Claims Analysis
Total Claims: 30
Claim 1
Independent Claim
180 words
A switching circuit for switching power between a power source and a load, said switching circuit comprising: (a) first and second electrically controllable switches connected in series to electrically connect and disconnect said power source and said load; (b) a third electrically controllable switch connected in parallel with said series connected first and second electrically controllable switches; (c) control means connected to said first, second and third switches; said control means being operable for sequentially closing said first, second and third switches in that order to connect said power source to said load; (d) said control means being operable for thereafter opening said first and second switches and retaining said first and second switches open until an opening sequence is begun; (e) said control means being further operable for reclosing said first switch and said second switch while said third switch remains closed to initiate an opening sequence; (f) said control means being further operable for opening said third switch after reclosing said first and second switches during said opening sequence; and (g) thereafter reopening said first and second switches.
Claim 2
Dependent Claim
180 words
A switching circuit for switching power between a power source and a load, said switching circuit comprising: (a) first and second electrically controllable switches connected in series to electrically connect and disconnect said power source and said load; (b) a third electrically controllable switch connected in parallel with said series connected first and second electrically controllable switches; (c) control means connected to said first, second and third switches; said control means being operable for sequentially closing said first, second and third switches in that order to connect said power source to said load; (d) said control means being operable for thereafter opening said first and second switches and retaining said first and second switches open until an opening sequence is begun; (e) said control means being further operable for reclosing said first switch and said second switch while said third switch remains closed to initiate an opening sequence; (f) said control means being further operable for opening said third switch after reclosing said first and second switches during said opening sequence; and (g) thereafter reopening said first and second switches.
Claim 3
Dependent Claim
18 words
The apparatus as defined by claim 1 whereby said first switch is reclosed prior to said second switch.
Claim 4
Dependent Claim
18 words
The apparatus as defined by claim 1 whereby said second switch is reopened prior to said first switch.
Claim 5
Dependent Claim
28 words
The device of claim 1 wherein said third switch is closed only after a delay of from 70 to 135 milliseconds after the closing of said second switch.
Claim 6
Dependent Claim
26 words
The device of claim 4 wherein said third switch is closed only after a delay of about 100 milliseconds after the closing of said second switch.
Claim 7
Dependent Claim
25 words
The apparatus as defined by claim 1 wherein said first and third switches comprise electrical relays and said second switch comprises a controllable conductive device.
Claim 8
Dependent Claim
25 words
The apparatus as defined by claim 1 further comprising means for controlling the time interval between the sequential closings of said first and second switches.
Claim 9
Dependent Claim
25 words
The apparatus as defined by claim 1 further comprising means for controlling the time interval between the sequential closings of said second and third switches.
Claim 10
Dependent Claim
32 words
The apparatus as defined by claim 1 further comprising means for controlling the respective time intervals between the sequential closings of said first and second switches, and said second and third switches.
Claim 11
Dependent Claim
12 words
The circuit of claim 1 wherein said load comprises an inductive load.
Claim 12
Dependent Claim
27 words
The device of claim 7 wherein said third switch is closed after a delay of from 70 to 135 milliseconds after the closing of said second switch.
Claim 13
Dependent Claim
25 words
The device of claim 11 wherein said third switch is closed after a delay of about 100 milliseconds after the closing of said second switch.
Claim 14
Dependent Claim
170 words
A switching circuit for switching power between a power source and a load, said switching circuit comprising: (a) first and second electrically controllable switches connected in series to electrically connect and disconnect said power source and said load; (b) a third electrically controllable switch connected in parallel with said second electrically controllable switch; (c) control means connected to said first, second and third switches; said control means being operable for sequentially closing said first, second and third switches in that order to connect said power source to said load; (d) said control means being operable for thereafter opening said second switch and retaining said second switch open until an opening sequence is begun; (e) said control means being further operable for reclosing said second switch while said first switch and said third switch remain closed to initiate an opening sequence; (f) said control means being further operable for opening said third switch after reclosing said second switch during said opening sequence; and (g) thereafter reopening said first and second switches.
Claim 15
Dependent Claim
170 words
A switching circuit for switching power between a power source and a load, said switching circuit comprising: (a) first and second electrically controllable switches connected in series to electrically connect and disconnect said power source and said load; (b) a third electrically controllable switch connected in parallel with said second electrically controllable switch; (c) control means connected to said first, second and third switches; said control means being operable for sequentially closing said first, second and third switches in that order to connect said power source to said load; (d) said control means being operable for thereafter opening said second switch and retaining said second switch open until an opening sequence is begun; (e) said control means being further operable for reclosing said second switch while said first switch and said third switch remain closed to initiate an opening sequence; (f) said control means being further operable for opening said third switch after reclosing said second switch during said opening sequence; and (g) thereafter reopening said first and second switches.
Claim 16
Dependent Claim
12 words
The apparatus of claim 13 wherein said load comprises an inductive load.
Claim 17
Dependent Claim
16 words
The apparatus of claim 13 wherein said first and third electrically controllable switches comprise electrical relays.
Claim 18
Dependent Claim
14 words
The apparatus of claim 13 wherein said second electrically controllable switch comprises a triac.
Claim 19
Independent Claim
180 words
A method for switching power between a power source and a load, said method comprising the steps of: (a) providing a switching circuit comprising a first switch and a controllably conductive device connected in series with one another and connected in series with said power source and said load, and a second switch connected in parallel, with said series connected first switch and said controllably conductive device; (b) connecting said power source to said load by closing said first switch and waiting for a first predetermined time period and after said first predetermined time period, rendering said controllably conductive device conductive and waiting for a second predetermined time period and thereafter closing said second switch; thereafter rendering said controllably conductive device nonconductive and opening said first switch until an opening sequence is begun; (c) and disconnecting said power source from said load by reclosing said first switch device and rendering said controllably conductive device conductive again to initiate an opening sequence, and opening said second switch and then rendering said controllably conductive device nonconductive again and reopening said first switch.
Claim 20
Independent Claim
180 words
A method for switching power between a power source and a load, said method comprising the steps of: (a) providing a switching circuit comprising a first switch and a controllably conductive device connected in series with one another and connected in series with said power source and said load, and a second switch connected in parallel, with said series connected first switch and said controllably conductive device; (b) connecting said power source to said load by closing said first switch and waiting for a first predetermined time period and after said first predetermined time period, rendering said controllably conductive device conductive and waiting for a second predetermined time period and thereafter closing said second switch; thereafter rendering said controllably conductive device nonconductive and opening said first switch until an opening sequence is begun; (c) and disconnecting said power source from said load by reclosing said first switch device and rendering said controllably conductive device conductive again to initiate an opening sequence, and opening said second switch and then rendering said controllably conductive device nonconductive again and reopening said first switch.
Claim 21
Dependent Claim
27 words
The method of claim 17 wherein said second switch is closed after a delay of from 70 to 135 milliseconds after rendering said controllably conductive device conductive.
Claim 22
Dependent Claim
26 words
The method of claim 18 wherein said second switch is closed only after a delay of about 100 milliseconds after rendering said controllably conductive device conductive.
Claim 23
Dependent Claim
35 words
The method as defined by claim 17 wherein said first predetermined period is between about 15 and about 60 milliseconds, and wherein said second predetermined time period is between about 70 and about 135 milliseconds.
Claim 24
Dependent Claim
23 words
The method as defined by claim 20 wherein said first and second predetermined time periods are about 40 and about 100 milliseconds, respectively.
Claim 25
Dependent Claim
55 words
The method as defined by claim 17 wherein said first and second switches comprise electrical relays, each relay having electrical contacts which snap together when their associated switch is closed, and wherein said first time period is sufficient to allow the contacts of said first switch to stabilize together after said first switch is closed.
Claim 26
Dependent Claim
31 words
The method as defined by claim 22 wherein said second predetermined time period is sufficient to allow any current surge occurring after said controllably conductive device is rendered conductive to abate.
Claim 27
Independent Claim
141 words
A method for disconnecting a load from a power source; said method comprising the steps of: (a) providing a switching circuit comprising a first electrically controllable switch and a controllably conductive device in series with the load and a second electrically controllable switch in parallel with said first electrically controllable switch and said controllably conductive device; said second electrically controllable switch being in the closed state when said load is connected to said power source; (b) disconnecting said power source from said load by closing said first electrically controllable switch and waiting for a predetermined period of time, and after said period of time rendering said controllably conductive device conductive and waiting for a second predetermined period of time; and thereafter opening said second electrically controllable switch, then rendering said controllably conductive device nonconductive and opening said first electrically controllable switch.
Claim 28
Independent Claim
141 words
A method for disconnecting a load from a power source; said method comprising the steps of: (a) providing a switching circuit comprising a first electrically controllable switch and a controllably conductive device in series with the load and a second electrically controllable switch in parallel with said first electrically controllable switch and said controllably conductive device; said second electrically controllable switch being in the closed state when said load is connected to said power source; (b) disconnecting said power source from said load by closing said first electrically controllable switch and waiting for a predetermined period of time, and after said period of time rendering said controllably conductive device conductive and waiting for a second predetermined period of time; and thereafter opening said second electrically controllable switch, then rendering said controllably conductive device nonconductive and opening said first electrically controllable switch.
Claim 29
Dependent Claim
12 words
The method of claim 24 wherein said load comprises an inductive load.
Claim 30
Dependent Claim
16 words
The method of claim 24 wherein said first and second electrically controllable switches comprise electrical relays.