Apparatus for control and evaluation of pending jobs in a factory

Assignee: Siemens Corp
•
Filing: 1995-11-22
•
Granted: 1996-09-24
•
Expires: 2015-11-22
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An improved system and method for scheduling a plurality of orders into a factory for processing by one or more of a plurality of machines located therein, based on the use of a Continuity Index job release strategy. The system and method is particularly addressed to the enhancement of such a job release strategy by introduction of Factory Profile and priority criteria and an algorithm for automatic determination of an optimum job release point based on such criteria. The scheduling methodology is characterized by defining a Continuity Index (CI) for each of the jobs as the ratio of the actual time the job is being processed by such one or more machines to the total time from release of the jobs into a shop wherein such machines are located until the completion of the job, establishing a Factory Profile curve of optimum CI value over time, determining a curve of actual CI for each of the jobs being tested for release beginning from a trial start date and extending through the expected completion of the job, comparing the actual CI curve for each of such jobs with the Factory Profile optimum CI curve and accepting the job for processing by the shop on the trial start date if the actual CI curve closely follows the Factory Profile curve throughout the processing time for the job, and otherwise determining a new curve of actual CI for the job from a new trial start date and repeating the comparison.

Inventors

  • 👤 Maryam S. Shahraray
  • 👤 Khosrow Hadavi

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 03:49
CPC Classifications
G; G06; G06Q; G06Q10/00; G06Q10/06; G05; G05B; G05B19/00; G05B19/02; G05B19/418; G05B19/41865; H; H10; H10P; H10P74/00; H10P74/23; G05B2219/00; G05B2219/30; G05B2219/32; G05B2219/32252

