Abstract

Abstract An automatic control for a power plant having a plurality of mutually interacting plant components includes an automation system shared by the plant components having automation devices executing various functions. The automation devices are connected to one another and to a master control unit through a data bus which transmits plant-relevant data. According to the invention the automation devices are combined in a manner corresponding to the technological structure of the plant to form mutually independently functional units. Each functional unit corresponds to a function chain which includes a plurality of subfunction devices. Each subfunction device includes a plurality of subsystems with controllable plant components.

Inventors

  • 👤 Fritz Loffel
  • 👤 Claudius Arnoldt

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 12:59
CPC Classifications
F; F01; F01K; F01K13/00; F01K13/02; G; G05; G05B; G05B19/00; G05B19/02; G05B19/18; G05B19/414; G05B2219/00; G05B2219/20; G05B2219/25; G05B2219/25314; G05B2219/25368

Claims Analysis

Total Claims: 5
Claim 1
Independent Claim 150 words
In combination with a power plant having a plurality of mutually interacting controllable power plant components, an automatic power plant control system, comprising: a master control unit; a data bus connected to said master control unit; and function chains including automation devices each having a plurality of subfunction devices, said automation devices being combined into mutually independent functional units corresponding to a technological structure of the power plant, said automation devices executing various functions in an automation system shared by the power plant components, and said automation devices being connected to one another and to said master control unit by said data bus for transmitting data relevant to the power plant; said function chains each including a common data line linking said subfunction devices and transmitting only data relevant for one functional unit; and each of said subfunction devices including a plurality of subsystems having the controllable power plant components.
Claim 2
Dependent Claim 150 words
In combination with a power plant having a plurality of mutually interacting controllable power plant components, an automatic power plant control system, comprising: a master control unit; a data bus connected to said master control unit; and function chains including automation devices each having a plurality of subfunction devices, said automation devices being combined into mutually independent functional units corresponding to a technological structure of the power plant, said automation devices executing various functions in an automation system shared by the power plant components, and said automation devices being connected to one another and to said master control unit by said data bus for transmitting data relevant to the power plant; said function chains each including a common data line linking said subfunction devices and transmitting only data relevant for one functional unit; and each of said subfunction devices including a plurality of subsystems having the controllable power plant components.
Claim 3
Dependent Claim 40 words
The automatic control according to claim 1, wherein: said function chains are linked in a predetermined sequence during a start-up operation and a shut-down operation of the plant; and said function chains are individually activatable during operation of the plant.
Claim 4
Dependent Claim 41 words
The automatic control according to claim 1, including data lines connected to said function chains, and data-selectively acting coupling elements connecting said data lines to said data bus for linking said function chains to one another and to the data bus.
Claim 5
Dependent Claim 61 words
The automatic control according to claim 1, wherein said function chains are hierarchically organized corresponding to the following logical process sequence of the plant: a) supply, b) disposal, c) transport of waste process heat and return transport of condensate, d) transport of process heat, e) conversion of primary energy into thermal energy, and f) conversion of thermal energy into electrical energy.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1999-09-17 2000-03-18 2000-09-17 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2003-09-17 2004-03-18 2004-09-17 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2007-09-17 2008-03-18 2008-09-17 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag