Patent US5790634A successfully refreshed from Google Patents.
← Back to Patent Explorer
US5790634A Expired / Lapsed US ⏱️ 0.0 years remaining

Combination system for proactively and reactively maintaining telephone network facilities in a public switched telephone system

Assignee: Verizon Patent and Licensing Inc
•
Filing: 1996-11-29
•
Granted: 1998-08-04
•
Expires: 2016-11-29
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In an administration system for a public switched telephone network, a combination proactive and reactive maintenance system analyzes the working status of customer network facilities in response to a customer request reporting a customer trouble. The combined maintenance system includes an attendant station receiving the customer request representing a reactively determined trouble, and building a first trouble report, and first and second test systems. The first test system tests a second communication line in the communication cable representing a potentially proactively determined trouble, and builds a second trouble report. The second test system tests at least one of the first and second communication lines and determines whether at least one of the first and second trouble reports should be dispatched to a customer work group together with existing related proactive and reactive trouble reports to the customer work group using trouble routing criteria. The combination system also includes a data processor that generates an end to end description of the first and second communication lines to be tested, and a dispatch system that groups related open work requests with at least one of the first and second trouble reports and the existing related reactive and proactive trouble reports based on grouping rules.

Inventors

  • 👤 James C. Kinser, Jr.
  • 👤 William C. Casey
  • 👤 Frederick D. Blum
  • 👤 Mary A. Youngs

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 21:22
CPC Classifications
H; H04; H04M; H04M3/00; H04M3/08; H04M3/22; H04M3/2254; H04Q; H04Q3/00; H04Q3/0016; H04Q3/0062; H04Q3/0075; H04Q2213/00; H04Q2213/13521

Claims Analysis

Total Claims: 28
Claim 1
Independent Claim 746 words
In an administration system for a public switched telephone network which includes an attendant station for receiving service requests and collecting customer information, credit verification service order processor (SOP) for creating and distributing service orders for processing by downstream processing systems such as Service Order Analysis and Control (SOAC) system, a Computer System for Mainframe Operations (COSMOS) system, SWITCH system, Loop Facility Assignment and Control System (LFACS) system, and Adjunct Processor (AP) having storage for storing data including Living Unit (LU) data, network facility data and Telephone Number (TN) data, a first test system testing a communication line in a communication cable associated with the customer in accordance with a first test producing trouble indicators indicating a potentially defective communication line, a second test system testing groups of the trouble indicators associated with the communication line in accordance with a second test, and a data processor generating an end to end description of the communication line to be tested, prioritizing the groups that are potentially defective indicating the potentially defective communication line generating prioritized groups, and generating a report to be used for examining the potentially defective communication line using the prioritized groups, a method of proactively and reactively analyzing the working status of customer network facilities in response to a customer request reporting a customer trouble, comprising the steps of: (a) receiving the customer request; (b) retrieving related customer profile information including at least one of billing, service order, circuit test history, and trouble history; (c) obtaining a description of the customer trouble and entering a trouble type associated therewith; (d) building a trouble report; (e) testing the communication line and generating test results; (f) determining, responsive to first criteria, whether additional information is needed, or whether the trouble report can be closed out, or whether the trouble report should be dispatched to a customer work group, and if so, transmitting the trouble report for review by the customer work group; (g) transmitting the trouble report to the customer work group using trouble routing criteria, mapping the trouble report to a maintenance area, determining a trouble priority, and assigning a trouble report status; (h) grouping at least one of related open work requests and proactively determined troubles with the trouble report based on grouping rules including similarity of trouble, similarity of geographic area, and available time, the proactively determined troubles being determined in accordance with the following steps: (h1) performing a first level test of the communication line in the communication cable associated with the customer producing trouble indicators indicating a potentially defective communication line; (h2) filtering the trouble indicators from predetermined communication services associated with the communication line that provide potentially false trouble indicators producing filtered trouble indicators; (h3) generating a list of the filtered trouble indicators to be considered when determining whether the communication line is potentially defective; (h4) generating an end to end description of the communication line to be tested; (h5) grouping the filtered trouble indicators that have common network elements in groups; (h6) prioritizing the groups for performing a second level test of the communication line; (h7) testing the groups prioritized for the communication line; (h8) discarding the groups that are in a satisfactory status responsive to predetermined criteria; (h9) prioritizing the groups that are potentially defective indicating the potentially defective communication line generating prioritized groups of the proactively determined troubles; (i) building a work load for a technician responsive to the related open work requests, the trouble report, the proactively determined troubles and technician information including work schedule, job type, work areas, and job skills; (j) accessing information stored in operation support systems including at least one of the SOP, the SOAC system, the COSMOS system, the SWITCH system, the LFACS system, the AP, the first test system, the second test system, and the data processor as needed; (k) repairing and testing the communication line associated with the trouble report to verify that the communication line is working; (1) notifying the customer that the trouble report has been resolved and the trouble is closed out; (m) resolving the at least one of the related open work requests and the proactively determined troubles; (n) generating a completion message responsive to said repairing step (k) and said resolving step (m); and (o) transmitting the completion message to at least one of the SOP, the SOAC system, the COSMOS system, the SWITCH system, the LFACS system, the AP, the first test system, the second test system, and the data processor as needed.
