Method for production planning in an uncertain demand environment
Assignee: International Business Machines Corp
•
Filing: 1999-07-27
•
Granted: 2000-10-24
•
Expires: 2019-07-27
Abstract
Abstract A decision-making method suitable for production planning in an uncertain demand environment. To this end, the method comprises combining an implosion technology with a scenario-based analysis, thus manifesting, a sui generis capability which preserves the advantages and benefits of each of its subsumed aspects.
Inventors
- 👤 Feng Cheng
- 👤 Daniel Patrick Connors
- 👤 Thomas Robert Ervolina
- 👤 Ramesh Srinivasan
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 05:37
CPC Classifications
G; G06; G06Q; G06Q10/00; G06Q10/04; G06Q10/06; G06Q10/063; G06Q10/0637; G06Q10/06375; G06Q10/0639; G06Q10/06393; G06Q10/08; G06Q10/087; G06Q10/0872; G06Q10/08726; G06Q10/0875; G06Q20/00; G06Q20/08; G06Q20/20; G06Q20/201; G06Q20/207; G06Q30/00; G06Q30/02; G06Q30/0201; G06Q30/0202; G06Q40/00
Claims Analysis
Total Claims: 9
Claim 1
Independent Claim
135 words
A program storage readable by a machine, tangibly embodying a program of instructions executable by a machine to perform method steps for production planning in an uncertain demand environment, said method steps comprising: a) inputting a plurality of demand scenarios over a timing horizon and a probability associated with each of said demand scenario which represent uncertainties in a demand environment; b) employing a scenario-based analysis including the steps of performing multiple optimization runs against different demand scenarios; c) combining an implosion technology with the scenario-based analysis for generating for any one individual demand scenario, a deterministic solution which is optimal for the particular demand scenario; and, d) generating an output comprising a payoff table that includes said solution for each demand scenario, each said solution being optimized in accordance with a selected performance measure.
Claim 2
Dependent Claim
135 words
A program storage readable by a machine, tangibly embodying a program of instructions executable by a machine to perform method steps for production planning in an uncertain demand environment, said method steps comprising: a) inputting a plurality of demand scenarios over a timing horizon and a probability associated with each of said demand scenario which represent uncertainties in a demand environment; b) employing a scenario-based analysis including the steps of performing multiple optimization runs against different demand scenarios; c) combining an implosion technology with the scenario-based analysis for generating for any one individual demand scenario, a deterministic solution which is optimal for the particular demand scenario; and, d) generating an output comprising a payoff table that includes said solution for each demand scenario, each said solution being optimized in accordance with a selected performance measure.
Claim 3
Dependent Claim
21 words
A device according to claim 1, wherein the method comprises creating a production plan based initially on a particular demand scenario.
Claim 4
Dependent Claim
23 words
A device according to claim 2, wherein the method comprises a step of adjusting the production plan according to unfolding sequel demand scenarios.
Claim 5
Dependent Claim
25 words
A device according to claim 2, wherein the method comprises obtaining from the production plan an implementable production policy for an entire demand scenario tree.
Claim 6
Dependent Claim
27 words
A device according to claim 1, wherein the method comprises computing an expected performance measure for each implementable production policy based on a particular initial demand scenario.
Claim 7
Dependent Claim
19 words
The program storage readable by a machine as claimed in claim 1, wherein said selected performance measure includes revenue.
Claim 8
Dependent Claim
36 words
The program storage readable by a machine as claimed in claim 1, wherein said selected performance measure includes profit, said payoff table providing solutions that take into account costs including one of backlog penalties and obsolescence.
Claim 9
Dependent Claim
19 words
The program storage readable by a machine as claimed in claim 1, wherein said selected performance measure includes serviceability.
References Cited (Backward Citations)
No citation records indexed.
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 2003-10-24 | 2004-04-24 | 2004-10-24 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2007-10-24 | 2008-04-24 | 2008-10-24 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2011-10-24 | 2012-04-24 | 2012-10-24 | $7700.00 | Window Closed / Lapsed |