Patent US5315499A successfully refreshed from Google Patents.
← Back to Patent Explorer
US5315499A Expired / Lapsed US ⏱️ 0.0 years remaining

Computer-controlled circuit breaker energy management arrangement having reliable memory and clock

Assignee: Schneider Electric USA Inc
•
Filing: 1992-06-19
•
Granted: 1994-05-24
•
Expires: 2012-06-19
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An energy management loadpanel arrangement includes a load panel enclosure having a plurality of circuit breakers, each of which opens and closes in response to a control signal so as to interrupt an associated current path. A microcomputer generates the control signals to control the position of the circuit breakers and their associated current paths, and a volatile memory circuit, for example, RAM, stores time-event data which is used to indicate when the control signals should be generated. A charged electronic double-layered capacitor is coupled to the volatile memory so that, in the event of a power outage, operating power is provided to the volatile memory for extended periods of time. In this manner, the time-event data is retained during the power outage so that the circuit breakers are timely controlled, despite the power outage, in response to said control signals. A real time clock circuit is used to track the time, and the charged electronic double-layered capacitor is coupled to the real time clock circuit so that it also continues to operate during a power outage. The microcomputer is then used to periodically store an image of the current time, from the real time clock, in RAM during normal operation, so that after a power outage and when the microcomputer 120 recovers therefrom, the current value of the real time clock can be compared against this value stored in RAM and the microcomputer's duration timers can be corrected.

Inventors

  • 👤 Ron J. Bilas
  • 👤 Drew A. Reid
  • 👤 Martin J. Wittrock

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 21:49
CPC Classifications
H; H02; H02J; H02J3/00; H02J3/04; H02J3/06; H02B; H02B1/00; H02B1/26; H02B1/40; H02B1/42; H02B11/00; H02B11/02; H02J13/00; H02J13/13; H02J13/1317; H02J13/18; H02J13/333; H02J13/34; H01; H01H; H01H2300/00; H01H2300/03; Y; Y02; Y02B; Y02B70/00; Y02B70/30; Y02B90/00; Y02B90/20; Y02E; Y02E60/00; Y04; Y04S; Y04S10/00; Y04S10/18; Y04S20/00; Y04S20/14; Y04S20/20

