Claims Analysis
Total Claims: 17
Claim 1
Independent Claim
177 words
In an electrical energy meter containing means therein for metering a quantity of electrical energy generated by a supplier and transferred via a power supply line to a load of a customer during an energy measurement time interval, a method of monitoring variations in the metered quantity of electrical energy, comprising the steps of: sensing a line voltage transferred via the power supply line to the load during the energy measurement time interval; detecting an increase in a magnitude of the sensed line voltage from an acceptable voltage level to a level greater than a first surge threshold voltage, upon commencement of a surge time interval during which the magnitude of the sensed line voltage is at all times greater than the acceptable voltage level; recording a surge event if the magnitude of the sensed line voltage exceeds the acceptable voltage level for a first predetermined amount of time after commencement of the surge time interval; and then communicating the recorded surge event to at least the supplier or customer before termination of the surge time interval.
Claim 2
Dependent Claim
177 words
In an electrical energy meter containing means therein for metering a quantity of electrical energy generated by a supplier and transferred via a power supply line to a load of a customer during an energy measurement time interval, a method of monitoring variations in the metered quantity of electrical energy, comprising the steps of: sensing a line voltage transferred via the power supply line to the load during the energy measurement time interval; detecting an increase in a magnitude of the sensed line voltage from an acceptable voltage level to a level greater than a first surge threshold voltage, upon commencement of a surge time interval during which the magnitude of the sensed line voltage is at all times greater than the acceptable voltage level; recording a surge event if the magnitude of the sensed line voltage exceeds the acceptable voltage level for a first predetermined amount of time after commencement of the surge time interval; and then communicating the recorded surge event to at least the supplier or customer before termination of the surge time interval.
Claim 3
Dependent Claim
37 words
The method of claim 1, further comprising the steps of capturing the sensed line voltage as a waveform during the surge time interval; and communicating the waveform to the supplier before termination of the surge time interval.
Claim 4
Dependent Claim
76 words
The method of claim 1, wherein said detecting step comprises detecting an increase in a magnitude of the sensed line voltage from an acceptable voltage level to a level greater than a first surge threshold voltage, upon commencement of a surge time interval during which the magnitude of the sensed line voltage is at all times greater than at least a second surge threshold voltage intermediate the acceptable voltage level and the first surge threshold voltage.
Claim 5
Dependent Claim
30 words
The method of claim 1, wherein said communicating step comprises transferring data from a modem internal to the meter to a telephone line operatively connected thereto via a data port.
Claim 6
Dependent Claim
37 words
The method of claim 4, further comprising the steps of capturing the sensed line voltage as a waveform during the surge time interval; and communicating the waveform to the supplier before termination of the surge time interval.
Claim 7
Dependent Claim
115 words
The method of claim 1, further comprising the steps of: detecting a decrease in the magnitude of the sensed line voltage from the acceptable voltage level to a level less than a first sag threshold voltage, upon commencement of a sag time interval during which the magnitude of the sensed line voltage is at all times less than the acceptable voltage level; recording a sag event if the magnitude of the sensed line voltage stays below the acceptable voltage level for a second predetermined amount of time after commencement of the sag time interval; and then communicating the recorded sag event to at least the supplier or customer before termination of the sag time interval.
Claim 8
Dependent Claim
152 words
The method of claim 6, wherein said step of detecting an increase comprises detecting an increase in a magnitude of the sensed line voltage from an acceptable voltage level to a level greater than a first surge threshold voltage, upon commencement of a surge time interval during which the magnitude of the sensed line voltage is at all times greater than at least a second surge threshold voltage intermediate the acceptable voltage level and the first surge threshold voltage; and wherein said step of detecting a decrease comprises detecting a decrease in the magnitude of the sensed line voltage from the acceptable voltage level to a level less than a first sag threshold voltage, upon commencement of a sag time interval during which the magnitude of the sensed line voltage is at all times less than a second sag threshold voltage intermediate the acceptable voltage level and the first sag threshold voltage.
Claim 9
Dependent Claim
43 words
The method of claim 7, wherein said step of recording a surge event comprises recording a surge event if the sensed line voltage exceeds the second surge threshold voltage for a first predetermined amount of time after commencement of the surge time interval.
Claim 10
Dependent Claim
176 words
In an electrical energy meter containing means therein for metering a quantity of electrical energy generated by a supplier and transferred via a power supply line to a load of a customer during an energy measurement time interval, a method of monitoring variations in the metered quantity of electrical energy, comprising the steps of: sensing a line voltage transferred via the power supply line to the load during the energy measurement time interval; detecting an increase in a magnitude of the sensed line voltage from an acceptable voltage level to a level greater than a first surge threshold voltage, upon commencement of a surge time interval during which the magnitude of the sensed line voltage is at all times greater than the acceptable voltage level; recording a surge event if the magnitude of the sensed line voltage exceeds the acceptable voltage level for a first predetermined amount of time after commencement of the surge time interval; and then communicating the recorded surge event to at least the supplier or customer promptly on a real time basis.
Claim 11
Dependent Claim
176 words
In an electrical energy meter containing means therein for metering a quantity of electrical energy generated by a supplier and transferred via a power supply line to a load of a customer during an energy measurement time interval, a method of monitoring variations in the metered quantity of electrical energy, comprising the steps of: sensing a line voltage transferred via the power supply line to the load during the energy measurement time interval; detecting an increase in a magnitude of the sensed line voltage from an acceptable voltage level to a level greater than a first surge threshold voltage, upon commencement of a surge time interval during which the magnitude of the sensed line voltage is at all times greater than the acceptable voltage level; recording a surge event if the magnitude of the sensed line voltage exceeds the acceptable voltage level for a first predetermined amount of time after commencement of the surge time interval; and then communicating the recorded surge event to at least the supplier or customer promptly on a real time basis.
Claim 12
Dependent Claim
114 words
The method of claim 9, further comprising the steps of: detecting a decrease in the magnitude of the sensed line voltage from the acceptable voltage level to a level less than a first sag threshold voltage, upon commencement of a sag time interval during which the magnitude of the sensed line voltage is at all times less than the acceptable voltage level; recording a sag event if the magnitude of the sensed line voltage stays below the acceptable voltage level for a second predetermined amount of time after commencement of the sag time interval; and then communicating the recorded sag event to at least the supplier or customer promptly on a real time basis.
Claim 13
Dependent Claim
156 words
An electrical energy meter for reporting line voltage variations in real-time, comprising: means for sensing a line voltage generated by a supplier and transferred via a power supply line to a load of a customer; means, responsive to said sensing means, for detecting an increase in a magnitude of the sensed line voltage from an acceptable voltage level to a level greater than a first surge threshold voltage, upon commencement of a surge time interval during which the magnitude of the sensed line voltage is at all times greater than the acceptable voltage level; means, responsive to said detecting means, for recording a surge event if the sensed line voltage exceeds the acceptable voltage level for a first predetermined amount of time after commencement of the surge time interval; and means, responsive to said recording means, for communicating the recorded surge event to at least the supplier or customer before termination of the surge time interval.
Claim 14
Dependent Claim
156 words
An electrical energy meter for reporting line voltage variations in real-time, comprising: means for sensing a line voltage generated by a supplier and transferred via a power supply line to a load of a customer; means, responsive to said sensing means, for detecting an increase in a magnitude of the sensed line voltage from an acceptable voltage level to a level greater than a first surge threshold voltage, upon commencement of a surge time interval during which the magnitude of the sensed line voltage is at all times greater than the acceptable voltage level; means, responsive to said detecting means, for recording a surge event if the sensed line voltage exceeds the acceptable voltage level for a first predetermined amount of time after commencement of the surge time interval; and means, responsive to said recording means, for communicating the recorded surge event to at least the supplier or customer before termination of the surge time interval.
Claim 15
Dependent Claim
136 words
The meter of claim 11, further comprising: means, responsive to said sensing means, for detecting a decrease in the magnitude of the sensed line voltage from the acceptable voltage level to a level less than a first sag threshold voltage, upon commencement of a sag time interval during which the magnitude of the sensed line voltage is at all times less than the acceptable voltage level; means, responsive to said means for detecting a decrease, for recording a sag event if the sensed line voltage stays below the acceptable voltage level for a second predetermined amount of time after commencement of the sag time interval; and means, responsive to said means for recording a sag event, for communicating the recorded sag event to at least the supplier or customer before termination of the sag time interval.
Claim 16
Dependent Claim
33 words
The meter of claim 12, wherein said means for communicating the recorded surge event comprises a modem for transferring data from internal the meter to an external telephone line via a data port.
Claim 17
Dependent Claim
55 words
The meter of claim 13, wherein said means for recording a surge event comprises means for capturing the sensed line voltage as a waveform during the surge time interval; and wherein said means for communicating the recorded surge event comprises means for communicating the waveform to the supplier before termination of the surge time interval.