Patent US5878032A successfully refreshed from Google Patents.
US5878032A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Delay monitoring of telecommunication networks
Assignee: RPX Clearinghouse LLC
•
Filing: 1997-11-07
•
Granted: 1999-03-02
•
Expires: 2017-11-07
Abstract
Abstract Novel techniques are disclosed for continuously monitoring parameters of delay between two nodes in a telecommunication network such as an ATM or frame relay network. The techniques use measurement cells, i.e. test cells, test frames, performance management ATM OAM cells, or performance management frame relay frames. These cells or frames contain a timestamp indicating the time a cell or frame is sent and a delay value indicating a difference between reception and transmission times of the cell or frame.
Inventors
- 👤 Beata Malgorzata Mirek
- 👤 Darren Frederick Toop
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-05 19:20
CPC Classifications
H; H04; H04Q; H04Q11/00; H04Q11/04; H04Q11/0428; H04Q11/0478; H04L; H04L12/00; H04L12/54; H04L12/56; H04L12/5601; H04L2012/5625; H04L2012/5628; H04L2012/5638; H04L2012/5646; H04L2012/5649; H04L2012/5652
Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
135 words
In a telecommunication network, a method of measuring delay parameters between node A and node B, comprising steps of: node A sending to node B a measurement cell containing timestamp value T1 indicating the time the measurement cell is sent, according to a clock at node A; node A receiving at time T4, according to the clock at node A a reporting measurement cell from node B, the reporting measurement cell containing the timestamp value T1 and a delay difference value Tb, wherein Tb=T3-T2, and T2 and T3 are respectively the time at which node B received the measurement cell from node A and the time at which node B sent the reporting measurement cell to node A, both according to a clock at node B; and calculating delay parameters using T1, T4 and Tb.
Claim 2
Dependent Claim
135 words
In a telecommunication network, a method of measuring delay parameters between node A and node B, comprising steps of: node A sending to node B a measurement cell containing timestamp value T1 indicating the time the measurement cell is sent, according to a clock at node A; node A receiving at time T4, according to the clock at node A a reporting measurement cell from node B, the reporting measurement cell containing the timestamp value T1 and a delay difference value Tb, wherein Tb=T3-T2, and T2 and T3 are respectively the time at which node B received the measurement cell from node A and the time at which node B sent the reporting measurement cell to node A, both according to a clock at node B; and calculating delay parameters using T1, T4 and Tb.
Claim 3
Dependent Claim
35 words
The method according to claim 1, wherein one of the delay parameters is a round trip delay RTD, the method further comprising a step of node A calculating the RTD by the following equation: RTD=(T4-T1)-Tb.
Claim 4
Dependent Claim
45 words
The method according to claim 2, wherein another of the delay parameters are a cell transfer delay CTD and a maximum cell transfer delay MCTD, the method further comprising a step of node A obtaining the parameters by the following equations: CTD=RTD/2, and MCTD=Max. RTD/2.
Claim 5
Dependent Claim
40 words
The method according to claim 1 wherein the measurement cell is a test cell or performance management OAM cell defined in the ATM standard, each measurement cell containing a timestamp and each reporting measurement cell further containing delay result field.
Claim 6
Dependent Claim
39 words
The method according to claim 1 wherein the telecommunication network is a frame relay network and the measurement cell is a measurement frame, each measurement frame containing a timestamp and each reporting measurement frame further containing delay result field.
Claim 7
Dependent Claim
40 words
The method according to claim 2 wherein the measurement cell is a test cell or performance management OAM cell defined in the ATM standard, each measurement cell containing a timestamp and each reporting measurement cell further containing delay result field.
Claim 8
Dependent Claim
39 words
The method according to claim 2 wherein the telecommunication network is a frame relay network and the measurement cell is a measurement frame, each measurement frame containing a timestamp and each reporting measurement frame further containing delay result field.
Claim 9
Dependent Claim
40 words
The method according to claim 3 wherein the measurement cell is a test cell or performance management OAM cell defined in the ATM standard, each measurement cell containing a timestamp and each reporting measurement cell further containing delay result field.
Claim 10
Dependent Claim
39 words
The method according to claim 3 wherein the telecommunication network is a frame relay network and the measurement cell is a measurement frame, each measurement frame containing a timestamp and each reporting measurement frame further containing delay result field.
References Cited (Backward Citations)
US5450394A
Cited
US5777988A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 2002-03-01 | 2002-08-31 | 2003-03-02 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2006-03-01 | 2006-08-31 | 2007-03-02 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2010-03-01 | 2010-08-31 | 2011-03-02 | $7700.00 | Window Closed / Lapsed |