Inference planning system

Assignee: Panasonic Holdings Corp
•
Filing: 1994-02-08
•
Granted: 1995-08-15
•
Expires: 2014-02-08
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Data for production planning is input by an input device 3 and stored in a data base 1 for planning. Knowledge for planning is also input by the input device 3 and stored in a knowledge base 2 for planning. An inference engine 6 automatically makes and modifies the production plan. The plan made by the inference engine 6 is stored in a data base 17 of inference result. An intelligent editor 15 makes a plan free of inconsistencies through the input device 3. The Inference result of planning of the intelligent editor is also stored in the data base 17 of inference result. Data in the data base 1 and in the data base 17 of inference result is either indicated on a display 16 or printed on paper by a printer 22. As a result, it is possible to make a reliable plan and realize planning having wide extent of utilization.

Inventors

  • 👤 Masayuki Tanaka
  • 👤 Hirokazu Kominami

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 08:51
CPC Classifications
G; G06; G06F; G06F17/00; G05; G05B; G05B19/00; G05B19/02; G05B19/418; G05B19/41865; Y; Y02; Y02P; Y02P90/00; Y02P90/02; Y10; Y10S; Y10S706/00; Y10S706/902; Y10S706/919

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 210 words
A method of performing inference planning comprising the steps of: storing, in a data base storing means, production planning data of a production plan and data for changing said production planning data; storing, in a knowledge base storing means, data of procedures which are necessary to make said production plan and to change said production plan and are expressed by a rule type format; inputting said production planning data and said data for changing said production planning data into said data base storing means; inputting said data of procedures into said knowledge base storing means; producing said production plan in accordance with said production planning data and said data of procedures, by following the steps of: developing a plan of a manufacturing process, calculating a reference value, allocating an operation period to a facility in which the manufacturing process will be carried out, and calculating an estimation value, wherein a limited part of said plan may be planned and changed by the steps of: searching a part of said plan which is influenced by the data of change, deleting said part for changing, and returning a new plan to first processing means for planning, temporarily storing said production plan produced by a central processing unit, and outputting said production plan.
Claim 2
Independent Claim 210 words
A method of performing inference planning comprising the steps of: storing, in a data base storing means, production planning data of a production plan and data for changing said production planning data; storing, in a knowledge base storing means, data of procedures which are necessary to make said production plan and to change said production plan and are expressed by a rule type format; inputting said production planning data and said data for changing said production planning data into said data base storing means; inputting said data of procedures into said knowledge base storing means; producing said production plan in accordance with said production planning data and said data of procedures, by following the steps of: developing a plan of a manufacturing process, calculating a reference value, allocating an operation period to a facility in which the manufacturing process will be carried out, and calculating an estimation value, wherein a limited part of said plan may be planned and changed by the steps of: searching a part of said plan which is influenced by the data of change, deleting said part for changing, and returning a new plan to first processing means for planning, temporarily storing said production plan produced by a central processing unit, and outputting said production plan.
Claim 3
Dependent Claim 59 words
The method of inference planning of claim 1, wherein said method further comprises the steps of: estimating whether results of inference stored in working memory can function as said production plan without a predetermined level of inconvenience; and reconstructing said knowledge base storing means when an estimating means estimates that said results of inference cannot function without said inconvenience.
Claim 4
Dependent Claim 70 words
The method of inference planning of claim 1, wherein said method further comprises the steps of: collecting production results data and facilities state data, said facilities state data representing operations of existing production facilities; formatting and storing said production results data and said facilities state data into said data base storing means; and changing said production plan in accordance with said stored production results data and said facilities state data.
Claim 5
Dependent Claim 73 words
The method of inference planning of claim 1, wherein said method further comprises the step of utilizing said data base by the steps of: reconstructing said data base storing means as a structured data base, said structured database maintaining a relation between said planning data stored in said data base storing means and planning data input by an input device; and providing data from said data base storing means to an inference engine.
Claim 6
Dependent Claim 61 words
The method of inference planning of claim 1, wherein said method further comprises utilizing said knowledge base by the steps of: constructing data input into said knowledge base storing means from an input device to form a structured knowledge base for planning; and providing knowledge from said knowledge base storing means to an inference engine in accordance with a planning situation.
Claim 7
Dependent Claim 53 words
The method of inference planning of claim 1, wherein said method further comprises the steps of: changing said production plan in response to said changing data input by an input device; and searching and modifying a limited part of results of said inference, said limited part being affected by said input changing data.
Claim 8
Dependent Claim 114 words
The method of inference planning of claim 1, wherein said method further comprises the steps of: storing results of said inference from a working memory in an inference result data base; and interfacing with said data base, said step of interfacing comprising the steps of: outputting data from said data base in accordance with data input from an input device, providing a graphic output of said results of said inference from said inference result data base, said graphic output being provided in accordance with said data input from said input device, and simulating said results of inference data from said inference result data base in accordance with said data input from said input device.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1998-08-14 1999-02-13 1999-08-15 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2002-08-14 2003-02-13 2003-08-15 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2006-08-14 2007-02-13 2007-08-15 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag