermal energy from the outlet of said high pressure turbine to said working fluid through said regenerative economizer and said regenerative boiler; and d. condensing said working fluid by transferring thermal energy to said municipal water source.
Claim 2
Independent Claim
121 words
A method for increasing the thermal efficiency of a combined cycle power plant using excess thermal energy to treat a municipal water source, comprising the steps of: a. vaporizing and superheating a multi-component working fluid by transferring thermal energy from a gas turbine exhaust to said working fluid in a heat recovery vapor generator; b. first expanding the working fluid through a high pressure turbine to produce electric energy and a heat source for a downstream regenerative economizer and a regenerative boiler; c. transferring thermal energy from the outlet of said high pressure turbine to said working fluid through said regenerative economizer and said regenerative boiler; and d. condensing said working fluid by transferring thermal energy to said municipal water source.
Claim 3
Dependent Claim
19 words
A method as recited in claim 1 , wherein said working fluid comprises a mixture of ammonia and water.
Claim 4
Dependent Claim
31 words
A method as recited in claim 1 wherein said working fluid becomes superheated as a result of the transfer of thermal energy from said gas turbine exhaust to said working fluid.
Claim 5
Dependent Claim
38 words
A method as recited in claim 1 , further comprising the step of expanding a portion of the vaporized working fluid exiting from said high pressure turbine through a second intermediate pressure turbine to produce additional electric power.
Claim 6
Dependent Claim
36 words
A method as recited in claim 4 further comprising the steps of condensing said vaporized working fluid from said intermediate pressure turbine through a condenser and recombining the resulting condensed working fluid with said working fluid.
Claim 7
Independent Claim
106 words
An apparatus for implementing a thermodynamic cycle to heat a district water supply comprising: a. a heat recovery vapor generator for vaporizing and superheating a multi-component working fluid; b. a high pressure turbine for expanding said working fluid to generate electric power; c. a regenerative boiler for cooling said working fluid on one side while vaporizing recycled working fluid on the other side; d. a regenerative economizer for cooling said working fluid on one side and heating said recycled working fluid on the other side; and e. a condenser for condensing said working fluid on one side and heating aid district water on the other side.
Claim 8
Independent Claim
106 words
An apparatus for implementing a thermodynamic cycle to heat a district water supply comprising: a. a heat recovery vapor generator for vaporizing and superheating a multi-component working fluid; b. a high pressure turbine for expanding said working fluid to generate electric power; c. a regenerative boiler for cooling said working fluid on one side while vaporizing recycled working fluid on the other side; d. a regenerative economizer for cooling said working fluid on one side and heating said recycled working fluid on the other side; and e. a condenser for condensing said working fluid on one side and heating aid district water on the other side.
Claim 9
Dependent Claim
21 words
An apparatus as claimed in claim 6 , wherein said regenerative economizer and said regenerative boiler consist of shell-and-tube heat exchangers.
Claim 10
Dependent Claim
73 words
An apparatus as claimed in claim 6 further comprising a. an intermediate pressure turbine downstream from said high pressure turbine for further expanding said working fluid to generate additional electric power; b. a preheater for heating recycled working fluid on one side and cooling the intermediate pressure turbine exhaust on the other side; and c. a secondary condenser in series with said preheater for condensing said recycled working fluid using plant cooling water.