Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
107 words
A semiconductor device which performs a predetermined operation, said semiconductor device comprising: a timing-stabilization circuit which performs a timing adjustment with respect to an internal clock signal; a current-consumption circuit which consumes a predetermined amount of a current so as to emulate conditions of such current consumption as would be observed during said predetermined operation of said semiconductor device; and a start-up-period control circuit which makes said timing-stabilization circuit and said current-consumption circuit operate at a beginning of power supply so as to perform said timing adjustment under said conditions, and stops operations of said timing-stabilization circuit and said current-consumption circuit after completion of said timing adjustment.
Claim 2
Dependent Claim
107 words
A semiconductor device which performs a predetermined operation, said semiconductor device comprising: a timing-stabilization circuit which performs a timing adjustment with respect to an internal clock signal; a current-consumption circuit which consumes a predetermined amount of a current so as to emulate conditions of such current consumption as would be observed during said predetermined operation of said semiconductor device; and a start-up-period control circuit which makes said timing-stabilization circuit and said current-consumption circuit operate at a beginning of power supply so as to perform said timing adjustment under said conditions, and stops operations of said timing-stabilization circuit and said current-consumption circuit after completion of said timing adjustment.
Claim 3
Dependent Claim
45 words
The semiconductor device as claimed in claim 1, further comprising a first circuit which generates a first signal upon detecting said beginning of power supply, wherein said start-up-period control circuit makes said timing-stabilization circuit and said current-consumption circuit operate in response to said first signal.
Claim 4
Dependent Claim
57 words
The semiconductor device as claimed in claim 2, further comprising a second circuit which generates a second signal in response to an external input supplied in conjunction with a start of operations of said semiconductor device, wherein said start-up-period control circuit stops operations of said timing-stabilization circuit and said current-consumption circuit in response to said second signal.
Claim 5
Dependent Claim
17 words
The semiconductor device as claimed in claim 1, wherein said current-consumption circuit comprises at least one transistor.
Claim 6
Dependent Claim
25 words
The semiconductor device as claimed in claim 4, wherein said current-consumption circuit further comprises a resistor connected in series with said at least one transistor.
Claim 7
Dependent Claim
46 words
The semiconductor device as claimed in claim 5, wherein said at least one transistor has an ON resistance smaller than a resistance of said resistor, and a temperature-dependent resistance change of said resistor is smaller that a temperature-dependent ON-resistance change of said at least one transistor.
Claim 8
Dependent Claim
35 words
The semiconductor device as claimed in claim 1, wherein said current-consumption circuit includes a plurality of separate circuits provided at different positions within said semiconductor device, each of said separate circuits consuming a respective current.
Claim 9
Dependent Claim
16 words
The semiconductor device as claimed in claim 1, wherein said timing-stabilization circuit includes a DLL circuit.
Claim 10
Dependent Claim
137 words
The semiconductor device as claimed in claim 1, further comprising: a plurality of timing-stabilization circuits each performing a respective timing adjustment regarding a respective internal clock signal, said plurality of timing-stabilization circuits including said timing-stabilization circuit; and a plurality of current-consumption circuits which consumes a respective predetermined amount of a current with respect to a respective power voltage, said current-consumption circuits including said current-consumption circuit, wherein said start-up-period control circuit makes said plurality of timing-stabilization circuits and said plurality of current-consumption circuits operate at said beginning of power supply, and stops operations of said plurality of timing-stabilization circuits and said plurality of current-consumption circuits after completion of said respective timing adjustment, thereby performing said respective timing adjustment under such respective conditions as would be observed when said semiconductor device operates by using said respective internal clock signal.