Claims Analysis
Total Claims: 17
Claim 1
Independent Claim
120 words
A process for obtaining a signal that indicates a synchronization error between a pseudo-random signal sequence from a transmitter and a reference pseudo-random signal sequence from a receiver by means of a measuring device on the receiving end, comprising steps of: a) separately cross-correlating successive sections of a reference pseudo-random signal sequence in succession with a received pseudo-random signal sequence yielding partial cross-correlation functions; b) adding the partial cross-correlation functions to yield a sum cross-correlation function; c) detecting maximums of the sum cross-correlation function and monitoring a chronological occurrence of the detected maximums; and d) if at least three detected maximums in the sum cross-correlation function do not appear at a predetermined time, generating a signal indicating a synchronization error.
Claim 2
Dependent Claim
120 words
A process for obtaining a signal that indicates a synchronization error between a pseudo-random signal sequence from a transmitter and a reference pseudo-random signal sequence from a receiver by means of a measuring device on the receiving end, comprising steps of: a) separately cross-correlating successive sections of a reference pseudo-random signal sequence in succession with a received pseudo-random signal sequence yielding partial cross-correlation functions; b) adding the partial cross-correlation functions to yield a sum cross-correlation function; c) detecting maximums of the sum cross-correlation function and monitoring a chronological occurrence of the detected maximums; and d) if at least three detected maximums in the sum cross-correlation function do not appear at a predetermined time, generating a signal indicating a synchronization error.
Claim 3
Dependent Claim
32 words
A process according to claim 1, further comprising a step of: e) cross-correlating successive sections of the reference pseudo-random signal sequence of approximately the same length with the received pseudo-random signal sequence.
Claim 4
Dependent Claim
27 words
A process according to claim 2, further comprising a step of: f) analyzing a value of the detected maximums and generating a signal indicating a bit error.
Claim 5
Dependent Claim
58 words
A process according to claim 3, further comprising steps of: g) monitoring the detected maximums of the sum cross-correlation function with regard to their chronological occurrence to detect a shift in a maximum by a predetermined interval of time; and h) upon detection of the predetermined interval, generating a status signal indicating that a bit slip is generated.
Claim 6
Dependent Claim
55 words
A process according to claim 4, further comprising steps of: i) monitoring the sum cross-correlation function with regard to the sequence of occurrence of the maximums in accordance with successive sections of the reference pseudo-random signal sequence; and j) when a disturbance in the sequence is detected, generating an alarm signal indicating a system error.
Claim 7
Dependent Claim
55 words
A process according to claim 3, further comprising steps of: i) monitoring the sum cross-correlation function with regard to the sequence of occurrence of the maximums in accordance with successive sections of the reference pseudo-random signal sequence; and j) when a disturbance in the sequence is detected, generating an alarm signal indicating a system error.
Claim 8
Dependent Claim
58 words
A process according to claim 2, further comprising steps of: g) monitoring the detected maximums of the sum cross-correlation function with regard to their chronological occurrence to detect a shift in a maximum by a predetermined interval of time; and h) upon detection of the predetermined interval, generating a status signal indicating that a bit slip is generated.
Claim 9
Dependent Claim
55 words
A process according to claim 7, further comprising steps of: i) monitoring the sum cross-correlation function with regard to the sequence of occurrence of the maximums in accordance with successive sections of the reference pseudo-random signal sequence; and j) when a disturbance in the sequence is detected, generating an alarm signal indicating a system error.
Claim 10
Dependent Claim
55 words
A process according to claim 2, further comprising steps of: i) monitoring the sum cross-correlation function with regard to the sequence of occurrence of the maximums in accordance with successive sections of the reference pseudo-random signal sequence; and j) when a disturbance in the sequence is detected, generating an alarm signal indicating a system error.
Claim 11
Dependent Claim
27 words
A process according to claim 1, further comprising a step of: f) analyzing a value of the detected maximums and generating a signal indicating a bit error.
Claim 12
Dependent Claim
58 words
A process according to claim 10, further comprising steps of: g) monitoring the detected maximums of the sum cross-correlation function with regard to their chronological occurrence to detect a shift in a maximum by a predetermined interval of time; and h) upon detection of the predetermined interval, generating a status signal indicating that a bit slip is generated.
Claim 13
Dependent Claim
55 words
A process according to claim 11, further comprising steps of: i) monitoring the sum cross-correlation function with regard to the sequence of occurrence of the maximums in accordance with successive sections of the reference pseudo-random signal sequence; and j) when a disturbance in the sequence is detected, generating an alarm signal indicating a system error.
Claim 14
Dependent Claim
55 words
A process according to claim 10, further comprising steps of: i) monitoring the sum cross-correlation function with regard to the sequence of occurrence of the maximums in accordance with successive sections of the reference pseudo-random signal sequence; and j) when a disturbance in the sequence is detected, generating an alarm signal indicating a system error.
Claim 15
Dependent Claim
58 words
A process according to claim 1, further comprising steps of: g) monitoring the detected maximums of the sum cross-correlation function with regard to their chronological occurrence to detect a shift in a maximum by a predetermined interval of time; and h) upon detection of the predetermined interval, generating a status signal indicating that a bit slip is generated.
Claim 16
Dependent Claim
55 words
A process according to claim 14, further comprising steps of: i) monitoring the sum cross-correlation function with regard to the sequence of occurrence of the maximums in accordance with successive sections of the reference pseudo-random signal sequence; and j) when a disturbance in the sequence is detected, generating an alarm signal indicating a system error.
Claim 17
Dependent Claim
55 words
A process according to claim 1, further comprising steps of: i) monitoring the sum cross-correlation function with regard to the sequence of occurrence of the maximums in accordance with successive sections of the reference pseudo-random signal sequence; and j) when a disturbance in the sequence is detected, generating an alarm signal indicating a system error.