Claims Analysis

Total Claims: 9
Claim 1
Independent Claim 260 words
A factory for processing jobs-in-progress, and producing completed work, said factory comprising: a plurality of machines for receiving and processing ones of said jobs-in-progress and at least a portion of said plurality of machines having waiting queues, said machines providing status information relating to respective ones of said waiting queues; a source of orders; a source of user-selected job release criteria, said criteria including at least one of a respective utilization factor and a respective job on-time factor assigned to respective ones of said machines; storing means, responsive to said source of orders, for storing pending orders, and for releasing a selected order for inclusion in said jobs-in-progress in response to selection information; and means, responsive to information from said storing means, to said source of job release criteria and to said machine status information, for producing and revising said selection information so as to establish a Factory Profile curve of an optimum release strategy for said factory, determining a corresponding curve of predicted actual processing for each of said jobs from a trial start date through the expected completion of said job in said factory, comparing said actual job curve for each of said jobs with said Factory Profile optimum curve, and accepting said job for processing by said factory on said trial start date if said actual job curve closely follows said Factory Profile curve, within predefined bounds, throughout the processing time for said job, and otherwise determining a new curve of predicted actual processing for said job from a new trial start date and repeating said comparison.
Claim 2
Dependent Claim 260 words
A factory for processing jobs-in-progress, and producing completed work, said factory comprising: a plurality of machines for receiving and processing ones of said jobs-in-progress and at least a portion of said plurality of machines having waiting queues, said machines providing status information relating to respective ones of said waiting queues; a source of orders; a source of user-selected job release criteria, said criteria including at least one of a respective utilization factor and a respective job on-time factor assigned to respective ones of said machines; storing means, responsive to said source of orders, for storing pending orders, and for releasing a selected order for inclusion in said jobs-in-progress in response to selection information; and means, responsive to information from said storing means, to said source of job release criteria and to said machine status information, for producing and revising said selection information so as to establish a Factory Profile curve of an optimum release strategy for said factory, determining a corresponding curve of predicted actual processing for each of said jobs from a trial start date through the expected completion of said job in said factory, comparing said actual job curve for each of said jobs with said Factory Profile optimum curve, and accepting said job for processing by said factory on said trial start date if said actual job curve closely follows said Factory Profile curve, within predefined bounds, throughout the processing time for said job, and otherwise determining a new curve of predicted actual processing for said job from a new trial start date and repeating said comparison.
Claim 3
Dependent Claim 45 words
The factory of claim 1, wherein said selection information producing means further includes a means for determining a range enclosing said Factory Profile curve and wherein said acceptance criteria is satisfied if said actual job curve falls within said range enclosing said Factory Profile curve.
Claim 4
Dependent Claim 37 words
The factory of claim 2, wherein said selection information producing means further includes a means for adjusting said range about said Factory Profile curve to provide a wider range for jobs having a higher than normal priority.
Claim 5
Dependent Claim 424 words
The factory of claim 2, wherein said selection information producing means further includes a computational means for computing said start date for acceptance using a BestStartDate algorithm: ______________________________________ Let Ethmax be maximum Threshold Error Let Ethmin (E = Error) be minimum Threshold Error Emin <- Eth Emax <- 0 is the max error without going over the threshold value Sd <- Desired.sub.-- Sd (desired start date), SDc <- Sd, i.e. current Sd is originally set to the Desired.sub.-- Sd Nr, N1 no of right shifts and left shifts allowed Nr is a function of order priority, i.e. as order priority increases then Nr becomes smaller; N1 is a management- determined finished good inventory function, stating how early, in the worst case, completion of the order will be acceptable. Note that these two parameters decide on the boundaries of the search space. They can be either predefined or can be decided at the time of order entry. n is shift counter; +ve for right shifts & -ve for left shifts; n <- 0 Wc is the current window.sub.-- no w <- Wc Allocate: Set t <- end.sub.-- of(w) /* t the max time unit in w, e.g., last day of week w */ Allocate until t OR all steps done otherwise EXIT Evaluate e(t), where t is the end of current window If e(t) > Ethmin THEN BEGIN if e(t) < Emin THEN BestSD <- SDc, Emin <- e(t); /*else the previous SD was better*/ find.sub.-- a.sub.-- better.sub.-- sd; auto allocate i END-begin ELSE /* error term is still smaller than threshold */ BEGIN w <- w+1 Emax <- e(t) GOTO allocate END-begin; If e(t) > Ethmax THEN warning: Promised due date is too good for this priority class; print(BestSD, Emin, Emax); END BestStartDate. PROCEDURE find.sub.-- a.sub.-- better.sub.-- sd: If n=<0 & n>N1 THEN shiftleftORright(-) /* note that N1 is a -ve number */ Else IF n<Nr THEN shiftleftORright(+); ELSE /* UNSUCCESSFUL release */ DO ONE OF THE FOLLOWING Increase job's priority; not recommended if done too often; Decrease job's priority, i.e., increasing Nr the search space this is relaxing constraints; Decrease(make more negative) N1, this is also relaxing WIP constraint; Suspend release until a later time; Other alternatives are changing Eth and CI* etc but these are not recommended since they would have a global effect. END-else; END.sub.-- find.sub.-- a better.sub.-- sd. PROCEDURE shiftleftORright (.sup.˜): /* .sup.˜ is - if shiftleft and + if shiftright */ n <- n.sup.˜ 1 w <- w.sup.˜ 1 Wc <- w SDc <- max(starttime(w), Today) END shiftleftORright. ______________________________________
Claim 6
Dependent Claim 14 words
The factory of claim 2, wherein said selection information producing means comprises a computer.
Claim 7
Dependent Claim 18 words
The factory of claim 2, wherein said order storing means comprises a data base stored on a computer.
Claim 8
Dependent Claim 22 words
The factory of claim 2, wherein said selection information producing means and said order storing means are comprised on the same computer.
Claim 9
Dependent Claim 26 words
The factory of claim 2, wherein said machines are controlled by a computer system directly connected to said information producing means and order storing means computer.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1999-09-24 2000-03-25 2000-09-24 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2003-09-24 2004-03-25 2004-09-24 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2007-09-24 2008-03-25 2008-09-24 $7700.00 Window Closed / Lapsed