Claim 2
Dependent Claim 746 words
In an administration system for a public switched telephone network which includes an attendant station for receiving service requests and collecting customer information, credit verification service order processor (SOP) for creating and distributing service orders for processing by downstream processing systems such as Service Order Analysis and Control (SOAC) system, a Computer System for Mainframe Operations (COSMOS) system, SWITCH system, Loop Facility Assignment and Control System (LFACS) system, and Adjunct Processor (AP) having storage for storing data including Living Unit (LU) data, network facility data and Telephone Number (TN) data, a first test system testing a communication line in a communication cable associated with the customer in accordance with a first test producing trouble indicators indicating a potentially defective communication line, a second test system testing groups of the trouble indicators associated with the communication line in accordance with a second test, and a data processor generating an end to end description of the communication line to be tested, prioritizing the groups that are potentially defective indicating the potentially defective communication line generating prioritized groups, and generating a report to be used for examining the potentially defective communication line using the prioritized groups, a method of proactively and reactively analyzing the working status of customer network facilities in response to a customer request reporting a customer trouble, comprising the steps of: (a) receiving the customer request; (b) retrieving related customer profile information including at least one of billing, service order, circuit test history, and trouble history; (c) obtaining a description of the customer trouble and entering a trouble type associated therewith; (d) building a trouble report; (e) testing the communication line and generating test results; (f) determining, responsive to first criteria, whether additional information is needed, or whether the trouble report can be closed out, or whether the trouble report should be dispatched to a customer work group, and if so, transmitting the trouble report for review by the customer work group; (g) transmitting the trouble report to the customer work group using trouble routing criteria, mapping the trouble report to a maintenance area, determining a trouble priority, and assigning a trouble report status; (h) grouping at least one of related open work requests and proactively determined troubles with the trouble report based on grouping rules including similarity of trouble, similarity of geographic area, and available time, the proactively determined troubles being determined in accordance with the following steps: (h1) performing a first level test of the communication line in the communication cable associated with the customer producing trouble indicators indicating a potentially defective communication line; (h2) filtering the trouble indicators from predetermined communication services associated with the communication line that provide potentially false trouble indicators producing filtered trouble indicators; (h3) generating a list of the filtered trouble indicators to be considered when determining whether the communication line is potentially defective; (h4) generating an end to end description of the communication line to be tested; (h5) grouping the filtered trouble indicators that have common network elements in groups; (h6) prioritizing the groups for performing a second level test of the communication line; (h7) testing the groups prioritized for the communication line; (h8) discarding the groups that are in a satisfactory status responsive to predetermined criteria; (h9) prioritizing the groups that are potentially defective indicating the potentially defective communication line generating prioritized groups of the proactively determined troubles; (i) building a work load for a technician responsive to the related open work requests, the trouble report, the proactively determined troubles and technician information including work schedule, job type, work areas, and job skills; (j) accessing information stored in operation support systems including at least one of the SOP, the SOAC system, the COSMOS system, the SWITCH system, the LFACS system, the AP, the first test system, the second test system, and the data processor as needed; (k) repairing and testing the communication line associated with the trouble report to verify that the communication line is working; (1) notifying the customer that the trouble report has been resolved and the trouble is closed out; (m) resolving the at least one of the related open work requests and the proactively determined troubles; (n) generating a completion message responsive to said repairing step (k) and said resolving step (m); and (o) transmitting the completion message to at least one of the SOP, the SOAC system, the COSMOS system, the SWITCH system, the LFACS system, the AP, the first test system, the second test system, and the data processor as needed.
