Claims Analysis
Total Claims: 28
Claim 1
Independent Claim
89 words
A method of constructing a bridge comprising: (a) spanning a region to be covered with elongated U-shaped precast prestressed concrete elements having legs mutually spaced so as to define regions for containing the concrete of beams, (b) supporting said elements only at opposite ends thereof, thereby permitting traffic to pass under the elements without being obstructed, (c) pouring concrete beams into said regions, (d) reinforcing said beams as structural supports for said bridge, (e) exposed surfaces of said concrete elements having a smooth surface finished to a polished quality.
Claim 2
Independent Claim
89 words
A method of constructing a bridge comprising: (a) spanning a region to be covered with elongated U-shaped precast prestressed concrete elements having legs mutually spaced so as to define regions for containing the concrete of beams, (b) supporting said elements only at opposite ends thereof, thereby permitting traffic to pass under the elements without being obstructed, (c) pouring concrete beams into said regions, (d) reinforcing said beams as structural supports for said bridge, (e) exposed surfaces of said concrete elements having a smooth surface finished to a polished quality.
Claim 3
Dependent Claim
17 words
A method as defined in claim 1 in which exposed edges of said precast elements are rounded.
Claim 4
Independent Claim
108 words
A method of constructing a bridge comprising: (a) spanning a region to be covered with elongated U-shaped precast prestressed concrete elements having legs mutually spaced so as to define regions for containing the concrete of beams, (b) supporting said elements only at opposite ends thereof, thereby permitting traffic to pass under the elements without being obstructed, (c) spanning and closing the bottoms of the regions between the precast elements with permanent precast concrete formwork, the precast concrete formwork being permanently held in place from the legs of the precast elements, (c) pouring concrete beams into said regions, and (d) reinforcing said beams as structural supports for said bridge.
Claim 5
Independent Claim
108 words
A method of constructing a bridge comprising: (a) spanning a region to be covered with elongated U-shaped precast prestressed concrete elements having legs mutually spaced so as to define regions for containing the concrete of beams, (b) supporting said elements only at opposite ends thereof, thereby permitting traffic to pass under the elements without being obstructed, (c) spanning and closing the bottoms of the regions between the precast elements with permanent precast concrete formwork, the precast concrete formwork being permanently held in place from the legs of the precast elements, (c) pouring concrete beams into said regions, and (d) reinforcing said beams as structural supports for said bridge.
Claim 6
Independent Claim
110 words
A method of constructing a bridge comprising: (a) spanning a region to be covered with elongated U-shaped precast prestressed concrete elements having legs mutually spaced so as to define regions for containing the concrete of beams, (b) supporting opposite ends of said elements, (c) pouring concrete beams into said regions, (d) reinforcing said beams as structural supports for said bridge, (e) spanning and closing the bottoms of the regions between the precast elements with temporary formwork or permanent precast concrete formwork prior to pouring the concrete beams, and (f) said spanning and closing step being comprised of suspending the formwork by cables hung through the region between said precast elements.
Claim 7
Independent Claim
110 words
A method of constructing a bridge comprising: (a) spanning a region to be covered with elongated U-shaped precast prestressed concrete elements having legs mutually spaced so as to define regions for containing the concrete of beams, (b) supporting opposite ends of said elements, (c) pouring concrete beams into said regions, (d) reinforcing said beams as structural supports for said bridge, (e) spanning and closing the bottoms of the regions between the precast elements with temporary formwork or permanent precast concrete formwork prior to pouring the concrete beams, and (f) said spanning and closing step being comprised of suspending the formwork by cables hung through the region between said precast elements.
Claim 8
Independent Claim
119 words
A method of constructing a bridge comprising: (a) spanning a region to be covered with elongated U-shaped precast prestressed concrete elements having legs mutually spaced so as to define regions for containing the concrete of beams, (b) supporting said elements only at opposite ends thereof, thereby permitting traffic to pass under the elements without being obstructed, (c) pouring concrete beams into said regions, (d) reinforcing said beams as structural supports for said bridge, (e) spanning and closing the bottoms of the regions between the precast elements with temporary formwork or permanent precast concrete formwork prior to pouring the concrete beams, and (f) all exterior exposed surfaces of the precast elements and precast formwork being finished to a polished quality.
