Claims Analysis
Total Claims: 17
Claim 1
Independent Claim
97 words
An erosion control block in the shape of a circular disk comprising a plurality of projecting members and recesses regularly spaced, alternately along the periphery of said disk at predetermined angular intervals, said alternating projecting members fitting into recesses in adjacent blocks for interlocking the blocks with the adjacent blocks adapted to form a stream erosion control barrier, wherein the width of said projecting member increases continuously with increasing the radial distance from the center of the block, and the width of said recess increases continuously with decreasing the radial distance from the center of the block.
Claim 2
Dependent Claim
97 words
An erosion control block in the shape of a circular disk comprising a plurality of projecting members and recesses regularly spaced, alternately along the periphery of said disk at predetermined angular intervals, said alternating projecting members fitting into recesses in adjacent blocks for interlocking the blocks with the adjacent blocks adapted to form a stream erosion control barrier, wherein the width of said projecting member increases continuously with increasing the radial distance from the center of the block, and the width of said recess increases continuously with decreasing the radial distance from the center of the block.
Claim 3
Dependent Claim
17 words
The block of claim 1 wherein the alternating recesses and projecting members are spaced 90 degrees apart.
Claim 4
Dependent Claim
22 words
A barrier made of a plurality of blocks in accordance with claim 2 wherein the blocks are arranged in a square pattern.
Claim 5
Dependent Claim
33 words
A barrier for controlling erosion of river banks comprising a plurality of interlocking blocks in accordance with claim 2 and a filter cloth adapted to be disposed between said blocks and the banks.
Claim 6
Dependent Claim
17 words
The block of claim 1 wherein the alternating recesses and projecting members are spaced 60 degrees apart.
Claim 7
Dependent Claim
27 words
The block of claim 5 further comprising a central opening having a diameter ranging from 25 percent to 40 percent of the diameter of the circular disk.
Claim 8
Dependent Claim
33 words
The barrier for controlling erosion of river banks comprising a plurality of interlocking blocks in accordance with claim 6 and a filter cloth adapted to be disposed between the blocks and the banks.
Claim 9
Dependent Claim
33 words
A barrier for controlling erosion of river banks comprising a plurality of interlocking blocks in accordance with claim 5 and a filter cloth adapted to be disposed between said blocks and the banks.
Claim 10
Dependent Claim
23 words
A barrier made of a plurality of blocks in accordance with claim 5 wherein the blocks are arranged in an equilateral triangular pattern.
Claim 11
Dependent Claim
30 words
The block of claim 1 having an opening at the center thereof, wherein the major dimension of the opening ranges from 25 to 40% of the diameter of the block.
Claim 12
Dependent Claim
33 words
A barrier for controlling erosion of river banks comprising a plurality of interlocking blocks in accordance with claim 6 and a filter cloth adapted to be disposed between said blocks and the banks.
Claim 13
Dependent Claim
23 words
A barrier made of a plurality of blocks in accordance with claim 10 further comprising means disposed thereon for tying the blocks together.
Claim 14
Dependent Claim
19 words
A barrier in accordance with claim 12 wherein the tying means includes eye hooks and steel concrete reinforcing rods.
Claim 15
Dependent Claim
8 words
The block of claim 1, made of cement.
Claim 16
Dependent Claim
9 words
The block of claim 1, made of fired clay.
Claim 17
Dependent Claim
33 words
A barrier for controlling erosion of river banks comprising a plurality of interlocking blocks in accordance with claim 1 and a filter cloth adapted to be disposed between said blocks and the banks.