Claim 3
Dependent Claim 94 words
A method of proactively and reactively analyzing the working status of customer network facilities according to claim 1, wherein said testing step (e) further comprises the step of performing a test of the communication line producing additional trouble indicators, at least one of the trouble indicators and the additional trouble indicators including at least one of: (e1) a per call test failure (PCTF) indicator; (e2) an automatic line insulation test indicator; (e3) a customer trouble report including a mechanized loop test indicator; (e4) an employee report indicator; and (e5) a fiber network type indicator.
Claim 4
Dependent Claim 110 words
A method of proactively and reactively analyzing the working status of customer network facilities according to claim 2, wherein said testing step (e) further comprises the step of filtering the additional trouble indicators generating a list of additional potentially false trouble indicators associated with the communication line, at least one of the potentially false trouble indicators and the additional potentially false trouble indicators including at least one of: a ground start PBX; a foreign exchange line; a coin line; a video on demand line; a pair gain system without mechanized loop test or automatic line insulation test capabilities; a multiple indicator at same address; and a known station problem list.
Claim 5
Dependent Claim 63 words
A method of proactively and reactively analyzing the working status of customer network facilities according to claim 1, wherein at least one of said testing step (e) and generating step (h4) further comprises the step of generating an end to end description of the communication line for each communication line to be tested including all cables, pairs, and terminals in the communication line.
Claim 6
Dependent Claim 97 words
A method of proactively and reactively analyzing the working status of customer network facilities according to claim 2, wherein said grouping step (h) further comprises the step of grouping the trouble indicators that have common network elements including at least one of: F1 terminal; F2 terminals with same F1 terminal; F2 terminals with multiple F1 terminals; F1 terminal cable and pair range; F1 terminal in binding post range; F1 terminal out binding post range; F2 terminal cable and pair range; F2 terminal in binding post range; F2 terminal out binding post range; and fiber network common elements.
Claim 7
Dependent Claim 32 words
A method of proactively and reactively analyzing the working status of customer network facilities according to claim 1, wherein the work requests are one of stapled and linked to the trouble report.
Claim 8
Dependent Claim 71 words
A method of proactively and reactively analyzing the working status of customer network facilities according to claim 1, wherein said grouping step (h) further comprises the step of prioritizing the groups that are potentially defective indicating the potentially defective communication line using at least one of: additional weighting for low spare pair cable segments, and a dispatch list prioritizing the potentially defective communication line by dispatch area, available time and priority.
Claim 9
Dependent Claim 64 words
A method of proactively and reactively analyzing the working status of customer network facilities according to claim 1, wherein said determining step (f) further comprises the step of determining whether the trouble report should be dispatched to a customer work group responsive to related information regarding similar and related troubles that have been experienced contemporaneously with other network facilities related to the communication line.
Claim 10
Dependent Claim 65 words
A method of proactively and reactively analyzing the working status of customer network facilities according to claim 1, wherein said determining step (f) further comprises the step of determining whether the trouble report should be dispatched to a customer work group responsive to related proactive and reactive troubles that have been experienced contemporaneously by other customers on other communication lines related to the communication line.
Claim 11
Dependent Claim 54 words
A method of proactively and reactively analyzing the working status of customer network facilities according to claim 1, wherein said determining step (f) further comprises the step of determining whether the trouble report should be dispatched to a customer work group responsive to baseline information of the communication line accessed on a real-time basis.
Claim 12
Dependent Claim 47 words
A method of proactively and reactively analyzing the working status of customer network facilities according to claim 1, further comprising the step of informing technicians that have already been dispatched to repair a defective network facility to repair other related troubles in the substantially same geographic area.