Claim 9
Independent Claim
119 words
A method of constructing a bridge comprising: (a) spanning a region to be covered with elongated U-shaped precast prestressed concrete elements having legs mutually spaced so as to define regions for containing the concrete of beams, (b) supporting said elements only at opposite ends thereof, thereby permitting traffic to pass under the elements without being obstructed, (c) pouring concrete beams into said regions, (d) reinforcing said beams as structural supports for said bridge, (e) spanning and closing the bottoms of the regions between the precast elements with temporary formwork or permanent precast concrete formwork prior to pouring the concrete beams, and (f) all exterior exposed surfaces of the precast elements and precast formwork being finished to a polished quality.
Claim 10
Independent Claim
124 words
A method of constructing a bridge comprising: (a) spanning a region to be covered with V-shaped precast prestressed elements for creating and providing permanent formwork of poured concrete beams and a permanent protective layer around said beams and finished surfaces between said beams, (b) supporting said elements only at opposite ends thereof, thereby permitting traffic to pass under the elements without being obstructed, (c) pouring concrete beams into the formwork, (d) reinforcing said beams as structural supports for said bridge, (e) the spaces between the elements being closed by said elements, (f) the elements having arms extending outwardly therefrom, abutting adjacent arms of adjacent elements, the elements being elongated and container shaped for receiving and retaining beam concrete and defining shapes of the beams.
Claim 11
Independent Claim
124 words
A method of constructing a bridge comprising: (a) spanning a region to be covered with V-shaped precast prestressed elements for creating and providing permanent formwork of poured concrete beams and a permanent protective layer around said beams and finished surfaces between said beams, (b) supporting said elements only at opposite ends thereof, thereby permitting traffic to pass under the elements without being obstructed, (c) pouring concrete beams into the formwork, (d) reinforcing said beams as structural supports for said bridge, (e) the spaces between the elements being closed by said elements, (f) the elements having arms extending outwardly therefrom, abutting adjacent arms of adjacent elements, the elements being elongated and container shaped for receiving and retaining beam concrete and defining shapes of the beams.
Claim 12
Dependent Claim
28 words
A method as defined in claim 6 including the further step of pouring a concrete deck over said beams and the exterior top sides of said precast elements.
Claim 13
Independent Claim
162 words
A method of constructing a bridge comprising: (a) spanning a region to be covered with elongated U-shaped precast prestressed concrete elements having legs mutually spaced so as to define regions for containing the concrete of beams, (b) supporting said elements only at opposite ends thereof, thereby permitting traffic to pass under the elements without being obstructed, (c) pouring concrete beams into said regions, (d) reinforcing said beams as structural supports for said bridge, (e) supporting a pair of precast prestressed architecturally shaped side beam-defining permanent formwork at edges of outwardly opposite legs of said elements to define a beam space between each formwork of said pair of formwork and an adjacent element, and pouring concrete beams into said beam spaces, (f) pouring a concrete deck over said beams and exterior top sides of said precast elements, but avoiding top edges of said pair of formwork, whereby at least one of curb, rail and utility supporting surfaces for said bridge are provided thereby.
Claim 14
Independent Claim
162 words
A method of constructing a bridge comprising: (a) spanning a region to be covered with elongated U-shaped precast prestressed concrete elements having legs mutually spaced so as to define regions for containing the concrete of beams, (b) supporting said elements only at opposite ends thereof, thereby permitting traffic to pass under the elements without being obstructed, (c) pouring concrete beams into said regions, (d) reinforcing said beams as structural supports for said bridge, (e) supporting a pair of precast prestressed architecturally shaped side beam-defining permanent formwork at edges of outwardly opposite legs of said elements to define a beam space between each formwork of said pair of formwork and an adjacent element, and pouring concrete beams into said beam spaces, (f) pouring a concrete deck over said beams and exterior top sides of said precast elements, but avoiding top edges of said pair of formwork, whereby at least one of curb, rail and utility supporting surfaces for said bridge are provided thereby.
