Patent SE29208C1 successfully refreshed from Google Patents.
Patent US5583781A successfully refreshed from Google Patents.
US5583781A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Process and device to correct the regulation onset point and the intensity of regulation
Assignee: Rieter Ingolstadt GmbH
•
Filing: 1994-08-25
•
Granted: 1996-12-10
•
Expires: 2014-08-25
Abstract
Abstract A process and a device for the correction of the regulation onset point and of the intensity of regulation relate to a regulated drawing frame of the textile industry, i.e. a drawing frame in which drafting can be regulated or can be changed in a controlled manner. A selected transient signal of the fiber sliver thickness starts the process for a limited time span so that, independently of the existing regulation, the response signal is detected at the drawing frame output and its difference with the input signal is evaluated in order to correct the regulation onset point and/or the intensity of regulation.
Inventors
- 👤 Peter Denz
- 👤 Johann-Christian Promoli
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 12:05
CPC Classifications
D; D01; D01H; D01H5/00; D01H5/18; D01H5/32; D01H5/38; D01H5/42
Claims Analysis
Total Claims: 24
Claim 1
Independent Claim
234 words
A correction process for intermittently testing and correcting if necessary a regulation system of a drawing frame for fiber slivers in which drafting is regulated to compensate for thickness fluctuations in the fiber sliver, said correction process comprising: starting the correction process by intermittently detecting an input transient error signal representing fiber sliver thickness at a measuring point before the sliver enters the drafting zone of the draw frame, said detecting occurring simultaneously and in parallel with continuous measurement of sliver thickness by the regulation system; detecting and measuring the regulation system response to the input transient error signal at the output of the drafting zone independently of and in parallel with operation of the regulation system, in that continuous regulation by the regulation system is not dependent upon any measured response of the regulation system to the input transient error signal; evaluating the regulation system response to the input transient error signal independently of and in parallel with the regulation system in that the degree of regulation of the regulation system is not dependent upon said evaluating; correcting the onset point of regulation or regulation intensity of the regulation system as a factor of the independently evaluated regulation system response to the transient error signal by providing a correction signal to the regulation system; and ending the correction process, and starting the correction process again upon receipt of a subsequent transient error signal.
Claim 2
Dependent Claim
234 words
A correction process for intermittently testing and correcting if necessary a regulation system of a drawing frame for fiber slivers in which drafting is regulated to compensate for thickness fluctuations in the fiber sliver, said correction process comprising: starting the correction process by intermittently detecting an input transient error signal representing fiber sliver thickness at a measuring point before the sliver enters the drafting zone of the draw frame, said detecting occurring simultaneously and in parallel with continuous measurement of sliver thickness by the regulation system; detecting and measuring the regulation system response to the input transient error signal at the output of the drafting zone independently of and in parallel with operation of the regulation system, in that continuous regulation by the regulation system is not dependent upon any measured response of the regulation system to the input transient error signal; evaluating the regulation system response to the input transient error signal independently of and in parallel with the regulation system in that the degree of regulation of the regulation system is not dependent upon said evaluating; correcting the onset point of regulation or regulation intensity of the regulation system as a factor of the independently evaluated regulation system response to the transient error signal by providing a correction signal to the regulation system; and ending the correction process, and starting the correction process again upon receipt of a subsequent transient error signal.
Claim 3
Dependent Claim
56 words
The process as in claim 1, including establishing at lest one threshold value of the input signal representing fiber sliver thickness, the threshold value necessarily being obtained before the input transient error signal is detected by the correction process, said regulation system continuously operating in non-dependance on the threshold value necessary to start said correction process.
Claim 4
Dependent Claim
15 words
The process as in claim 2, including establishing threshold values of signal amplitude and steepness.
Claim 5
Dependent Claim
30 words
The process as in claim 3, wherein the amplitude of the input signal representing fiber sliver thickness exceeds a threshold value beyond a mean tolerance value of fiber sliver thickness.
Claim 6
Dependent Claim
28 words
The process as in claim 3, wherein the amplitude of the input signal representing fiber sliver thickness exceeds the established threshold value for a predetermined period of time.
Claim 7
Dependent Claim
34 words
The process as in claim 5, including generating clocking impulses during said detecting of the input signal, the predetermined period of time being at least equal to three clocking impulses of a measured phase.
Claim 8
Dependent Claim
31 words
The process as in claim 1, wherein a detected input transient error signal reveals an abnormal condition in the fiber slivers being fed to the drafting zone of the draw frame.
