Method for determining flexible demand in a manufacturing process

Assignee: Demand Flow Institute LLC
•
Filing: 1994-06-16
•
Granted: 1995-08-08
•
Expires: 2014-06-16
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A system that determines the total demand for a product for each day over four time periods specified by the user of the system. Within the first time period, from the current date up to a demand fence, the total demand cannot be altered. For the next three periods, called the flex fence periods, the total demand for each day can vary by a percentage amount set by the user. If an order exceeding capacity is received for a date beyond the demand fence, the system will recalculate total demand for all days beyond the demand fence and prior to the order date to attempt to produce the total demand quantity necessary to fulfill the order. In calculating the increased quantities, the system uses a formula that prevents the total demand quantity for any day from exceeding the amount of material that was ordered for that day.

Inventors

  • 👤 John R. Costanza

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 20:57
CPC Classifications
G; G06; G06Q; G06Q10/00; G06Q10/06; G06Q10/063; G06Q10/0631; G06Q10/06315

Claims Analysis

Total Claims: 4
Claim 1
Independent Claim 327 words
In a computerized manufacturing system, a computer implemented method for determining a production quantity for a plurality of flex periods, and ordering material for said production quantity during said plurality of flex periods, said method comprising: (a) accepting a quantity of flex periods from a user of the system and assigning each flex period a sequential number, wherein said flex periods occur after a demand fence date; (b) accepting a daily rate total demand from the user of the system, wherein said daily rate total demand equals said production quantity at said demand fence date; (c) accepting a flex period percentage for each of said flex periods from the user; (d) accepting a flex period number of days, one said flex period number of days for each said flex periods; (e) calculating a flex period total demand for each of said flex periods, comprising the steps of (e1) calculating a first multiplier by dividing said flex period percentage for said flex period by one-hundred and adding one to a result of said dividing to produce said first multiplier, (e2) calculating a second multiplier by raising said first multiplier to the power of said sequential number assigned to said flex period in step (a), and (e3) calculating said flex period total demand for said flex period by multiplying said second multiplier by said daily rate total demand, and (e4) assigning said flex period total demand to each day of said flex period; (f) accepting at least one customer order from a user of said system; (g) for each said customer order accepted, increasing said production quantity for all days in each of said flex periods prior to a day of said customer order and after said flex fence date, wherein said production quantity for each of said days does not exceed said flex period total demand set for said day; and (h) placing an order for material for said production quantity for each of said flex fence periods.
Claim 2
Dependent Claim 327 words
In a computerized manufacturing system, a computer implemented method for determining a production quantity for a plurality of flex periods, and ordering material for said production quantity during said plurality of flex periods, said method comprising: (a) accepting a quantity of flex periods from a user of the system and assigning each flex period a sequential number, wherein said flex periods occur after a demand fence date; (b) accepting a daily rate total demand from the user of the system, wherein said daily rate total demand equals said production quantity at said demand fence date; (c) accepting a flex period percentage for each of said flex periods from the user; (d) accepting a flex period number of days, one said flex period number of days for each said flex periods; (e) calculating a flex period total demand for each of said flex periods, comprising the steps of (e1) calculating a first multiplier by dividing said flex period percentage for said flex period by one-hundred and adding one to a result of said dividing to produce said first multiplier, (e2) calculating a second multiplier by raising said first multiplier to the power of said sequential number assigned to said flex period in step (a), and (e3) calculating said flex period total demand for said flex period by multiplying said second multiplier by said daily rate total demand, and (e4) assigning said flex period total demand to each day of said flex period; (f) accepting at least one customer order from a user of said system; (g) for each said customer order accepted, increasing said production quantity for all days in each of said flex periods prior to a day of said customer order and after said flex fence date, wherein said production quantity for each of said days does not exceed said flex period total demand set for said day; and (h) placing an order for material for said production quantity for each of said flex fence periods.
Claim 3
Dependent Claim 42 words
The computer implemented method of claim 1 wherein step (g2) further comprises the steps of: (g2a) increasing said production quantity starting with said day of said customer order and increasing said production quantity for previous days until said customer order is satisfied.
Claim 4
Dependent Claim 65 words
The computer implemented method of claim 2 wherein step (g2a) further comprises the step of increasing said production quantity for each sequentially previous day, starting with said day of said customer order, to a maximum allowed amount within said flex period total demand for each sequentially previous day, until a total amount of increase in said production quantity equals an amount of said customer order.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1998-08-07 1999-02-06 1999-08-08 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2002-08-07 2003-02-06 2003-08-08 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2006-08-07 2007-02-06 2007-08-08 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag