← Back to Patent Explorer
US5751574A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for loading software in communication systems with non-redundant, decentralized equipment

Assignee: Nokia Solutions and Networks GmbH and Co KG
•
Filing: 1996-09-10
•
Granted: 1998-05-12
•
Expires: 2016-09-10
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In a method for loading software in communication systems with non-redundant, decentralized equipment so that the availability of a communication system for the connected subscribers remains assured during the loading process of programs and data, there is a requirement to maintain switching operations during the loading process. Given the presence of V5.2 interfaces, the loading occurs such that the V5.2 communication channels are first rerouted onto the redundant system half. During this time, the new software can then be loaded into the other system half. When the loading into this system half is concluded, then it is placed in operation and all V5.2 communication channels are routed onto this system half. The new software can then be loaded into the remaining system half.

Inventors

  • 👤 Norbert Loebig

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 02:53
CPC Classifications
H; H04; H04Q; H04Q11/00; H04Q11/04; H04Q11/0407; H04Q2213/00; H04Q2213/1302; H04Q2213/1304; H04Q2213/1305; H04Q2213/13166; H04Q2213/13167; H04Q2213/13209; H04Q2213/13292

Claims Analysis

Total Claims: 15
Claim 1
Independent Claim 259 words
A method for loading software into a communication system which is connected to at least one subscriber line network and wherein the communication system is formed of first and second system halves with the second system half being redundant to the first system half, comprising the steps of: providing each of the first and second system halves with a plurality of non-redundant peripheral equipment units operating in non-redundant manner, the peripheral equipment units each connecting equipment in both of the respective system halves to the at least one subscriber line network via defined interfaces, the defined interfaces providing communication channels for carrying useful data and also being available for changeover to standby; placing the first system half with its associated peripheral equipment units into a defined initial condition by changing communication channels after they are finished carrying useful data in the first system half over to standby and then rerouting them over to the second system half; loading software into the first system half which had been placed into the defined initial condition, and including loading the software into the respective peripheral equipment units of the first system half; after loading of the software into the first system half is completed, placing the communication channels in the second system half in standby and then rerouting them over to the first system half already loaded with the software; then loading software into the second system half including into the respective peripheral equipment units of the second system half; and thereafter restoring redundant operation of the first and second system halves.
Claim 2
Independent Claim 259 words
A method for loading software into a communication system which is connected to at least one subscriber line network and wherein the communication system is formed of first and second system halves with the second system half being redundant to the first system half, comprising the steps of: providing each of the first and second system halves with a plurality of non-redundant peripheral equipment units operating in non-redundant manner, the peripheral equipment units each connecting equipment in both of the respective system halves to the at least one subscriber line network via defined interfaces, the defined interfaces providing communication channels for carrying useful data and also being available for changeover to standby; placing the first system half with its associated peripheral equipment units into a defined initial condition by changing communication channels after they are finished carrying useful data in the first system half over to standby and then rerouting them over to the second system half; loading software into the first system half which had been placed into the defined initial condition, and including loading the software into the respective peripheral equipment units of the first system half; after loading of the software into the first system half is completed, placing the communication channels in the second system half in standby and then rerouting them over to the first system half already loaded with the software; then loading software into the second system half including into the respective peripheral equipment units of the second system half; and thereafter restoring redundant operation of the first and second system halves.
Claim 3
Dependent Claim 77 words
The method according to claim 1 wherein the production of the defined initial condition of the first system half to be loaded first and of the peripheral equipment units allocated thereto occurs by thinning out switching-oriented traffic to be processed by the peripheral equipment units allocated to the first system half by processing existing connections for a duration of their existence, new connection requests being rejected until the initial condition defined by a specific criterion is reached.
Claim 4
Dependent Claim 33 words
The method according to claim 2 wherein the specific criterion is the reaching of at least one of the parameters selected from the group consisting of a predetermined time mark and a threshold.
Claim 5
Dependent Claim 45 words
The method according to claim 1 wherein a defined initial condition of the system half to be loaded last and of the peripheral equipment units allocated thereto is produced by clearing down connections conducted over the second system half without previously thinning the switching-oriented traffic.
Claim 6
Dependent Claim 86 words
The method according to claim 4 wherein before the clear down of the connections conducted over the second system half undertaken for achieving the defined initial condition of the second system half to be loaded last and of the peripheral equipment units allocated thereto, the communication channels conducted over the peripheral equipment units allocated to the second system half are interrupted, and, after a changeover to standby request, the second system half reroutes the communication channels onto the peripheral equipment units of the first system half.
Claim 7
Dependent Claim 48 words
The method according to claim 5 wherein the switching of the first system half to be loaded first and of the peripheral equipment units allocated thereto into an operating condition that is active with respect to the at least one subscriber line network is accomplished by operator input.
Claim 8
Dependent Claim 34 words
The method according to claim 1 wherein for restoring the redundant operation, the equipment of the second system half loaded last is disconnected and are reconnected by a controller of the first system half.
Claim 9
Dependent Claim 51 words
The method according to claim 1 wherein the changeover to standby of the communication channels carrying useful data in the defined interfaces to the at least one subscriber line network onto the peripheral equipment units loaded with the new software and an allocation of equipment provided for processing signaling occurs isochronically.
Claim 10
Dependent Claim 35 words
The method according to claim 1 wherein the connecting of the communication channels carrying useful data from the first system half to the second system half occurs with a least one preceding cross-connect switching unit.
Claim 11
Dependent Claim 64 words
The method according to claim 1 wherein allocation of a communication channel to peripheral equipment units as well as of peripheral equipment units to a system half occurs such that, given outage of all of the peripheral equipment units allocated to the respective system half, all communication channels carrying useful data that are thereby affected are alternately routed onto the remaining peripheral equipment units.
Claim 12
Dependent Claim 40 words
The method according to claim 1 wherein each of the defined interfaces of the at least one subscriber line network bring an approximately identical plurality of voice channels to all of the peripheral equipment units allocated to the system halves.
Claim 13
Dependent Claim 13 words
The method according to claim 1 wherein the defined interfaces comprise V5.2 interfaces.
Claim 14
Independent Claim 244 words
A method for loading software into a communication system which is connected to at least one subscriber line network and wherein the communication system is formed of first and second system halves with the second system half being redundant to the first system half, comprising the steps of: providing each of the first and second system halves with redundant central equipment units and a plurality of non-redundant peripheral equipment units operating in non-redundant manner, the peripheral equipment units each connecting the central equipment units in both of the respective system halves to the at least one subscriber line network via interfaces, the interfaces providing communication channels for carrying useful data and also being available for changeover to standby; placing the first system half with its associated peripheral equipment units into a defined initial condition by changing communication channels after they are finished carrying useful data in the first system half over to standby and then rerouting them over to the second system half; loading software into the first system half respective peripheral equipment units; after loading of the software into the first system half is completed, placing the communication channels in the second system half in standby and then rerouting them over to the first system half already loaded with the software; then loading software into the second system half including into the respective peripheral equipment units of the second system half; and thereafter restoring redundant operation of the first and second system halves.
Claim 15
Independent Claim 244 words
A method for loading software into a communication system which is connected to at least one subscriber line network and wherein the communication system is formed of first and second system halves with the second system half being redundant to the first system half, comprising the steps of: providing each of the first and second system halves with redundant central equipment units and a plurality of non-redundant peripheral equipment units operating in non-redundant manner, the peripheral equipment units each connecting the central equipment units in both of the respective system halves to the at least one subscriber line network via interfaces, the interfaces providing communication channels for carrying useful data and also being available for changeover to standby; placing the first system half with its associated peripheral equipment units into a defined initial condition by changing communication channels after they are finished carrying useful data in the first system half over to standby and then rerouting them over to the second system half; loading software into the first system half respective peripheral equipment units; after loading of the software into the first system half is completed, placing the communication channels in the second system half in standby and then rerouting them over to the first system half already loaded with the software; then loading software into the second system half including into the respective peripheral equipment units of the second system half; and thereafter restoring redundant operation of the first and second system halves.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2001-05-11 2001-11-10 2002-05-12 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2005-05-11 2005-11-10 2006-05-12 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2009-05-11 2009-11-10 2010-05-12 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag