← Back to Patent Explorer
US6109531A Expired / Lapsed US ⏱️ 0.0 years remaining

High reliability heating system

Assignee: Individual
•
Filing: 1998-11-24
•
Granted: 2000-08-29
•
Expires: 2018-11-24
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A high reliability heating system that includes dual furnace control mechanisms wherein each furnace control mechanism includes blowers and control elements and each is independently operable to control the operation of a shared furnace burner unit and heat exchanger. The heating system preferably includes a controller mechanism selector mechanism that detects an abnormal operating condition, malfunction, in the controlling furnace controller mechanism and, in response, automatically switches control to the other furnace controller mechanism.

Inventors

  • 👤 Brien Hollis

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 15:06
CPC Classifications
F; F24; F24D; F24D19/00; F24D19/10; F24D19/1084; F24H; F24H15/00; F24H15/10; F24H15/104; F24H15/30; F24H15/305; F24H15/31; F24H15/345; F24H15/395; F24H15/40; F24H15/407; F24D2200/00; F24D2200/04; F24D2200/043

Claims Analysis

Total Claims: 3
Claim 1
Independent Claim 152 words
A high reliability heating system comprising: a furnace burner unit; a heat exchanger in heat receiving connection with said furnace burner unit; first and second furnace control mechanisms, each said first and second furnace control mechanism includes blowers and control elements in functional relationship with said furnace burner unit and said heat exchanger; each said first and second furnace control mechanism being independently operable to control the operation of said furnace burner unit and said heat exchanger; and a controller mechanism selector mechanism having a control input in connection with said first furnace control mechanism and being in controlling connection with said first and second furnace control mechanism such that, in response to receiving an abnormal operation signal from said first furnace control mechanism, said controller mechanism selector mechanism switches control of said furnace burner unit and said heat exchanger from said first furnace controller mechanism to said second furnace controller mechanism.
Claim 2
Dependent Claim 152 words
A high reliability heating system comprising: a furnace burner unit; a heat exchanger in heat receiving connection with said furnace burner unit; first and second furnace control mechanisms, each said first and second furnace control mechanism includes blowers and control elements in functional relationship with said furnace burner unit and said heat exchanger; each said first and second furnace control mechanism being independently operable to control the operation of said furnace burner unit and said heat exchanger; and a controller mechanism selector mechanism having a control input in connection with said first furnace control mechanism and being in controlling connection with said first and second furnace control mechanism such that, in response to receiving an abnormal operation signal from said first furnace control mechanism, said controller mechanism selector mechanism switches control of said furnace burner unit and said heat exchanger from said first furnace controller mechanism to said second furnace controller mechanism.
Claim 3
Dependent Claim 440 words
The high reliability heating system of claim 1 wherein: said controller mechanism selector mechanism includes a controller board selector relay having a relay control input, first and second sets of power switching contacts, and first and second sets of thermostat control signal switching contacts; and said first and said second furnace control mechanisms include, respectively, a first and a second controller board; each of said first and second controller boards having a status LED output that generates a normal operation output signal and an abnormal operation output signal; said first controller board having a power input wired through said first set of power switching contacts of said controller board selector relay and being in signal receiving connection with a first upper limit sensing unit having an upper limit switch and an auxiliary upper limit switch wired in series, a first negative pressure controller, a first flame sensor, and a first thermostat control signal; and in controlling connection with a first main gas valve assembly including a number of series connected roll out switches and a first main gas control valve, a first draft inducer blower having a vacuum connection connected to a vacuum controlled control input of said first negative pressure controller, a first main blower, and a first hot surface ignitor; said second controller board having a power input wired through said second set of power switching contacts of said controller board selector relay and being in signal receiving connection with a second upper limit sensing unit having an upper limit switch and an auxiliary upper limit switch wired in series, a second negative pressure controller, a second flame sensor, and a second thermostat control signal; and in controlling connection with a second main gas valve assembly including a number of series connected roll out switches and a second main gas control valve, a second draft inducer blower having a vacuum connection connected to a vacuum controlled control input of said second negative pressure controller, a second main blower, and a second hot surface ignitor; said relay control input of said controller board selector relay being in controlled connection with said status LED output of said first controller board such that when said first controller board status LED output generates an abnormal operation output signal, such as when a system component fails, said controller board selector relay disconnects said first controller board from said first thermostat control signal and supply power in response to said abnormal operation output signal and connects said second controller board with supply power and said second thermostat control signal switching control of said furnace burner unit and heat exchanger to said second controller board.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2003-08-29 2004-02-28 2004-08-29 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2007-08-29 2008-02-28 2008-08-29 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2011-08-29 2012-02-28 2012-08-29 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag