Claims Analysis
Total Claims: 15
Claim 1
Independent Claim
141 words
A method for projecting service availability in a telecommunication network, comprising the steps of: (1) recording trouble tickets to document impact on actual availability due to actions of network personnel until an availability projection request for a portion of the network has been made; (2) compiling said trouble records and SONET ring data applicable to said portion of the network for which said availability projection request was made; (3) determining empirical availability factors accounting for outages due to at least one of a cable cut, an equipment failure, and an interruption factor; (4) combining empirical availability factors, planned actions, and accepted reliability factors to obtain a realistic availability projection for said network portion, wherein said realistic availability projection is based on one of historical interruption averages in conjunction with accepted reliability factors and planned actions in conjunction with accepted reliability factors.
Claim 2
Independent Claim
141 words
A method for projecting service availability in a telecommunication network, comprising the steps of: (1) recording trouble tickets to document impact on actual availability due to actions of network personnel until an availability projection request for a portion of the network has been made; (2) compiling said trouble records and SONET ring data applicable to said portion of the network for which said availability projection request was made; (3) determining empirical availability factors accounting for outages due to at least one of a cable cut, an equipment failure, and an interruption factor; (4) combining empirical availability factors, planned actions, and accepted reliability factors to obtain a realistic availability projection for said network portion, wherein said realistic availability projection is based on one of historical interruption averages in conjunction with accepted reliability factors and planned actions in conjunction with accepted reliability factors.
Claim 3
Dependent Claim
35 words
The method of claim 1, wherein said interruption factor comprises the step of determining average frequency and duration of interruptions when a redundant path is not available as a temporary replacement for a working path.
Claim 4
Dependent Claim
100 words
The method of claim 1, wherein step (4) further comprises the steps of: determining projected availability based on historical interruption averages in conjunction with accepted reliability factors; getting applicable planned actions; determining frequency and interruption duration for said applicable planned actions; determining projected availability based on planned actions in conjunction with accepted reliability factor; outputting projected availability based on historical interruptions, if impact of historical interruptions greater than impact of planned actions; and outputting projected availability based on said planned actions and the historical impact of said planned actions, if impact of planned actions greater than impact of historical interruptions.
Claim 5
Independent Claim
145 words
A system for projecting service availability in a telecommunications network, the system comprising: means for recording trouble tickets to document impact on actual availability due to actions of network personnel until an availability projection request for a portion of the network has been made; means for compiling said trouble records and SONET ring data applicable to said portion of the network for which said availability projection request was made; means for determining empirical availability factors accounting for outages due to at least one of a cable cut, an equipment failure, and an interruption factor; and means for combining empirical availability factors, planned actions, and accepted reliability factors to obtain a realistic availability projection for said network portion, wherein said realistic availability protection is based on one of historical interruption averages in conjunction with accepted reliability factors and planned actions in conjunction with accepted reliability factors.
Claim 6
Independent Claim
145 words
A system for projecting service availability in a telecommunications network, the system comprising: means for recording trouble tickets to document impact on actual availability due to actions of network personnel until an availability projection request for a portion of the network has been made; means for compiling said trouble records and SONET ring data applicable to said portion of the network for which said availability projection request was made; means for determining empirical availability factors accounting for outages due to at least one of a cable cut, an equipment failure, and an interruption factor; and means for combining empirical availability factors, planned actions, and accepted reliability factors to obtain a realistic availability projection for said network portion, wherein said realistic availability protection is based on one of historical interruption averages in conjunction with accepted reliability factors and planned actions in conjunction with accepted reliability factors.
Claim 7
Dependent Claim
34 words
The system of claim 4, wherein said interruption factor comprises means for determining average frequency and duration of interruptions when a redundant path is not available as a temporary replacement for a working path.
Claim 8
Dependent Claim
106 words
The system of claim 4, further comprising: means for determining projected availability based on historical interruption averages in conjunction with accepted reliability factors; means for gathering applicable planned actions; means for determining frequency and interruption duration for said applicable planned actions; means for determining projected availability based on planned actions in conjunction with accepted reliability factor; means for outputting projected availability based on historical interruptions, if impact of historical interruptions greater than impact of planned actions; and means for outputting projected availability based on said planned actions and the historical impact of said planned actions, if impact of planned actions greater than impact of historical interruptions.
