Patent US5469362A successfully refreshed from Google Patents.
US5469362A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Dispatching method and apparatus for monitoring scheduled mail
Assignee: Pitney Bowes Inc
•
Filing: 1994-05-16
•
Granted: 1995-11-21
•
Expires: 2014-05-16
Abstract
Abstract Method and apparatus for monitoring the dispatching of mail and to coordinate the production of mail with common carrier dispatch schedules. The mail is produced in a sequence that is intended to meet the dispatch schedule of common carriers. The movement of mail is monitored and the scheduling of mail production is altered if consistent mail delivery irregularities are determined.
Inventors
- 👤 William M. Hunt
- 👤 Ronald P. Sansone
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-09 14:29
CPC Classifications
G; G06; G06Q; G06Q10/00; G06Q10/08; G07; G07B; G07B17/00; G07B17/00185; G07B17/00362; G07B17/00459; G07B17/00467; G07B2017/00427; G07B2017/00483
Claims Analysis
Total Claims: 9
Claim 1
Independent Claim
189 words
A mail monitoring system for scheduled dispatchment of mail to the postal service via common carrier, the combination comprising: a mail production facility for printing addresses on a mailpiece, assembling one or more inserts into a mailpiece, determining the postage of each mailpiece and assembling similar destination mailpieces in the same tray; a first processor having mail lists therein in communication with said mail production facility; said first processor controls the printing of addresses on the mailpiece; a second processor having a common carrier dispatching schedule therein in communication with said first processor and said mail production facility; a tray collection unit for receiving mailpieces assembled in trays from said mail production facility; a common carrier for receiving trayed mail from said tray collection unit; and a third processor in communication with said common carrier and said second processor for monitoring the receipt of trayed mail by said common carrier and comparing the receipt of the trayed mail by the common carrier with the dispatching schedule of said second processor to maintain the synchronization of the schedule of said carrier with the mail printed by said mail production facility.
Claim 2
Dependent Claim
189 words
A mail monitoring system for scheduled dispatchment of mail to the postal service via common carrier, the combination comprising: a mail production facility for printing addresses on a mailpiece, assembling one or more inserts into a mailpiece, determining the postage of each mailpiece and assembling similar destination mailpieces in the same tray; a first processor having mail lists therein in communication with said mail production facility; said first processor controls the printing of addresses on the mailpiece; a second processor having a common carrier dispatching schedule therein in communication with said first processor and said mail production facility; a tray collection unit for receiving mailpieces assembled in trays from said mail production facility; a common carrier for receiving trayed mail from said tray collection unit; and a third processor in communication with said common carrier and said second processor for monitoring the receipt of trayed mail by said common carrier and comparing the receipt of the trayed mail by the common carrier with the dispatching schedule of said second processor to maintain the synchronization of the schedule of said carrier with the mail printed by said mail production facility.
Claim 3
Dependent Claim
29 words
The mail production system of claim 1 wherein said third processor also is in communication with said mail production facility for monitoring the actual schedule of said common carrier.
Claim 4
Dependent Claim
19 words
The mail production system of claim 2 further including said second processor being in communication with the postal service.
Claim 5
Independent Claim
132 words
A method of monitoring and scheduling dispatch merit of mail via common carriers, the steps comprising: a) printing a plurality of mail piece runs in sequence in accordance with the zip codes of the mail runs and a dispatch schedule, b) determining if there has been a delay in the actual schedule of a common carrier and the dispatch schedule cannot be met, c) rearranging the sequence of mail piece runs if there has been a delay, d) sending the mail piece runs to a common carrier, e) determining if the time of a mail run arriving at the common carrier is prior to the scheduled dispatch time, and f) rearranging the dispatch schedule if the time of arrival of said mail run does not arrive prior to the scheduled dispatch time.
Claim 6
Independent Claim
132 words
A method of monitoring and scheduling dispatch merit of mail via common carriers, the steps comprising: a) printing a plurality of mail piece runs in sequence in accordance with the zip codes of the mail runs and a dispatch schedule, b) determining if there has been a delay in the actual schedule of a common carrier and the dispatch schedule cannot be met, c) rearranging the sequence of mail piece runs if there has been a delay, d) sending the mail piece runs to a common carrier, e) determining if the time of a mail run arriving at the common carrier is prior to the scheduled dispatch time, and f) rearranging the dispatch schedule if the time of arrival of said mail run does not arrive prior to the scheduled dispatch time.
Claim 7
Independent Claim
32 words
The method 4, further comprising the step of conducting a post analysis after the production run ends to determine if the production schedule is timed so as to meet the dispatch schedule.
Claim 8
Independent Claim
32 words
The method 4, further comprising the step of conducting a post analysis after the production run ends to determine if the production schedule is timed so as to meet the dispatch schedule.
Claim 9
Dependent Claim
44 words
The method of claim 4 further comprising monitoring the production of mail runs to determine if a delay has been experienced in the mail production and rearranging the production schedule so as to conform to the dispatch schedule when a delay has been determined.
References Cited (Backward Citations)
US3321613A
Cited
US4346446A
Cited
US4807108A
Cited
US4807108B1
Cited
US5142482A
Cited
US5216620A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1998-11-20 | 1999-05-22 | 1999-11-21 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2002-11-20 | 2003-05-22 | 2003-11-21 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2006-11-20 | 2007-05-22 | 2007-11-21 | $7700.00 | Window Closed / Lapsed |