Claim 9
Dependent Claim
37 words
The process as in claim 7, further including inducing the input transient error signal with a reserve sliver feeding system which feeds an additional segment of reserve sliver to the slivers being fed to the drafting zone.
Claim 10
Dependent Claim
52 words
The process as in claim 1, including routing a measured response signal representing the regulation system response to the input transient error signal through a regulation onset point signal processing path for correction of the regulation system onset point, and through a regulation intensity signal processing path for correction of regulation intensity.
Claim 11
Dependent Claim
40 words
The process as in claim 9, wherein the regulation onset point signal processing path determines the actual onset point of regulation in the drafting zone as a function of the time and polarity of amplitude changes of the response signal.
Claim 12
Dependent Claim
39 words
The process as in claim 10, further including computing a regulation onset point correction factor as a function of the time and amplitude changes of the response signal, and applying the onset point correction factor to the regulation system.
Claim 13
Dependent Claim
52 words
The process as in claim 1, wherein the regulation intensity signal processing path determines a regulation intensity correction factor as a function of the difference between mean values of the input transient error signal and mean values of the regulation response signal, and applies the intensity correction factor to the regulation system.
Claim 14
Dependent Claim
499 words
A correction system for monitoring and correcting the regulating system of a draw frame, said correction system operating in parallel with operation of said regulating system, said correction system comprising: regulating intensity processing means for analyzing the intensity response of said regulating system and computing an intensity correction factor to correct regulating intensity of said regulating system; and regulating onset point processing means for analyzing the actual onset point of regulation of said regulating system and computing an onset point correction factor to adjust the regulating onset point, said intensity processing means and said onset processing means operating independently of and in parallel with said regulating system, said regulating system includes a fiber sliver input measuring station operably before the drafting zone of said draw frame, and a fiber sliver output measuring station operably after the drafting zone of said draw frame, said correction system further comprising: a control circuit in operable communication with said input measuring station, said control circuit detecting an input fiber sliver transient error signals from said input measuring station and starting the correction process, said control circuit being operationally independent of said regulating system in that said regulating system is dependent upon and continuously measures input sliver thickness and is not dependent upon said transient error signal for continuous regulation; a measured value evaluating unit in operable communication with said output measuring station to receive a measured response signal indicating the response of said regulating system to the transient error signal, said measured value evaluating unit having two output paths, one said output path to said regulation intensity processing means and the other said output path to said regulation onset point processing means, said control circuit and said measured value evaluating unit being operationally independent from said regulating system in that said regulating system continuously operates is non-dependance upon any input from said control circuit and said measured value evaluating unit; said regulation onset point processing means comprising a counting and evaluating unit operably configured with said measured value evaluating unit, said counting and evaluating unit operably configured to determine actual onset of regulation of said regulating system without changing regulation onset and to compute a correction factor for onset of regulation as a function of the time and amplitude changes of the response signal of said regulation system, said counting and evaluating unit applying said onset point correction factor to said regulation system, said regulation system changing the onset point of regulation in response to said onset point correction factor; and said regulation intensity processing means comprising processing devices for determining a regulation intensity correction factor as a function of the difference between mean values of the input transient error signal received by said control circuit and mean values of the regulation response signal received by said measured value evaluating unit without effecting regulation intensity of said regulating system, and for applying said intensity correction factor to said regulating system, said regulation system changing regulation intensity in response to said intensity correction factor.