Claim 9
Independent Claim
198 words
A system for projecting service availability in a telecommunication network, the system comprising: a managed network, said managed network comprising a multitude of interconnected switches to carry and route telecommunications traffic among customer endpoints; a network management system connected to said interconnected switches in said managed network via control links, wherein said network management system monitors the switching activity of said managed network; a plurality of databases, wherein each of said databases stores one of maintenance actions and reliability factors; storage means for storing said plurality of databases; a projected availability processor connected to said network management system, wherein said projected availability processor collects information from said network management system and said plurality of databases and determines service availability estimates, applicable to a specific customer and portion of the network, that accounts for outages due to at least one of a cable cut, an equipment failure, and an interruption factor, said service availability estimates are based on one of historical interruption averages in conjunction with accepted reliability factors and planned actions in conjunction with accepted reliability factors; and a workstation connected to said projected availability processor, whereby said workstation allows a user to update said plurality of databases.
Claim 10
Independent Claim
198 words
A system for projecting service availability in a telecommunication network, the system comprising: a managed network, said managed network comprising a multitude of interconnected switches to carry and route telecommunications traffic among customer endpoints; a network management system connected to said interconnected switches in said managed network via control links, wherein said network management system monitors the switching activity of said managed network; a plurality of databases, wherein each of said databases stores one of maintenance actions and reliability factors; storage means for storing said plurality of databases; a projected availability processor connected to said network management system, wherein said projected availability processor collects information from said network management system and said plurality of databases and determines service availability estimates, applicable to a specific customer and portion of the network, that accounts for outages due to at least one of a cable cut, an equipment failure, and an interruption factor, said service availability estimates are based on one of historical interruption averages in conjunction with accepted reliability factors and planned actions in conjunction with accepted reliability factors; and a workstation connected to said projected availability processor, whereby said workstation allows a user to update said plurality of databases.
Claim 11
Dependent Claim
34 words
The system of claim 7, wherein said network management system further comprises a trouble management system, wherein said trouble management system records maintenance actions for said managed network in a trouble ticket record database.
Claim 12
Dependent Claim
189 words
A computer program product comprising a computer useable medium having computer program logic recorded thereon for enabling a processor in a computer system to compute projected service availability based on maintenance actions for a managed network, said computer program logic comprising: means to enable said processor to record trouble tickets to document impact on actual availability due to actions of network personnel until an availability projection request for a portion of the network has been made; means to enable said processor to compile said trouble records and SONET ring data applicable to said portion of the network for which said availability projection request was made; means to enable said processor to determine empirical availability factors accounting for outages due to at least one of a cable cut, and equipment failure, and an interruption factor; and means to enable said processor to combine empirical availability factors, planned actions, and accepted reliability factors to obtain a realistic availability projection for said network portion, wherein said realistic availability projection is based on one of historical interruption averages in conjunction with accepted reliability factors and planned actions in conjunction with accepted reliability factors.
Claim 13
Dependent Claim
189 words
A computer program product comprising a computer useable medium having computer program logic recorded thereon for enabling a processor in a computer system to compute projected service availability based on maintenance actions for a managed network, said computer program logic comprising: means to enable said processor to record trouble tickets to document impact on actual availability due to actions of network personnel until an availability projection request for a portion of the network has been made; means to enable said processor to compile said trouble records and SONET ring data applicable to said portion of the network for which said availability projection request was made; means to enable said processor to determine empirical availability factors accounting for outages due to at least one of a cable cut, and equipment failure, and an interruption factor; and means to enable said processor to combine empirical availability factors, planned actions, and accepted reliability factors to obtain a realistic availability projection for said network portion, wherein said realistic availability projection is based on one of historical interruption averages in conjunction with accepted reliability factors and planned actions in conjunction with accepted reliability factors.
Claim 14
Dependent Claim
40 words
The computer program product of claim 9, wherein said interruption factor comprises means to enable said processor to determine average frequency and duration of interruptions when a redundant path is not available as a temporary replacement for a working path.
Claim 15
Dependent Claim
128 words
The computer program product of claim 10, further comprising: means to enable said processor to determine projected availability based on historical interruption averages in conjunction with accepted reliability factors; means to enable said processor to gather applicable planned actions; means to enable said processor to determine frequency and interruption duration for said applicable planned actions; means for determining projected availability based on planned actions in conjunction with accepted reliability factor; means to enable said processor to output projected availability based on historical interruptions, if impact of historical interruptions greater than impact of planned actions; and means to enable said processor to output projected availability based on said planned actions and the historical impact of said planned actions, if impact of planned actions greater than impact of historical interruptions.