Claim 13
Dependent Claim 531 words
In an administration system for a public switched telephone network which includes an attendant station for receiving service requests and collecting customer information, credit verification service order processor (SOP) for creating and distributing service orders for processing by downstream processing systems such as Service Order Analysis and Control (SOAC) system, a Computer System for Mainframe Operations (COSMOS) system, SWITCH system, Loop Facility Assignment and Control System (LFACS) system, and Adjunct Processor (AP) having storage for storing data including Living Unit (LU) data, network facility data and Telephone Number (TN) data, a combination proactive and reactive maintenance system for analyzing the working status of customer network facilities in response to a customer request reporting a customer trouble, comprising: an attendant station receiving the customer request, retrieving related customer profile information, obtaining a description of the customer trouble and entering a trouble type associated therewith corresponding to a first communication line representing a reactively determined trouble, and building a first trouble report; a first test system testing a second communication line in the communication cable associated with the customer producing trouble indicators indicating a potentially defective first communication line representing a potentially proactively determined trouble, and building a second trouble report; a second test system, responsively connected to said first test system and to said attendant station, said second test system testing groups of the trouble indicators associated with the second communication line, testing the first communication line associated with the trouble report and generating test results, and determining, responsive to criteria, whether additional information is needed, or whether at least one of the first and second trouble reports can be closed out, or whether at least one of the first and second trouble reports should be dispatched to a customer work group, and if so, transmitting the at least one of the first and second trouble reports for review by the customer work group and existing related proactive and reactive trouble reports to the customer work group using trouble routing criteria; a data processor, operatively connected to said first and second test systems, filtering the trouble indicators received from said first test system from predetermined communication services associated with the communication line that provide potentially false trouble indicators producing filtered trouble indicators, generating a list of the filtered trouble indicators to be considered when determining whether the communication line is potentially defective, generating an end to end description of the communication line to be tested, wherein said data processor discards the groups tested by said second test system that are in a satisfactory status, prioritizes the groups that are potentially defective indicating the potentially defective communication line generating prioritized groups, and generates a report to be used for examining the potentially defective communication line using the prioritized groups to determine whether the potentially proactively determined troubles are considered proactively determined troubles; and a work request processing and dispatch system, responsively connected to said attendant station, grouping related open work requests with at least one of the first and second trouble reports and the existing related reactive and proactive trouble reports based on grouping rules including similarity of trouble, similarity of geographic area, and available time, building a work load for a technician.
Claim 14
Dependent Claim 531 words
In an administration system for a public switched telephone network which includes an attendant station for receiving service requests and collecting customer information, credit verification service order processor (SOP) for creating and distributing service orders for processing by downstream processing systems such as Service Order Analysis and Control (SOAC) system, a Computer System for Mainframe Operations (COSMOS) system, SWITCH system, Loop Facility Assignment and Control System (LFACS) system, and Adjunct Processor (AP) having storage for storing data including Living Unit (LU) data, network facility data and Telephone Number (TN) data, a combination proactive and reactive maintenance system for analyzing the working status of customer network facilities in response to a customer request reporting a customer trouble, comprising: an attendant station receiving the customer request, retrieving related customer profile information, obtaining a description of the customer trouble and entering a trouble type associated therewith corresponding to a first communication line representing a reactively determined trouble, and building a first trouble report; a first test system testing a second communication line in the communication cable associated with the customer producing trouble indicators indicating a potentially defective first communication line representing a potentially proactively determined trouble, and building a second trouble report; a second test system, responsively connected to said first test system and to said attendant station, said second test system testing groups of the trouble indicators associated with the second communication line, testing the first communication line associated with the trouble report and generating test results, and determining, responsive to criteria, whether additional information is needed, or whether at least one of the first and second trouble reports can be closed out, or whether at least one of the first and second trouble reports should be dispatched to a customer work group, and if so, transmitting the at least one of the first and second trouble reports for review by the customer work group and existing related proactive and reactive trouble reports to the customer work group using trouble routing criteria; a data processor, operatively connected to said first and second test systems, filtering the trouble indicators received from said first test system from predetermined communication services associated with the communication line that provide potentially false trouble indicators producing filtered trouble indicators, generating a list of the filtered trouble indicators to be considered when determining whether the communication line is potentially defective, generating an end to end description of the communication line to be tested, wherein said data processor discards the groups tested by said second test system that are in a satisfactory status, prioritizes the groups that are potentially defective indicating the potentially defective communication line generating prioritized groups, and generates a report to be used for examining the potentially defective communication line using the prioritized groups to determine whether the potentially proactively determined troubles are considered proactively determined troubles; and a work request processing and dispatch system, responsively connected to said attendant station, grouping related open work requests with at least one of the first and second trouble reports and the existing related reactive and proactive trouble reports based on grouping rules including similarity of trouble, similarity of geographic area, and available time, building a work load for a technician.
Claim 15
Dependent Claim 93 words
A combination proactive and reactive maintenance system analyzing the working status of customer network facilities according to claim 12, wherein said second test system performs a test of at least one of the first and second communication lines producing additional trouble indicators, the trouble indicators and the additional trouble indicators including at least one of: (e1) a per call test failure (PCTF) indicator; (e2) an automatic line insulation test indicator; (e3) a customer trouble report including a mechanized loop test indicator; (e4) an employee report indicator; and (e5) a fiber network type indicator.
Claim 16
Dependent Claim 108 words
A combination proactive and reactive maintenance system analyzing the working status of customer network facilities according to claim 13, wherein said second test system filters the additional trouble indicators generating a list of additional potentially false trouble indicators associated with at least one of the first and second the communication lines, the trouble indicators and the additional potentially false trouble indicators including at least one of: a ground start PBX; a foreign exchange line; a coin line; a video on demand line; a pair gain system without mechanized loop test or automatic line insulation test capabilities; a multiple indicator at same address; and a known station problem list.
Claim 17
Dependent Claim 51 words
A combination proactive and reactive maintenance system analyzing the working status of customer network facilities according to claim 12, wherein said second test system generates an end to end description of the communication line for each communication line to be tested including all cables, pairs, and terminals in the communication line.
Claim 18
Dependent Claim 105 words
A combination proactive and reactive maintenance system analyzing the working status of customer network facilities according to claim 13, wherein said work request processing and dispatch system groups at least one of the trouble indicators and the additional trouble indicators that have common network elements including at least one of: F1 terminal; F2 terminals with same F1 terminal; F2 terminals with multiple F1 terminals; F1 terminal cable and pair range; F1 terminal in binding post range; F1 terminal out binding post range; F2 terminal cable and pair range; F2 terminal in binding post range; F2 terminal out binding post range; and fiber network common elements.
Claim 19
Dependent Claim 40 words
A combination proactive and reactive maintenance system analyzing the working status of customer network facilities according to claim 12, wherein the work requests are one of stapled and linked to at least one of the first and second trouble reports.
Claim 20
Dependent Claim 79 words
A combination proactive and reactive maintenance system analyzing the working status of customer network facilities according to claim 12, wherein said work request processing and dispatch system prioritizes the groups that are potentially defective indicating that at least one of the first and second communication lines are potentially defective using at least one of: additional weighting for low spare pair cable segments, and a dispatch list prioritizing the potentially defective communication line by dispatch area, available time and priority.
Claim 21
Dependent Claim 76 words
A combination proactive and reactive maintenance system analyzing the working status of customer network facilities according to claim 12, wherein using at least one of said first and second test systems, a caseworker determines whether the trouble report should be dispatched to a customer work group responsive to related information regarding similar and related troubles that have been experienced contemporaneously with other network facilities related to at least one of the first and second communication lines.
Claim 22
Dependent Claim 77 words
A combination proactive and reactive maintenance system analyzing the working status of customer network facilities according to claim 12, wherein using at least one of said first and second test systems, a caseworker determines whether the trouble report should be dispatched to a customer work group responsive to related proactive and reactive troubles that have been experienced contemporaneously by other customers on other communication lines related to at least one of the first and second communication lines.
Claim 23
Dependent Claim 66 words
A combination proactive and reactive maintenance system analyzing the working status of customer network facilities according to claim 12, wherein using at least one of said first and second test systems, a caseworker determines whether the trouble report should be dispatched to a customer work group responsive to baseline information of at least one of the first and second communication lines accessed on a real-time basis.
Claim 24
Dependent Claim 46 words
A combination proactive and reactive maintenance system analyzing the working status of customer network facilities according to claim 12, wherein a caseworker informs technicians that have already been dispatched to repair a defective network facility to repair other related troubles in the substantially same geographic area.