Claim 15
Dependent Claim
499 words
A correction system for monitoring and correcting the regulating system of a draw frame, said correction system operating in parallel with operation of said regulating system, said correction system comprising: regulating intensity processing means for analyzing the intensity response of said regulating system and computing an intensity correction factor to correct regulating intensity of said regulating system; and regulating onset point processing means for analyzing the actual onset point of regulation of said regulating system and computing an onset point correction factor to adjust the regulating onset point, said intensity processing means and said onset processing means operating independently of and in parallel with said regulating system, said regulating system includes a fiber sliver input measuring station operably before the drafting zone of said draw frame, and a fiber sliver output measuring station operably after the drafting zone of said draw frame, said correction system further comprising: a control circuit in operable communication with said input measuring station, said control circuit detecting an input fiber sliver transient error signals from said input measuring station and starting the correction process, said control circuit being operationally independent of said regulating system in that said regulating system is dependent upon and continuously measures input sliver thickness and is not dependent upon said transient error signal for continuous regulation; a measured value evaluating unit in operable communication with said output measuring station to receive a measured response signal indicating the response of said regulating system to the transient error signal, said measured value evaluating unit having two output paths, one said output path to said regulation intensity processing means and the other said output path to said regulation onset point processing means, said control circuit and said measured value evaluating unit being operationally independent from said regulating system in that said regulating system continuously operates is non-dependance upon any input from said control circuit and said measured value evaluating unit; said regulation onset point processing means comprising a counting and evaluating unit operably configured with said measured value evaluating unit, said counting and evaluating unit operably configured to determine actual onset of regulation of said regulating system without changing regulation onset and to compute a correction factor for onset of regulation as a function of the time and amplitude changes of the response signal of said regulation system, said counting and evaluating unit applying said onset point correction factor to said regulation system, said regulation system changing the onset point of regulation in response to said onset point correction factor; and said regulation intensity processing means comprising processing devices for determining a regulation intensity correction factor as a function of the difference between mean values of the input transient error signal received by said control circuit and mean values of the regulation response signal received by said measured value evaluating unit without effecting regulation intensity of said regulating system, and for applying said intensity correction factor to said regulating system, said regulation system changing regulation intensity in response to said intensity correction factor.
Claim 16
Dependent Claim
89 words
The system as in claim 13, wherein said draw frame regulating system includes a measured value memory in communication with said input measuring station, an amplifier receiving signals from said measured value memory, and an adjusting element receiving and applying signals from said amplifier for regulating the drafting of said draw frame, said counting and evaluating unit applying said onset point correction factor to said regulation system through said measured value memory, said regulation intensity processing path applying said intensity correction factor to said adjusting element through said amplifier.
Claim 17
Dependent Claim
37 words
The system as in claim 14, wherein said processing devices of said regulation intensity correction processing path comprises a mean value former, a buffer memory, and a mean value comparator, said comparator outputting directly to said amplifier.
Claim 18
Dependent Claim
51 words
The system as in claim 13, wherein said draw frame comprises a reserve fiber sliver feeding system, said control circuit operably connected to said reserve fiber sliver feeding system for initiating feeding of a length of reserve fiber sliver thereby generating the input transient error signal detected by said control circuit.
Claim 19
Dependent Claim
199 words
An autoleveling draw frame for automatically leveling a band of fiber slivers within a drafting zone, said draw frame comprising: a regulation system configured to automatically and continuously control the degree of drafting within said drafting zone, said regulation system comprising a fiber sliver input measuring station operably before said drafting zone, a fiber sliver output measuring station operably after said drafting zone; a correction system configured to operate independent of and in parallel with said regulation system for intermittently determining and correcting the intensity and onset of regulation of said regulation system without said regulation system being dependent upon said correction system for automatic and continuous operation thereof, said correction system further comprising regulating intensity processing means for analyzing the intensity response of said regulating system to an intermittent transient error signal and computing an intensity correction factor to be provided to said regulation system to correct regulating intensity of said regulating system ; and regulating onset point processing means for analyzing the actual onset point of regulation of said regulating system to said intermittent transient error signal and computing an onset point correction factor to be provided to said regulation system to adjust the regulating onset point.
Claim 20
Dependent Claim
199 words
An autoleveling draw frame for automatically leveling a band of fiber slivers within a drafting zone, said draw frame comprising: a regulation system configured to automatically and continuously control the degree of drafting within said drafting zone, said regulation system comprising a fiber sliver input measuring station operably before said drafting zone, a fiber sliver output measuring station operably after said drafting zone; a correction system configured to operate independent of and in parallel with said regulation system for intermittently determining and correcting the intensity and onset of regulation of said regulation system without said regulation system being dependent upon said correction system for automatic and continuous operation thereof, said correction system further comprising regulating intensity processing means for analyzing the intensity response of said regulating system to an intermittent transient error signal and computing an intensity correction factor to be provided to said regulation system to correct regulating intensity of said regulating system ; and regulating onset point processing means for analyzing the actual onset point of regulation of said regulating system to said intermittent transient error signal and computing an onset point correction factor to be provided to said regulation system to adjust the regulating onset point.
Claim 21
Dependent Claim
287 words
The draw frame as in claim 17, wherein said correction system further comprises: a control circuit in operable communication with said input, measuring station, said control circuit detecting an input fiber sliver transient error signal from said input measuring station and starting the correction process independent of continuous and ongoing operation of said regulation system; a measured value evaluating unit in operable communication with said output measuring station to receive a response signal from to said transient error signal said regulation system, said regulation system continuously and automatically operating in non-dependence on said response signal and said evaluating unit, said measured value evaluating unit having two output paths, one said output path to said regulation intensity processing means and the other said output path to said regulation onset point processing means; said regulation onset point processing means comprising a counting and evaluating unit operably configured with said measured value evaluating unit, said counting and evaluating unit operably configured to determine actual onset of regulation said regulation system without effecting onset of regulation and to compute a correction factor for onset of regulation as a function of the time and amplitude changes of the response signal of said regulation system as measured by said measured value evaluating unit, said counting and evaluating unit applying said onset point correction factor to said regulation system; said regulation intensity processing means comprising processing devices for determining a regulation intensity correction factor as a function of the difference between mean values of the input transient error signal received by said control circuit and mean values of the regulation response signal received by said measured value evaluating unit without effecting regulation intensity, and for applying said intensity correction factor to the regulation system.
Claim 22
Dependent Claim
88 words
The draw frame as in claim 18, wherein said regulation system includes a measured value memory in communication with said input measuring station, an amplifier receiving signals from said measured value memory, and an adjusting element receiving and applying signals from said amplifier for regulating the drafting of said draw frame, said counting and evaluating unit applying said onset point correction factor to said regulation system through said measured value memory, said regulation intensity processing path applying said intensity correction factor to said adjusting element through said amplifier.
Claim 23
Dependent Claim
37 words
The system as in claim 18, wherein said processing devices of said regulation intensity correction processing path comprises a mean value former, a buffer memory, and a mean value comparator, said comparator outputting directly to said amplifier.
Claim 24
Dependent Claim
51 words
The system as in claim 18, wherein said draw frame comprises a reserve fiber sliver feeding system, said control circuit operably connected to said reserve fiber sliver feeding system for initiating feeding of a length of reserve fiber sliver thereby generating the input transient error signal detected by said control circuit.
References Cited (Backward Citations)
US284585A
Cited
US352701A
Cited
US7919A
Cited
US68741A
Cited
US86719A
Cited
US110556A
Cited
US117098A
Cited
US164452A
Cited
US216630A
Cited
US387701A
Cited
US7165A
Cited
US4847A
Cited
US278488A
Cited
US389695A
Cited
US392172A
Cited
US447200A
Cited
US449477A
Cited
US466410A
Cited
US565084A
Cited
US655934A
Cited
US690596A
Cited
US786242A
Cited
US887281A
Cited
US1132316A
Cited
US1111290A
Cited
US2141003A
Cited
DE720200C
Cited
US2407100A
Cited
US2681475A
Cited
US2746093A
Cited
US2890494A
Cited
GB779197A
Cited
US2891287A
Cited
US2950508A
Cited
US2810936A
Cited
US2930084A
Cited
US2981986A
Cited
US2964803A
Cited
GB855949A
Cited
DE1097328B
Cited
US3099048A
Cited
FR1195177A
Cited
US3016460A
Cited
FR1237428A
Cited
GB891321A
Cited
US3113350A
Cited
GB979346A
Cited
DE1287484B
Cited
US3244863A
Cited
US3246916A
Cited
US3314114A
Cited
GB1135752A
Cited
US3440690A
Cited
US3827106A
Cited
US3557615A
Cited
US3703023A
Cited
SU401758A1
Cited
US3862473A
Cited
US3795851A
Cited
US3768122A
Cited
US4030082A
Cited
US3885232A
Cited
US3822590A
Cited
US4030635A
Cited
GB1443258A
Cited
DE2331217A1
Cited
GB1436029A
Cited
US3869759A
Cited
US3925850A
Cited
US3938223A
Cited
US4099297A
Cited
US4137487A
Cited
US4137487B1
Cited
US4051722A
Cited
US4163927A
Cited
US4369550A
Cited
US4653153A
Cited
US4864853A
Cited
US4812993A
Cited
DE3619248A1
Cited
US4819301A
Cited
US4864694A
Cited
US4860406A
Cited
US5014395A
Cited
US5052080A
Cited
US5018248A
Cited
US5230125A
Cited
EP0412448A1
Cited
US5134755A
Cited
US4974296A
Cited
US5412301A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1999-12-10 | 2000-06-10 | 2000-12-10 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2003-12-10 | 2004-06-10 | 2004-12-10 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2007-12-10 | 2008-06-10 | 2008-12-10 | $7700.00 | Window Closed / Lapsed |