Claim 15
Dependent Claim
129 words
A bridge comprised of precast, prestressed elongated U-shaped concrete elements, the elements each having two ends and being supported only at their ends by abutments at the sides of a spanned region during bridge construction, the elements having spaced legs, poured reinforced concrete beams contained by the legs of the elements or between the legs of adjacent ones of said elements, a deck supported by the beams and said elongated elements, precast prestressed architecturally shaped permanent formwork forming architectural sides to the bridge, extending at the sides of opposite ones of said elements and containing poured concrete beams between said opposite elements and said architecturally shaped formwork, and a traffic barrier extending upwardly from and integral with upper edges of at least one of said architecturally shaped permanent formwork.
Claim 16
Dependent Claim
129 words
A bridge comprised of precast, prestressed elongated U-shaped concrete elements, the elements each having two ends and being supported only at their ends by abutments at the sides of a spanned region during bridge construction, the elements having spaced legs, poured reinforced concrete beams contained by the legs of the elements or between the legs of adjacent ones of said elements, a deck supported by the beams and said elongated elements, precast prestressed architecturally shaped permanent formwork forming architectural sides to the bridge, extending at the sides of opposite ones of said elements and containing poured concrete beams between said opposite elements and said architecturally shaped formwork, and a traffic barrier extending upwardly from and integral with upper edges of at least one of said architecturally shaped permanent formwork.
Claim 17
Dependent Claim
134 words
A bridge comprised of precast, prestressed elongated U-shaped concrete elements, the elements each having two ends and being supported only at their ends by abutments at the sides of a spanned region during bridge construction, the elements having spaced legs, poured reinforced concrete beams contained by the legs of the elements or between the legs of adjacent ones of said elements, a deck supported by the beams and said elongated elements, precast prestressed architecturally shaped permanent formwork forming architectural sides to the bridge, extending at the sides of opposite ones of said elements and containing poured concrete beams between said opposite elements and said architecturally shaped formwork, and in which said architecturally shaped permanent formwork is abutted adjacent bottom edges of said elongated elements against arms extending from said opposite ones of said elements.
Claim 18
Dependent Claim
134 words
A bridge comprised of precast, prestressed elongated U-shaped concrete elements, the elements each having two ends and being supported only at their ends by abutments at the sides of a spanned region during bridge construction, the elements having spaced legs, poured reinforced concrete beams contained by the legs of the elements or between the legs of adjacent ones of said elements, a deck supported by the beams and said elongated elements, precast prestressed architecturally shaped permanent formwork forming architectural sides to the bridge, extending at the sides of opposite ones of said elements and containing poured concrete beams between said opposite elements and said architecturally shaped formwork, and in which said architecturally shaped permanent formwork is abutted adjacent bottom edges of said elongated elements against arms extending from said opposite ones of said elements.
Claim 19
Dependent Claim
22 words
A bridge as defined in claim 10, in which the deck is contained between upper edges of said architecturally shaped permanent formwork.
Claim 20
Dependent Claim
22 words
A bridge as defined in claim 11, including utility structures extending upwardly from the upper edges of said architecturally shaped permanent formwork.
Claim 21
Dependent Claim
92 words
A bridge comprised of precast, prestressed elongated U-shaped concrete elements, the elements each having two ends and being supported only at their ends by abutments at the sides of a spanned region during bridge construction, the elements having spaced legs, poured reinforced concrete beams contained by the legs of the elements or between the legs of adjacent ones of said elements, a deck supported by the beams and said elongated elements, at least one of said elements being supported right side up on said deck to form a walkway, or traffic barrier.
Claim 22
Dependent Claim
92 words
A bridge comprised of precast, prestressed elongated U-shaped concrete elements, the elements each having two ends and being supported only at their ends by abutments at the sides of a spanned region during bridge construction, the elements having spaced legs, poured reinforced concrete beams contained by the legs of the elements or between the legs of adjacent ones of said elements, a deck supported by the beams and said elongated elements, at least one of said elements being supported right side up on said deck to form a walkway, or traffic barrier.
Claim 23
Independent Claim
171 words
A method of forming a bridge comprising at least one arch and cantilevered arms, the arch having opposite sides and a length defined between opposite ends, the cantilevered arms extending from opposite sides of the at least one arch over the length of the at least one arch over a region to be spanned, said method comprising the steps of: supporting at least one permanent elongated precast concrete element only at the opposite ends of said at least one arch, thereby allowing traffic to pass underneath said at least one permanent elongated precast concrete element without obstruction, said at least one permanent elongated precast concrete element defining at least two containers for containing concrete of at least a pair of beams; pouring said concrete beams and arms and a deck over said beams and arms before the concrete of the beams has cured; and retaining said at least one element in place as a protective surface of said bridge, in which the beams and deck are poured in a single step.
Claim 24
Independent Claim
171 words
A method of forming a bridge comprising at least one arch and cantilevered arms, the arch having opposite sides and a length defined between opposite ends, the cantilevered arms extending from opposite sides of the at least one arch over the length of the at least one arch over a region to be spanned, said method comprising the steps of: supporting at least one permanent elongated precast concrete element only at the opposite ends of said at least one arch, thereby allowing traffic to pass underneath said at least one permanent elongated precast concrete element without obstruction, said at least one permanent elongated precast concrete element defining at least two containers for containing concrete of at least a pair of beams; pouring said concrete beams and arms and a deck over said beams and arms before the concrete of the beams has cured; and retaining said at least one element in place as a protective surface of said bridge, in which the beams and deck are poured in a single step.
Claim 25
Independent Claim
171 words
A method of forming a bridge comprising at least one arch and cantilevered arms, the arch having opposite sides and a length defined between opposite ends, the cantilevered arms extending from opposite sides of the at least one arch over the length of the at least one arch over a region to be spanned, said method comprising the steps of: supporting at least one permanent elongated precast concrete element only at the opposite ends of said at least one arch, thereby allowing traffic to pass underneath said at least one permanent elongated precast concrete element without obstruction, said at least one permanent elongated precast concrete element defining at least two containers for containing concrete of at least a pair of beams; pouring said concrete beams and arms and a deck over said beams and arms before the concrete of the beams has cured; and retaining said at least one element in place as a protective surface of said bridge, in which said element is formed of plural abutting architecturally shaped segments.
Claim 26
Independent Claim
171 words
A method of forming a bridge comprising at least one arch and cantilevered arms, the arch having opposite sides and a length defined between opposite ends, the cantilevered arms extending from opposite sides of the at least one arch over the length of the at least one arch over a region to be spanned, said method comprising the steps of: supporting at least one permanent elongated precast concrete element only at the opposite ends of said at least one arch, thereby allowing traffic to pass underneath said at least one permanent elongated precast concrete element without obstruction, said at least one permanent elongated precast concrete element defining at least two containers for containing concrete of at least a pair of beams; pouring said concrete beams and arms and a deck over said beams and arms before the concrete of the beams has cured; and retaining said at least one element in place as a protective surface of said bridge, in which said element is formed of plural abutting architecturally shaped segments.
Claim 27
Independent Claim
174 words
A method of forming a bridge comprising at least one arch and cantilevered arms, the arch having opposite sides and a length defined between opposite ends, the cantilevered arms extending from opposite sides of the at least one arch over the length of the at least one arch over a region to be spanned, said method comprising the steps of: supporting at least one permanent elongated precast concrete element only at the opposite ends of said at least one arch, thereby allowing traffic to pass underneath said at least one permanent elongated precast concrete element without obstruction, said at least one permanent elongated precast concrete element defining at least two containers for containing concrete of at least a pair of beams; pouring said concrete beams and arms and a deck over said beams and arms before the concrete of the beams has cured; and retaining said at least one element in place as a protective surface of said bridge, in which said arch is formed of a pair of identical abutting architecturally shaped elements.
Claim 28
Independent Claim
174 words
A method of forming a bridge comprising at least one arch and cantilevered arms, the arch having opposite sides and a length defined between opposite ends, the cantilevered arms extending from opposite sides of the at least one arch over the length of the at least one arch over a region to be spanned, said method comprising the steps of: supporting at least one permanent elongated precast concrete element only at the opposite ends of said at least one arch, thereby allowing traffic to pass underneath said at least one permanent elongated precast concrete element without obstruction, said at least one permanent elongated precast concrete element defining at least two containers for containing concrete of at least a pair of beams; pouring said concrete beams and arms and a deck over said beams and arms before the concrete of the beams has cured; and retaining said at least one element in place as a protective surface of said bridge, in which said arch is formed of a pair of identical abutting architecturally shaped elements.