← Back to Patent Explorer
US5812389A Expired / Lapsed US ⏱️ 0.0 years remaining

Power distribution control system

Assignee: Hitachi Ltd
•
Filing: 1995-06-05
•
Granted: 1998-09-22
•
Expires: 2015-06-05
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An information processing system comprises a plurality of systems (1, 3, 4, 6) communicating through a transmission path (2) and performing a processing base on their own function. One of the plurality of systems acts as as an supervising system having a supervising function. The supervising system (1, 4) sets a goal for each of the plurality of systems, collects the processing result on each system and evaluates the processing result; and on the basis of the processing result, the supervising system sets a new goal for each system considering a goal of the entire system comprising said plurality of systems.

Inventors

  • 👤 Yasunori Katayama
  • 👤 Junzo Kawakami
  • 👤 Hiroyuki Kudo
  • 👤 Yoshiki Hirakouchi
  • 👤 Hiroaki Ishikawa

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-06 16:17
CPC Classifications
G; G05; G05B; G05B13/00; G05B19/00; G05B19/02; G05B19/04; G05B19/042; G05B19/0421; B; B21; B21B; B21B37/00; G05B13/02; G05B13/0265; G05B13/028; G05B23/00; G05B23/02; G05B23/0205; G05B23/0259; G05B23/0286; G05B23/0294; B21B37/16; G05B2219/00; G05B2219/20; G05B2219/22; G05B2219/2234; G05B2219/2238; G05B2219/24; G05B2219/24216; Y; Y02; Y02B; Y02B70/00; Y02B70/30; Y02P; Y02P90/00; Y02P90/80; Y04; Y04S; Y04S20/00; Y04S20/20

Claims Analysis

Total Claims: 3
Claim 1
Independent Claim 141 words
A power distribution route control system comprising a plurality of control devices dispersed in the power distribution route, each control device collections and processing information in the power distribution route and providing a control command for said power distribution route to the other control devices, wherein when a first state in the power distribution route changes, the control device having first detected the first state change offers said control command to the other control devices and when a second state change occurs, after said first state change has occurred and at a point other than a point of the power distribution route where the first state change has occurred, the control device which first detects the second state change among the control devices in a neighborhood where the second state change occurs offers the control command to the other control devices.
Claim 2
Dependent Claim 141 words
A power distribution route control system comprising a plurality of control devices dispersed in the power distribution route, each control device collections and processing information in the power distribution route and providing a control command for said power distribution route to the other control devices, wherein when a first state in the power distribution route changes, the control device having first detected the first state change offers said control command to the other control devices and when a second state change occurs, after said first state change has occurred and at a point other than a point of the power distribution route where the first state change has occurred, the control device which first detects the second state change among the control devices in a neighborhood where the second state change occurs offers the control command to the other control devices.
Claim 3
Dependent Claim 40 words
A power distribution route control system according to claim 1, wherein at least one of a voltage, a current, a phase, a switching state in a switch, and information of a failure point is transferred via said power distribution route.

References Cited (Backward Citations)

US4250489A Cited
US4347564A Cited
JPS5611353A Cited
JPS5640344A Cited
US4530045A Cited
US4427968A Cited
US4581701A Cited
US4823256A Cited
JPS62177462A Cited
US4982340A Cited
US5021938A Cited
US5329579A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2001-09-21 2002-03-23 2002-09-22 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2005-09-21 2006-03-23 2006-09-22 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2009-09-21 2010-03-23 2010-09-22 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag