Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
125 words
A method of controlling the position of a floating screed of a paver during a paving operation comprising: monitoring the linear advance of the paver; periodically measuring the vertical distance of the screed with respect to a grade reference of a mat paved during the paving operation; computing an angle of deviation of the screed with respect to a distance of linear advance of the paver over a selected period of measurement; and adjusting an angle of attack of the screed with respect to the grade reference by an angular change of a magnitude which at least corresponds to and offsets the angle of deviation of the screed with respect to the distance of linear advance of the paver over the selected period of measurement.
Claim 2
Independent Claim
125 words
A method of controlling the position of a floating screed of a paver during a paving operation comprising: monitoring the linear advance of the paver; periodically measuring the vertical distance of the screed with respect to a grade reference of a mat paved during the paving operation; computing an angle of deviation of the screed with respect to a distance of linear advance of the paver over a selected period of measurement; and adjusting an angle of attack of the screed with respect to the grade reference by an angular change of a magnitude which at least corresponds to and offsets the angle of deviation of the screed with respect to the distance of linear advance of the paver over the selected period of measurement.
Claim 3
Dependent Claim
83 words
The method according to claim 1, wherein adjusting an angle of attack of the screed comprises adjusting the angle of attack of the screed by an angular change of a magnitude which exceeds the angle of deviation of the screed with respect to the distance of linear advance of the paver over the selected period of measurement by an angle that returns the screed to a predetermined reference slope over a selected number of periods of measurement of linear advance of the paver.
Claim 4
Dependent Claim
122 words
The method according to claim 1, wherein periodically measuring comprises periodically measuring the vertical distance of the screed with respect to a grade reference at one side of the screed, and computing an angle of deviation of the screed comprises computing an angle of deviation of the screed at said one side of the screed with respect to the linear advance of the paver, the method further comprising measuring at the screed a slope of the screed transversely to the direction of linear advance of the paver, and adjusting an angle of attack of the screed on one side of the screed with respect to that on the other side to maintain a predetermined slope transversely across the width of the screed.
Claim 5
Dependent Claim
68 words
The method according to claim 3, wherein adjusting an angle of attack of the screed on one side of the screed with respect to the other side comprises controlling an angular orientation relative to a horizontal of a pull arm on the one side of the screed with respect to an angular orientation relative to a horizontal of a pull arm on the other side of the screed.
Claim 6
Dependent Claim
149 words
The method according to claim 3, wherein adjusting an angle of attack of the screed on one side of the screed with respect to the other side comprises measuring a transverse slope of the screed as a slope angle, comparing the measured angle to a predetermined reference slope angle and determining from a comparison a deviation as an angle, changing the angle of deviation into a linear vertical deviation magnitude across a transverse width of the screed, determining from the linear vertical deviation magnitude an angle of deviation of one side of the screed with respect to the linear advance of the paver, and twisting one side of the screed with respect to the transversely other side of the screed by an angle of twist at least equal and opposite to the angle represented by the determined angle of deviation with respect to the linear advance of the paver.
Claim 7
Dependent Claim
73 words
The method according to claim 5, wherein twisting one side of the screed with respect to the transversely other side of the screed comprises changing the orientation of a pull arm on the one side of the screed with respect to the orientation of a pull arm on the other side of the screed by the angular twist at least equal and opposite to the angle represented by the determined rate of deviation.