Abstract

Abstract A combined cycle power generating system includes high, intermediate and low pressure vapor turbines for driving a generator or other load by expanding a multi-component fluid mixture through the turbines. A gas turbine is drivingly connected to the generator or other load. The expanded multi-component mixture exhausted from the intermediate pressure turbine flows in heat exchange relation with the fuel inlet to the combustor for the gas turbine whereby the gas turbine fuel is preheated to reduce fuel consumption of the gas turbine and increase combined cycle efficiency.

Inventors

  • 👤 Jatila Ranasinghe
  • 👤 Raub Warfield Smith

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 17:14
CPC Classifications
F; F01; F01K; F01K25/00; F01K25/06; F01K23/00; F01K23/02; F01K23/06; F01K23/10; F01K25/065; Y; Y02; Y02E; Y02E20/00; Y02E20/16

Claims Analysis

Total Claims: 16
Claim 1
Independent Claim 116 words
In a combined cycle power generating system having a plurality of turbines, including first and second vapor turbines, and a gas turbine for driving one or more generators for generating electricity or mechanical work, a method of increasing the efficiency of the system, comprising the steps of: (a) expanding a working fluid through the first vapor turbine; (b) reheating expanded working fluid from the first vapor turbine; (c) expanding the reheated working fluid through the second vapor turbine; (d) cooling the working fluid exhausted from the second vapor turbine; and (e) heating fuel for combustion in the gas turbine by passing the fuel in heat exchange relation with the working fluid expanded through said second turbine.
Claim 2
Dependent Claim 116 words
In a combined cycle power generating system having a plurality of turbines, including first and second vapor turbines, and a gas turbine for driving one or more generators for generating electricity or mechanical work, a method of increasing the efficiency of the system, comprising the steps of: (a) expanding a working fluid through the first vapor turbine; (b) reheating expanded working fluid from the first vapor turbine; (c) expanding the reheated working fluid through the second vapor turbine; (d) cooling the working fluid exhausted from the second vapor turbine; and (e) heating fuel for combustion in the gas turbine by passing the fuel in heat exchange relation with the working fluid expanded through said second turbine.
Claim 3
Dependent Claim 29 words
A method according to claim 1 wherein the step (e) of heating is performed subsequent to the step (d) of cooling the working fluid expanded through the second turbine.
Claim 4
Dependent Claim 29 words
A method according to claim 1 wherein the step (e) of heating is performed prior to the step (d) of cooling the working fluid expanded through the second turbine.
Claim 5
Dependent Claim 21 words
A method according to claim 1 including passing the working fluid, subsequent to step (e), to a distillation/condensation subsystem for condensation.
Claim 6
Dependent Claim 33 words
A method according to claim 4 wherein the distillation/condensation subsystem has at least two condensers operable at different pressure levels, and including the step of passing the working fluid through said two condensers.
Claim 7
Dependent Claim 57 words
A method according to claim 1 including heating the working fluid in a boiler in heat exchange relation with exhaust gases from the gas turbine, and cooling the working fluid exhausted from the second vapor turbine by passing the exhausted working fluid in heat exchange relation with a portion of the working fluid passing through said boiler.
Claim 8
Dependent Claim 41 words
A method according to claim 3 including a third turbine and including the steps of expanding the cooled working fluid through the third turbine subsequent to heating the fuel by heat exchange with the working fluid expanded through said second turbine.
Claim 9
Dependent Claim 134 words
In a combined cycle power generating system having a plurality of turbines including first and second vapor turbines and a gas turbine for driving one or more generators for generating electricity or mechanical work, a method of increasing the efficiency of the system, comprising the steps of: expanding through a first vapor turbine a working fluid comprised of a mixture of dissimilar components having different boiling points at identical pressure; reheating the expanded working fluid mixture from the first vapor turbine; expanding the reheated working fluid mixture through the second vapor turbine; heating fuel for combustion in the gas turbine by passing fuel in heat exchange relation with the working fluid mixture expanded through said second vapor turbine; and passing the working fluid, subsequent to heating the fuel, to a distillation/condensation subsystem for condensation.
Claim 10
Dependent Claim 134 words
In a combined cycle power generating system having a plurality of turbines including first and second vapor turbines and a gas turbine for driving one or more generators for generating electricity or mechanical work, a method of increasing the efficiency of the system, comprising the steps of: expanding through a first vapor turbine a working fluid comprised of a mixture of dissimilar components having different boiling points at identical pressure; reheating the expanded working fluid mixture from the first vapor turbine; expanding the reheated working fluid mixture through the second vapor turbine; heating fuel for combustion in the gas turbine by passing fuel in heat exchange relation with the working fluid mixture expanded through said second vapor turbine; and passing the working fluid, subsequent to heating the fuel, to a distillation/condensation subsystem for condensation.
Claim 11
Dependent Claim 38 words
A method according to claim 8 including a third turbine, expanding the working fluid mixture through the third turbine subsequent to passing the fuel in heat exchange relation with the working fluid mixture expanded through the second turbine.
Claim 12
Dependent Claim 27 words
A method according to claim 8 wherein the step of heating is performed subsequent to the step of cooling the working fluid expanded through the second turbine.
Claim 13
Dependent Claim 27 words
A method according to claim 8 wherein the step of heating is performed prior to the step of cooling the working fluid expanded through the second turbine.
Claim 14
Dependent Claim 33 words
A method according to claim 8 wherein the distillation/condensation subsystem has at least two condensers operable at different pressure levels, and including the step of passing the working fluid through said two condensers.
Claim 15
Dependent Claim 80 words
A method according to claim 8 including heating the working fluid in a first boiler in heat exchange relation with exhaust gases from the gas turbine, passing a first portion of the working fluid expanded through the second turbine in heat exchange relation with the fuel and passing a second portion of the working fluid expanded through the second turbine through a regenerative boiler in heat exchange relation with a portion of the working fluid passing through said first boiler.
Claim 16
Dependent Claim 30 words
A method according to claim 13 including a third vapor turbine, combining the first and second working fluid portions and expanding the combined working fluid portions through the third turbine.

References Cited (Backward Citations)

US3974642A Cited
US4586340A Cited
US4604867A Cited
US4732005A Cited
US4932204A Cited
US5095708A Cited
US5440871A Cited
US5704206A Cited
US5887418A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2003-05-23 2003-11-22 2004-05-23 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2007-05-23 2007-11-22 2008-05-23 $3760.00 Window Closed / Lapsed