Claims Analysis

Total Claims: 21
Claim 1
Independent Claim 182 words
An energy management load panel arrangement, comprising: a load panel enclosure; a plurality of circuit breakers secured in the enclosure, each of said circuit breakers capable of opening and closing in response to a control signal so as to interrupt an associated current path; at least one microcomputer for generating said control signals to control said circuit breakers and their associated current paths; a real-time-clock circuit, coupled with said at least one microcomputer, for automatically providing the time of day; a volatile memory circuit for storing time-event data which is used to indicate when at least one of said control signals should be generated; and an electronic multi-layered capacitor coupled to said volatile memory for providing operating power thereto for a significant period of time during a power outage; wherein the time-event data is retained during the power outage so that the circuit breakers are timely controlled, after the power outage, in response to said control signals, and the microcomputer automatically reads the time of day in the real time clock and, based thereon, corrects the time-event data in the volatile memory.
Claim 2
Dependent Claim 182 words
An energy management load panel arrangement, comprising: a load panel enclosure; a plurality of circuit breakers secured in the enclosure, each of said circuit breakers capable of opening and closing in response to a control signal so as to interrupt an associated current path; at least one microcomputer for generating said control signals to control said circuit breakers and their associated current paths; a real-time-clock circuit, coupled with said at least one microcomputer, for automatically providing the time of day; a volatile memory circuit for storing time-event data which is used to indicate when at least one of said control signals should be generated; and an electronic multi-layered capacitor coupled to said volatile memory for providing operating power thereto for a significant period of time during a power outage; wherein the time-event data is retained during the power outage so that the circuit breakers are timely controlled, after the power outage, in response to said control signals, and the microcomputer automatically reads the time of day in the real time clock and, based thereon, corrects the time-event data in the volatile memory.
Claim 3
Dependent Claim 24 words
An energy management, load panel arrangement, according to claim 1, wherein said volatile memory circuit and said microcomputer are packaged in separate integrated circuits.
Claim 4
Dependent Claim 24 words
An energy management, load panel arrangement, according to claim 1, wherein said electronic multilayered capacitor is coupled to provide power to said real-time clock.
Claim 5
Dependent Claim 30 words
An energy management, load panel arrangement, according to claim 3, wherein said electronic multilayered capacitor is arranged so that it does not provide power to said at least one microcomputer.
Claim 6
Dependent Claim 30 words
An energy management, load panel arrangement, according to claim 1, wherein said electronic multilayered capacitor is arranged so that it does not provide power to said at least one microcomputer.
Claim 7
Dependent Claim 34 words
An energy management, load panel arrangement, according to claim 1, wherein said time-event data is used by said at least one microcomputer to determine when to generate at least one of said control signals.
Claim 8
Dependent Claim 28 words
An energy management, load panel arrangement, according to claim 1, further including current blocking means, coupled to said electronic multilayered capacitor, for blocking current therefrom to said microcomputer.
Claim 9
Dependent Claim 20 words
An energy management, load panel arrangement, according to claim 1, wherein said electronic multilayered capacitor is a double layered capacitor.
Claim 10
Dependent Claim 41 words
An energy management, load panel arrangement, according to claim 1, wherein said microcomputer is programmed to compare, after recovering from the power outage, the time of day provided by the real time clock and the time event data in volatile memory.
Claim 11
Dependent Claim 18 words
An energy management, load panel arrangement, according to claim 1, wherein said time-event data includes a duration timer.
Claim 12
Dependent Claim 192 words
An energy management load panel arrangement, comprising: a load panel enclosure; a plurality of circuit breakers secured in the enclosure, each of said circuit breakers capable of opening and closing in response to a control signal so as to interrupt an associated current path; at least one microcomputer also in said load panel enclosure for generating said control signals to control said circuit breakers and their associated current paths; a real time clock circuit, coupled to the microcomputer for providing the time of day automatically; a volatile memory circuit for storing time-event data which is used to indicate when at least one of said control signals should be generated; and an electronic double-layered capacitor coupled to the real time clock and to said volatile memory for providing operating power thereto for a significant period of time during a power outage; wherein the time-event data is retained during the power outage so that the circuit breakers are timely controlled, after the power outage, in response to said control signals, and the microcomputer reads the time of day in the real time clock and, based thereon, corrects the time-event data in the volatile memory.
Claim 13
Dependent Claim 192 words
An energy management load panel arrangement, comprising: a load panel enclosure; a plurality of circuit breakers secured in the enclosure, each of said circuit breakers capable of opening and closing in response to a control signal so as to interrupt an associated current path; at least one microcomputer also in said load panel enclosure for generating said control signals to control said circuit breakers and their associated current paths; a real time clock circuit, coupled to the microcomputer for providing the time of day automatically; a volatile memory circuit for storing time-event data which is used to indicate when at least one of said control signals should be generated; and an electronic double-layered capacitor coupled to the real time clock and to said volatile memory for providing operating power thereto for a significant period of time during a power outage; wherein the time-event data is retained during the power outage so that the circuit breakers are timely controlled, after the power outage, in response to said control signals, and the microcomputer reads the time of day in the real time clock and, based thereon, corrects the time-event data in the volatile memory.
Claim 14
Dependent Claim 37 words
An energy management, load panel arrangement, according to claim 11, wherein the microcomputer is programmed to read the time of day in the real time clock and to store an image thereof in the volatile RAM periodically.
Claim 15
Dependent Claim 22 words
An energy management, load panel arrangement, according to claim 12, wherein the periodic storage of said image occurs about once per minute.
Claim 16
Dependent Claim 18 words
An energy management, load panel arrangement, according to claim 11, wherein the time-event data includes a duration timer.
Claim 17
Dependent Claim 32 words
An energy management, load panel arrangement, according to claim 14, wherein after the power outage, the microcomputer corrects the duration timer according to the time of day in the real time clock.
Claim 18
Dependent Claim 40 words
An energy management, load panel arrangement, according to claim 13, wherein the time-event data includes a duration timer and after the power outage the microcomputer corrects the duration timer according to the time of day in the real time clock.
Claim 19
Dependent Claim 27 words
An energy management, load panel arrangement, according to claim 11, further including current arbitration means for maintaining the charge on the capacitor until the power outage occurs.
Claim 20
Dependent Claim 19 words
An energy management, load panel arrangement, according to claim 17, including a switch for resetting said current arbitration means.
Claim 21
Dependent Claim 30 words
An energy management, load panel arrangement, according to claim 17, wherein said electronic double-layered capacitor is arranged so that it does not provide power to said at least one microcomputer.

References Cited (Backward Citations)

US4213182A Cited
US4217646A Cited
US4293915A Cited
US4466074A Cited
US4467434A Cited
US4467260A Cited
US4701858A Cited
US4978911A Cited
US4964058A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1997-05-23 1997-11-22 1998-05-24 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2001-05-23 2001-11-22 2002-05-24 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2005-05-23 2005-11-22 2006-05-24 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag