Claims Analysis
Total Claims: 14
Claim 1
Independent Claim
305 words
A power generation control system having a plurality of control states for electric power transformation having a full wave rectifier connected to a generator, a DC bus connected to the output of the full wave rectifier, an inverter connected to the DC bus, an inductor unit connected to the output of the inverter, a first contactor unit connecting and disconnecting the inductor unit to and from a grid, and a precharge circuit connected to the DC bus; the power generation control system comprising: an initialization state for initializing the state machine; a first neutral state for idling the state machine while monitoring commands and system parameters; a pre-charge state for enabling and monitoring the precharge circuit to pre-charge the DC bus to a pre-charge DC voltage; a second neutral state for disabling the pre-charge circuit and closing the first contactor; an engine start state for verifying DC link voltage, sending a speed command to the start inverter unit, enabling the start inverter, updating the speed command being sent to the start inverter unit, and determining successful engine start; a power on-line state for enabling a current mode in said inverter and controlling the inverter to deliver power at a level determined by a power level command; a power off-line state for opening the first contactor, switching the inverter to a voltage mode, and setting the power level command to a nominal power level; a shutdown state for disabling the inverter, opening the first contactor after waiting for a cool-down time period, and reinitializing the state machine, a state controller for controlling the following permitted transitions between said control states: said initialization state → said first neutral state ←→ said pre-charge state → said second neutral state ←→ said start engine state ←→ said power on-line state → said power off-line state → said shutdown state.
Claim 2
Dependent Claim
305 words
A power generation control system having a plurality of control states for electric power transformation having a full wave rectifier connected to a generator, a DC bus connected to the output of the full wave rectifier, an inverter connected to the DC bus, an inductor unit connected to the output of the inverter, a first contactor unit connecting and disconnecting the inductor unit to and from a grid, and a precharge circuit connected to the DC bus; the power generation control system comprising: an initialization state for initializing the state machine; a first neutral state for idling the state machine while monitoring commands and system parameters; a pre-charge state for enabling and monitoring the precharge circuit to pre-charge the DC bus to a pre-charge DC voltage; a second neutral state for disabling the pre-charge circuit and closing the first contactor; an engine start state for verifying DC link voltage, sending a speed command to the start inverter unit, enabling the start inverter, updating the speed command being sent to the start inverter unit, and determining successful engine start; a power on-line state for enabling a current mode in said inverter and controlling the inverter to deliver power at a level determined by a power level command; a power off-line state for opening the first contactor, switching the inverter to a voltage mode, and setting the power level command to a nominal power level; a shutdown state for disabling the inverter, opening the first contactor after waiting for a cool-down time period, and reinitializing the state machine, a state controller for controlling the following permitted transitions between said control states: said initialization state → said first neutral state ←→ said pre-charge state → said second neutral state ←→ said start engine state ←→ said power on-line state → said power off-line state → said shutdown state.
Claim 3
Dependent Claim
51 words
The power generation control system according to claim 1, further comprising: a third neutral state for receiving a command including the power level command and a shutdown command; said state controller permitting the following additional state transitions: said start engine state → said third neutral state ←→ said power on-line state.
Claim 4
Dependent Claim
65 words
The power generation control system according to claim 1, said state controller permitting the following additional state transitions: neutral state → pre-charge state upon receiving a pre-charge start command; precharge state → neutral state when a pre-charge rate at which said pre-charge circuit charges the DC bus is not within tolerance values or when the DC bus voltage does not achieve the pre-charge DC voltage.
Claim 5
Dependent Claim
42 words
The power generation control system according to claim 1, said state controller permitting the following additional state transitions: pre-charge state → start engine state upon successfully achieving the precharge DC voltage on the DC bus and receipt of a start engine command.
Claim 6
Dependent Claim
123 words
The power generation control system according to claim 1, said state controller permitting the following additional state transitions: start engine state → third neutral state upon receiving a zero power level command, third neutral state → power on-line state upon successful engine start and receiving a nonzero power level command, power on-line state → power off-line state upon receipt of an off-line command or upon a failed diagnostic test or a grid outage, power off-line → third neutral state upon successful diagnostic tests for a predetermined time period, third neutral state → shutdown upon receiving a shutdown command, shutdown state → said first neutral state upon receiving restart command, and said second neutral → shutdown state upon a fault condition or shutdown command.
Claim 7
Dependent Claim
47 words
The power generation control system according to claim 1, the device further including an emergency stop input, said state machine controller opening the first contactor unit and switching the control state to said shutdown state upon receipt of an emergency stop signal from the emergency stop input.
Claim 8
Dependent Claim
37 words
The power generation control system according to claim 1, said pre-charge state and said start engine state respectively returning to said first and second neutral states upon failure of a pre-charge cycle and a start engine cycle.
Claim 9
Dependent Claim
28 words
The power generation control system according to claim 2, said power on-line state returning to said third neutral step when the power level command indicates zero requested power.
Claim 10
Dependent Claim
39 words
The power generation control system according to claim 1, wherein said initialization, pre-charge, power on-line, power off-line, and/or shutdown states perform diagnostic tests on the device, said state controller controlling state transitions based on results of the diagnostic tests.
Claim 11
Dependent Claim
92 words
The power generation control system according to claim 1, the device further including an engine for driving said generator, an engine control unit connected to said engine, and a start inverter connected to the DC bus and to said generator, said engine control unit controlling said engine ignition and fuel for the engine, said engine start state controlling said start inverter to drive the generator as a motor to thereby spin the engine and permit starting thereof, said engine start state also sending an engine start command to the engine control unit.
Claim 12
Dependent Claim
36 words
The power generation control system according to claim 10, wherein said initialization, pre-charge, power on-line, power off-line, and/or shutdown states monitor the engine, said state controller controlling state transitions based on results of the diagnostic tests.
Claim 13
Dependent Claim
29 words
The power generation control system according to claim 1, said pre-charge state also diagnosing the inverter, said state controller controlling state transitions based on results of the diagnostic tests.
Claim 14
Dependent Claim
56 words
The power generation control system according to claim 1, said engine start state determining successful engine start by monitoring current drawn from the DC bus by the start inverter and engine speed wherein if the current drawn falls below a current limit value and an engine speed exceeds a speed limit then engine start is successful.