Claim 25
Dependent Claim 456 words
In an administration system for a public switched telephone network which includes an attendant station for receiving service requests and collecting customer information, credit verification, service order processor (SOP) for creating and distributing service orders for processing by downstream processing systems such as Service Order Analysis and Control (SOAC) system, a Computer System for Mainframe Operations (COSMOS) system, SWITCH system, Loop Facility Assignment and Control System (LFACS) system, and Adjunct Processor (AP) having storage for storing data including Living Unit (LU) data, network facility data and Telephone Number (TN) data, a first test system testing a communication line in a communication cable associated with the customer in accordance with a first test producing trouble indicators indicating a potentially defective communication line, a second test system testing groups of the trouble indicators associated with the communication line in accordance with a second test, and a data processor generating an end to end description of the communication line to be tested, prioritizing the groups that are potentially defective indicating the potentially defective communication line generating prioritized groups, and generating a report to be used for examining the potentially defective communication line using the prioritized groups, a method of proactively and reactively analyzing the working status of customer network facilities in response to a customer request reporting a customer trouble, comprising the steps of: (a) receiving the customer request; (b) retrieving related customer profile information; (c) obtaining a description of the customer trouble and entering a trouble type associated therewith; (d) building a trouble report; (e) testing the communication line and generating test results; (f) determining, responsive to criteria, whether additional information is needed, or whether the trouble report can be closed out, or whether the trouble report should be dispatched to a customer work group, and if so, transmitting the trouble report for review by the customer work group using trouble routing criteria; (g) grouping related open work requests and proactively determined troubles with the trouble report based on grouping rules including at least one of similarity of trouble, similarity of geographic area, and available time, the proactively determined troubles being determined in accordance with the following steps: (g1) performing a first level test of the communication line in the communication cable associated with the customer producing trouble indicators indicating a potentially defective communication line; (g2) generating an end to end description of the potentially defective communication line; (g3) performing a second level test of the potentially defective communication line to identify whether the potentially defective communication line contains the proactively determined troubles; (h) building a work load for a technician responsive to the related open work requests, the trouble report, the proactively determined troubles and technician information including work schedule, job type, work areas, and job skills.
Claim 26
Dependent Claim 456 words
In an administration system for a public switched telephone network which includes an attendant station for receiving service requests and collecting customer information, credit verification, service order processor (SOP) for creating and distributing service orders for processing by downstream processing systems such as Service Order Analysis and Control (SOAC) system, a Computer System for Mainframe Operations (COSMOS) system, SWITCH system, Loop Facility Assignment and Control System (LFACS) system, and Adjunct Processor (AP) having storage for storing data including Living Unit (LU) data, network facility data and Telephone Number (TN) data, a first test system testing a communication line in a communication cable associated with the customer in accordance with a first test producing trouble indicators indicating a potentially defective communication line, a second test system testing groups of the trouble indicators associated with the communication line in accordance with a second test, and a data processor generating an end to end description of the communication line to be tested, prioritizing the groups that are potentially defective indicating the potentially defective communication line generating prioritized groups, and generating a report to be used for examining the potentially defective communication line using the prioritized groups, a method of proactively and reactively analyzing the working status of customer network facilities in response to a customer request reporting a customer trouble, comprising the steps of: (a) receiving the customer request; (b) retrieving related customer profile information; (c) obtaining a description of the customer trouble and entering a trouble type associated therewith; (d) building a trouble report; (e) testing the communication line and generating test results; (f) determining, responsive to criteria, whether additional information is needed, or whether the trouble report can be closed out, or whether the trouble report should be dispatched to a customer work group, and if so, transmitting the trouble report for review by the customer work group using trouble routing criteria; (g) grouping related open work requests and proactively determined troubles with the trouble report based on grouping rules including at least one of similarity of trouble, similarity of geographic area, and available time, the proactively determined troubles being determined in accordance with the following steps: (g1) performing a first level test of the communication line in the communication cable associated with the customer producing trouble indicators indicating a potentially defective communication line; (g2) generating an end to end description of the potentially defective communication line; (g3) performing a second level test of the potentially defective communication line to identify whether the potentially defective communication line contains the proactively determined troubles; (h) building a work load for a technician responsive to the related open work requests, the trouble report, the proactively determined troubles and technician information including work schedule, job type, work areas, and job skills.
Claim 27
Dependent Claim 427 words
In an administration system for a public switched telephone network which includes an attendant station for receiving service requests and collecting customer information, credit verification service order processor (SOP) for creating and distributing service orders for processing by downstream processing systems such as Service Order Analysis and Control (SOAC) system, a Computer System for Mainframe Operations (COSMOS) system, SWITCH system, Loop Facility Assignment and Control System (LFACS) system, and Adjunct Processor (AP) having storage for storing data including Living Unit (LU) data, network facility data and Telephone Number (TN) data, a combination proactive and reactive maintenance system for analyzing the working status of customer network facilities in response to a customer request reporting a customer trouble, comprising: an attendant station receiving the customer request, retrieving related customer profile information, obtaining a description of the customer trouble and entering a trouble type associated therewith corresponding to a first communication line representing a reactively determined trouble, and building a first trouble report; a first test system testing a second communication line in the communication cable associated with the customer producing trouble indicators indicating a potentially defective first communication line representing a potentially proactively determined trouble, and building a second trouble report; a second test system, responsively connected to said first test system and to said attendant station, said second test system testing at least one of the first and second communication lines and determining, responsive to criteria, whether at least one of the first and second trouble reports should be dispatched to a customer work group, and if so, transmitting the at least one of the first and second trouble reports for review by the customer work group together with existing related proactive and reactive trouble reports to the customer work group using trouble routing criteria; a data processor, operatively connected to said first and second test systems, generating an end to end description of the at least one of the first and second communication lines to be tested by said second test system responsive to the reactively determined trouble and the potentially proactively determined trouble to determine whether the at least one of the first and second communication lines require at least one of inspection and repair; and a work request processing and dispatch system, responsively connected to said attendant station, grouping related open work requests with at least one of the first and second trouble reports and the existing related reactive and proactive trouble reports based on grouping rules including similarity of trouble, similarity of geographic area, and available time, building a work load for a technician.
Claim 28
Dependent Claim 427 words
In an administration system for a public switched telephone network which includes an attendant station for receiving service requests and collecting customer information, credit verification service order processor (SOP) for creating and distributing service orders for processing by downstream processing systems such as Service Order Analysis and Control (SOAC) system, a Computer System for Mainframe Operations (COSMOS) system, SWITCH system, Loop Facility Assignment and Control System (LFACS) system, and Adjunct Processor (AP) having storage for storing data including Living Unit (LU) data, network facility data and Telephone Number (TN) data, a combination proactive and reactive maintenance system for analyzing the working status of customer network facilities in response to a customer request reporting a customer trouble, comprising: an attendant station receiving the customer request, retrieving related customer profile information, obtaining a description of the customer trouble and entering a trouble type associated therewith corresponding to a first communication line representing a reactively determined trouble, and building a first trouble report; a first test system testing a second communication line in the communication cable associated with the customer producing trouble indicators indicating a potentially defective first communication line representing a potentially proactively determined trouble, and building a second trouble report; a second test system, responsively connected to said first test system and to said attendant station, said second test system testing at least one of the first and second communication lines and determining, responsive to criteria, whether at least one of the first and second trouble reports should be dispatched to a customer work group, and if so, transmitting the at least one of the first and second trouble reports for review by the customer work group together with existing related proactive and reactive trouble reports to the customer work group using trouble routing criteria; a data processor, operatively connected to said first and second test systems, generating an end to end description of the at least one of the first and second communication lines to be tested by said second test system responsive to the reactively determined trouble and the potentially proactively determined trouble to determine whether the at least one of the first and second communication lines require at least one of inspection and repair; and a work request processing and dispatch system, responsively connected to said attendant station, grouping related open work requests with at least one of the first and second trouble reports and the existing related reactive and proactive trouble reports based on grouping rules including similarity of trouble, similarity of geographic area, and available time, building a work load for a technician.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2001-08-03 2002-02-02 2002-08-04 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2005-08-03 2006-02-02 2006-08-04 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2009-08-03 2010-02-02 2010-08-04 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag