Abstract

Abstract A method of extracting thermal energy, in a cyclic manner, from geologic strata which may be termed hot dry rock. A reservoir comprised of hot fractured rock is established and water or other liquid is passed through the reservoir. The water is heated by the hot rock, recovered from the reservoir, cooled by extraction of heat by means of heat exchange apparatus on the surface, and then re-injected into the reservoir to be heated again. Water is added to the reservoir by means of an injection well and recovered from the reservoir by means of a production well. Water is continuously provided to the reservoir and continuously withdrawn from the reservoir at two different flow rates, a base rate and a peak rate. Increasing water flow from the base rate to the peak rate is accomplished by rapidly decreasing backpressure at the outlet of the production well in order to meet periodic needs for amounts of thermal energy greater than a baseload amount, such as to generate additional electric power to meet peak demands. The rate of flow of water provided to the hot dry rock reservoir is maintained at a value effective to prevent depletion of the liquid inventory of the reservoir.

Inventors

  • 👤 Donald W. Brown

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 03:38
CPC Classifications
F; F24; F24T; F24T10/00; F24T10/20; Y; Y02; Y02E; Y02E10/00; Y02E10/10

Claims Analysis

Total Claims: 9
Claim 1
Independent Claim 257 words
A method for continuously extracting energy from hot rock located beneath the surface of the earth, where the quantity of extracted energy is cycled in a periodic manner, said method comprising: a. establishing a reservoir comprised of hot fractured rock beneath the surface of the earth; b. continuously providing cold liquid to said reservoir through at least one injection well, where said injection well extends from the surface of the earth into the reservoir; c. withdrawing hot liquid from the reservoir through at least one production well at a base rate of flow for a first time period, where said production well extends from the surface of the earth into the reservoir; d. withdrawing hot liquid from the reservoir through the production well at a peak rate of flow for a second time period, where said second time period is of lesser duration than said first time period, where said peak flow rate is greater than said base flow rate, and where the temperature of hot liquid flowing out of the production well during the second time period is about equal to or greater than the temperature of hot liquid flowing out of the production well during the first time period; e. continuously repeating steps c and d; f. establishing the rate of flow of cold liquid into the reservoir at a value effective for maintaining the base flow rate and the peak flow rate for a plurality of cycles and g. extracting heat from hot liquid to form cold liquid which is provided to the reservoir.
Claim 2
Independent Claim 257 words
A method for continuously extracting energy from hot rock located beneath the surface of the earth, where the quantity of extracted energy is cycled in a periodic manner, said method comprising: a. establishing a reservoir comprised of hot fractured rock beneath the surface of the earth; b. continuously providing cold liquid to said reservoir through at least one injection well, where said injection well extends from the surface of the earth into the reservoir; c. withdrawing hot liquid from the reservoir through at least one production well at a base rate of flow for a first time period, where said production well extends from the surface of the earth into the reservoir; d. withdrawing hot liquid from the reservoir through the production well at a peak rate of flow for a second time period, where said second time period is of lesser duration than said first time period, where said peak flow rate is greater than said base flow rate, and where the temperature of hot liquid flowing out of the production well during the second time period is about equal to or greater than the temperature of hot liquid flowing out of the production well during the first time period; e. continuously repeating steps c and d; f. establishing the rate of flow of cold liquid into the reservoir at a value effective for maintaining the base flow rate and the peak flow rate for a plurality of cycles and g. extracting heat from hot liquid to form cold liquid which is provided to the reservoir.
Claim 3
Dependent Claim 24 words
The method of claim 1 where the rate of flow of cold liquid into the injection well is maintained at a substantially constant value.
Claim 4
Dependent Claim 25 words
The method of claim 1 where the pressure of cold liquid at the inlet of the injection well is maintained at a substantially constant value.
Claim 5
Dependent Claim 37 words
The method of claim 1 where the rate of flow of cold liquid into the injection well is greater than the rate of flow of hot liquid out of the production well during the first time period.
Claim 6
Dependent Claim 41 words
The method of claim 1 where the rate of flow of cold liquid into the injection well is about equal to or less than the rate of flow of hot liquid out of the production well during the second time period.
Claim 7
Dependent Claim 34 words
The method of claim 1 where the pressure of hot liquid flowing out of the production well during the first time period is greater than said hot liquid pressure during the second time period.
Claim 8
Dependent Claim 42 words
The method of claim 1 where the rate of flow of hot liquid out of the injection well is controlled at a first substantially constant value during the first time period and a second substantially constant value during the second time period.
Claim 9
Dependent Claim 37 words
The method of claim 1 where the pressure of hot liquid at the outlet of the production well is controlled at values effective to maintain flow at the base flow rate and at the peak flow rate.

References Cited (Backward Citations)

US3786858A Cited
US3817038A Cited
US3863709A Cited
US4458492A Cited
US4043386A Cited
US4112745A Cited
US4357802A Cited
US4201060A Cited
US4712380A Cited
US5311741A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2000-11-10 2001-05-12 2001-11-11 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2004-11-10 2005-05-12 2005-11-11 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2008-11-10 2009-05-12 2009-11-11 $7700.00 Window Closed / Lapsed