Sludge treatment tank thereof construction method thereof
Assignee: Zenitaka Corp
•
Filing: 1997-06-16
•
Granted: 1998-06-02
•
Expires: 2017-06-16
Abstract
Abstract In a sludge treatment tank, members made of a glass long-fiber reinforced foamed plastic composite material are used as formworks in construction and then left as an inside wall member. The composite material functions as formworks in a construction method as well as applies an insulating property and a corrosion resistant property to the sludge treatment tank and further realizes labor saving in a field of construction works, the provision of a good working environment and the reduction of a period of construction work.
Inventors
- 👤 Keitaro Aoyagi
- 👤 Sadao Niibe
- 👤 Toshitomi Umegae
- 👤 Hideo Iwai
- 👤 Yoshitugu Oshima
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-07 11:28
CPC Classifications
C; C02; C02F; C02F11/00; B; B29; B29C; B29C70/00; B32; B32B; B32B33/00; C12; C12M; C12M21/00; C12M21/04; C12M23/00; C12M23/20; E; E03; E03F; E03F11/00; E04; E04H; E04H7/00; E04H7/02; E04H7/18; B29K; B29K2309/00; B29K2309/08; Y; Y02; Y02A; Y02A20/00; Y02A20/20; Y02A20/208; Y02E; Y02E50/00; Y02E50/30; Y02W; Y02W10/00; Y02W10/10
Claims Analysis
Total Claims: 6
Claim 1
Independent Claim
48 words
In a method of constructing a concrete sludge treatment tank, an improvement comprising the step of using a member composed of a glass long-fiber reinforced foamed plastic composite material as an inside formworks of inside and outside formworks used to place concrete to said concrete sludge treatment tank.
Claim 2
Dependent Claim
48 words
In a method of constructing a concrete sludge treatment tank, an improvement comprising the step of using a member composed of a glass long-fiber reinforced foamed plastic composite material as an inside formworks of inside and outside formworks used to place concrete to said concrete sludge treatment tank.
Claim 3
Dependent Claim
34 words
A method of constructing a sludge treatment tank according to claim 1, wherein said inside formwork is used as an inside wall member of said sludge treatment tank after said concrete has been placed.
Claim 4
Dependent Claim
59 words
A method of constructing a sludge treatment tank according to claim 1, wherein said sludge treatment tank has any one of an egg-shaped longitudinal cross sectional shape and a hexagon-shaped longitudinal cross sectional shape, an upper portion and a lower portion thereof are formed to a substantially conical shape and a barrel thereof is formed to a cylindrical shape.
Claim 5
Dependent Claim
31 words
A method of constructing a sludge treatment tank according to claim 1, wherein said inside formworks are previously made to a predetermined shape in a factory and fabricated in a field.
Claim 6
Dependent Claim
49 words
A method of constructing a sludge treatment tank according to claim 1, wherein lower inside formworks of said sludge treatment tank are fabricated in the field, and the thus fabricated inside formworks is filled with any of water or sewage treated water to prevent said inside formworks from floating.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 2001-06-01 | 2001-12-01 | 2002-06-02 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2005-06-01 | 2005-12-01 | 2006-06-02 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2009-06-01 | 2009-12-01 | 2010-06-02 | $7700.00 | Window Closed / Lapsed |