Patent US2610008A successfully refreshed from Google Patents.
Patent US6102958A successfully refreshed from Google Patents.
← Back to Patent Explorer
US6102958A Expired / Lapsed US ⏱️ 0.0 years remaining

Multiresolutional decision support system

Assignee: Drexel University
•
Filing: 1997-04-08
•
Granted: 2000-08-15
•
Expires: 2017-04-08
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A process control system determines optimal trajectories (input controls) using multiresolutional analysis of acquired data. In contrast to conventional control systems, the present control system does not use a predetermined mathematical model or algorithm to define the process in terms of a plurality of variables. Rather, the present system acquires system data and stores the data in a multiresolutional data structure. A knowledge base is created which can be searched at varying levels of resolution for determining optimal process trajectories. The continual addition of data to the data structure allows for continual top-down refinement of the determined trajectories and bottom-up improvement and updating of the system representation.

Inventors

  • 👤 Alexander Meystel
  • 👤 Sameh Uzzaman

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-09 08:03
CPC Classifications
G; G06; G06F; G06F17/00; G06F17/10; Y; Y10; Y10S; Y10S706/00; Y10S706/902; Y10S706/903; Y10S706/906; Y10S706/907

Claims Analysis

Total Claims: 7
Claim 1
Independent Claim 174 words
In a power plant, a planning and control system for determining output trajectories of a predefined output behavior and input control commands for achieving the predefined output behavior, the system comprising: (a) means for acquiring data related to at least one process variable of the power plant; (b) means for organizing the acquired data and generating at least one state input-output string therefrom; (c) means for fusing the strings into associative clusters, the clusters forming a function oriented, goal-independent provisional model of the power plant; (d) means for generating a multiresolutional data structure based upon the associative data clusters for transforming the provisional model into at least one level of resolution incorporating embedded local dynamics of the power plant; (e) means for searching the multiresolutional data structure at varying levels of resolution to determine an optimal trajectory of operation for achieving the predefined output behavior; and (f) means for generating control signals for controlling at least one operational variable of the power plant such that the power plant operates according to the optimal trajectory.
Claim 2
Dependent Claim 174 words
In a power plant, a planning and control system for determining output trajectories of a predefined output behavior and input control commands for achieving the predefined output behavior, the system comprising: (a) means for acquiring data related to at least one process variable of the power plant; (b) means for organizing the acquired data and generating at least one state input-output string therefrom; (c) means for fusing the strings into associative clusters, the clusters forming a function oriented, goal-independent provisional model of the power plant; (d) means for generating a multiresolutional data structure based upon the associative data clusters for transforming the provisional model into at least one level of resolution incorporating embedded local dynamics of the power plant; (e) means for searching the multiresolutional data structure at varying levels of resolution to determine an optimal trajectory of operation for achieving the predefined output behavior; and (f) means for generating control signals for controlling at least one operational variable of the power plant such that the power plant operates according to the optimal trajectory.
Claim 3
Dependent Claim 17 words
The system of claim 1 wherein the data is acquired on-line and the search is conducted off-line.
Claim 4
Dependent Claim 163 words
In a power plant, a method for determining output trajectories of a predefined output behavior and input control commands for achieving the predefined output behavior, the method comprising the steps of: (a) acquiring data related to at least one process variable of the power plant; (b) organizing the acquired data and generating at least one state input-output string therefrom; (c) fusing the strings into associative clusters, the clusters forming a function oriented, goal-independent provisional model of the power plant; (d) generating a multiresolutional data structure based upon the associative data clusters for transforming the provisional model into at least one level of resolution incorporating embedded local dynamics of the power plant; (e) recursively searching the multiresolutional data structure at varying levels of resolution to determine an optimal trajectory of operation for achieving the predefined output behavior; and (f) generating control signals for controlling at least one operational variable of the power plant such that the power plant operates according to the optimal trajectory.
Claim 5
Dependent Claim 163 words
In a power plant, a method for determining output trajectories of a predefined output behavior and input control commands for achieving the predefined output behavior, the method comprising the steps of: (a) acquiring data related to at least one process variable of the power plant; (b) organizing the acquired data and generating at least one state input-output string therefrom; (c) fusing the strings into associative clusters, the clusters forming a function oriented, goal-independent provisional model of the power plant; (d) generating a multiresolutional data structure based upon the associative data clusters for transforming the provisional model into at least one level of resolution incorporating embedded local dynamics of the power plant; (e) recursively searching the multiresolutional data structure at varying levels of resolution to determine an optimal trajectory of operation for achieving the predefined output behavior; and (f) generating control signals for controlling at least one operational variable of the power plant such that the power plant operates according to the optimal trajectory.
Claim 6
Dependent Claim 44 words
The method of claim 3 wherein step (e) further comprises synthesizing optimal trajectories of process operation using a search applied to the multiresolutional data structure at successively higher levels of resolution with subsequent propagation of the search results to successively lower levels of resolution.
Claim 7
Dependent Claim 17 words
The method of claim 3 wherein the data is acquired on-line and the search is conducted off-line.

References Cited (Backward Citations)

US5083256A Cited
US5305230A Cited
US5301284A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2003-08-15 2004-02-14 2004-08-15 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2007-08-15 2008-02-14 2008-08-15 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2011-08-15 2012-02-14 2012-08-15 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag